Laserfiche WebLink
RIM ELE\ <br />NOT FIN/ <br />RIM ELEV <br />NOT FINA <br />• <br />• <br />Know what's b@IOW. <br />Call before you dig. <br />CITY OF EVERETT SD <br />STANDARD NOTES: <br />1. NO PART OF THE DRAINAGE SYSTEM <br />SHALL BE COVERED, CONCEALED, OR <br />PUT INTO USE UNTIL IT HAS BEEN <br />INSPECTED, TESTED, AND ACCEPTED <br />BY THE CITY OF EVERETT. <br />2. ALL WORK AND MATERIAL SHALL <br />CONFORM TO THE CITY OF EVERETT <br />DESIGN AND CONSTRUCTION <br />STANDARDS AND SPECIFICATIONS AND <br />THE WSDOT/APWA STANDARD <br />SPECIFICATIONS FOR ROAD, BRIDGE, <br />AND MUNICIPAL CONSTRUCTION <br />(CURRENT EDITION). <br />3. APPROXIMATE LOCATIONS OF EXISTING <br />UTILMES HAVE BEEN OBTAINED FROM <br />AVAILABLE RECORDS AND ARE SHOWN <br />FOR CONVENIENCE. THE CONTRACTOR <br />SHALL BE RESPONSIBLE FOR <br />VERIFICATION OF LOCATIONS AND TO <br />AVOID DAMAGE TO ANY ADDITIONAL <br />UTILITIES SHOWN. IF CONFLICTS WITH <br />EXISTING UTILITIES ARISE DURING <br />CONSTRUCTION, THE CONTRACTOR <br />SHALL NOTIFY THE PUBLIC WORKS <br />INSPECTOR AND ANY CHANGES <br />REQUIRED SHALL BE APPROVED BY <br />THE CITY ENGINEER PRIOR TO <br />COMMENCEMENT OF RELATED <br />CONSTRUCTION ON THE PROJECT. <br />4. ALL STORM SYSTEMS WITHIN THE <br />PUBLIC RIGHT-OF-WAY OR IN <br />EASEMENTS MUST BE STAKED BY <br />SURVEY FOR LINE AND GRADE PRIOR <br />TO STARTING CONSTRUCTION. <br />5. ALL CATCH BASIN GRATES MUST BE <br />STENCILED OR STAMPED "DUMP NO <br />WASTE, DRAINS TO STREAM, LAKE, <br />RIVER, PUGET SOUND, OR WETLAND." <br />CHOOSE APPROPRIATE FEATURE FOR <br />THE PROJECT <br />6. DESIGN SHALL COMPLY WrrH THE <br />EVERETT MUNICIPAL CODE (EMC), CITY <br />ADOPTED STORMWATER MANAGEMENT <br />MANUAL, POLICIES AND CRITERIA SET <br />FORTH IN THE CITY OF EVERETTS <br />DESIGN AND CONSTRUCTION <br />STANDARDS do SPECIFICATIONS. <br />STORM STRUCTURES <br />CB#1, TYPE 2 - 48". W/ VANED GRATE <br />RIM=560.05 <br />53.62 (12" S) IE=553.54 <br />'E -ter (4" W) IE=553.95 <br />IE=553.62 (12" E)(EXISTING) <br />CB#2, TYPE 2 - 48". W/ VANED GRATE <br />-RIM-56e­311- RIM=560.18 <br />'E-`��_ (12" W) IE=553.56 <br />r--553.93 (12" N) I E=553.56 <br />CB#3, TYPE 2 - 480. W/ VANED GRATE <br />R+k�=5sw3e- RIM=561.25 <br />IE=554.46 (12" W) IE=553.62 <br />IE=557.65 (6" N) <br />6 (12" E) IE=553.37 <br />EX CB-29, <br />RIM-559.69- RIM=560.00 <br />-69 (12" E) IE=554.64 <br />IE=554.74 (12" W)(EXISTING) <br />IE=554.69 (12" S) (EXISTING) <br />EX CB-32, <br />R1111-550.50 RIM=559.87 <br />IE=556.24 (12" E)(EXISTING) <br />(6" N) I E=556.79 <br />IE=556.24 (12" W)(EXISTING) <br />EX CB-34, <br />RIM=560.15 <br />IE=556.59 (12" E)(EXISTING) <br />IE-55:7.49 (6" NW) I E=557.39 <br />SDCO#1, 6" CLEANOUT <br />RIM=561.10 <br />IE=557.90 (6" W) <br />SDCO#2, 6" CLEANOUT <br />RIM=561.42 <br />IE=557.71 (6" S) <br />SDCO#3, 6" CLEANOUT <br />�",,,,�-1;-32 RIM=560.85 <br />',E-1131537.90 (6" S) IE=557.73 <br />SDCO#4, 6" CLEANOUT <br />RIM=560.88 <br />(6" SE) IE=558.13 <br />UTILITY CONFLICT NOTE: <br />0 10' 20' 40' <br />ii <br />SCALE: 1 "=20' <br />Cq <br />ao <br />co <br />w <br />0 <br />04 <br />Zo <br />0 <br />U Np <br />�o <br />w� <br />O <br />Q M <br />0o <br />J <br />w w <br />z U <br />of <br />09 <br />�G_ % <br />° <br />I I YARD DRAIN <br />" RIM=546.28' <br />G - G - c 6" PVC N IE=545.13' <br />4" PVC S IE=545.18' <br />W- W- W W 4" PVC W IE=545.13' <br />GRADING AND DRAINAGE PLAN <br />FOR <br />FORIVIOST FUJI <br />A PORTION OF THE NW1/4, OF THE SW1/4 OF SEC. 12, <br />TWP. 28N., RGE 4E., W. M. <br />CITY OF EVERETT, SNOHOMISH COUNTY, WASHINGTON <br />3 I <br />0 <br />BUILDING HEIGHT <br />=52.07' <br />d <br />I Q L <br />I CB STD GRT <br />3 II ,\\ A. ° .. RIM=546.16' <br />a <br />I V I I `,\ : ,;�• a: 6" PVC N IE=543.96' <br />BSc in \ <br />II a p + . PN 28041200306000 <br />a <br />I) LIB I <br />. EXISTING BUILDING <br />.° . 43,550 SF <br />4. 14 <br />° `A. <br />G FINISH FLOOR _ DOWNSPOUT #4 FF=561.40 <br />BLOW OUT SEE MEP PLANS FOR DETAILS <br />I \ ° CONNECT TO SDCO#4 <br />CB STD GRT ; a=546.51' <br />RIM=559.23' I w a' FAUCET <br />12" ADS N IE=553.93' °' d °, <br />a JBOX e d . ;: DC <br />12" ADS S IE=553.83''� I ; • FINISH FLOOR \ <br />�=561.40' , + - ,35s1-SF- <br />W_ W \° FF=561.40 <br />\ y ° / ° DETAEE WALKW Y/ADA <br />D -` b61.4$I \ <br />II 1 I WATER O O <br />ud n�i <br />II 0 I�' METER\ RIM ELEV -•24.5 •---- - - - - - - - - - - - - - - - - <br />3 I W-"- w- W- F-w-WNOT FINAL 6 .40 3g LF 6" CPEP PIPE <br />II \I (-) SD ® 7% /___56 6 5 �561 <br />DOWNSPOUT #3 <br />SEE MEP PLANS FOR DETAILS <br />CONNECT TO SDCO#3 <br />RIM ELEV ALKWAY/A <br />NOT FINAL ON SHEET <br />IT I <br />Ji urui <br />I 3 <br />559.9 L� <br />I <br />e+i <br />11• � / 3 a <br />�h� SD- D SD39 <br />9 ► B#1 I II <br />i 311 1 <br />iI 1 g35�„ i R <br />� III <br />.23I <br />15% II <br />I (01 1 3: <br />;II 3 <br />- - - - - - - - 561.40 SD O# DRAINAGE SWALE 561.40 o I ; IN <br />° I <br />III 3 ;I <br />12 LF 6" CPEP PIPE 7 - ---- - ^ II•-561- p } , <br />_ ° <br />-SB 0 0 50X ----- --561- ---- <br />FINISH FLOOR <br />=546.50' <br />GENERATOR PAD - <br />ELEV 561.05 <br />COOLING TOWER PAD - <br />// \ ELEV 561.05 <br />/ \ CONNECT 4" PERFORATED PVC BUILDING <br />(BUILDING EXPANSION (W REHOUSE) FOUNDATION DRAINPIPE TO CB#1 <br />I \ $'705 S 44.3 -44 LF 12" CPEP PIPE- <br />T FF.440 SD <br />\ / DOWNSPOUT #1 0.05% <br />SEE MEP PLANS FOR DETAILS DRAINAGE <br />DOWNSPOUT #2 CONNECT TO SDCO#1 / \' <br />JGG MEP PLANS FOR DETAILS / \ J/ v <br />CONNECT TO SDCO#2 1 J <br />SDCO#2 40 LF 6" CPEP PIPE / <br />D ®050% <br />- - - 50' PRIVATE ACCESS EASEMENT I CCO <br />4 _ 0 061 E i <br />H ° - 0.7 /o ° e a 562 <br />CB STD GRT I \ 'AFN 201305295004 f I ' a Cp ° e e ° ° d e 4 , -N _ �563- r564--- _w w w, <br />r d . <br />RIM=561.59' „�, - - CB STD GRT - - - - _ - - S _ d�• 560 `�' 560. f 3 -- -- - - ' <br />„ I I _ 9 _ ________1 �_ 79.8 =00 LF°12` P PIPE 564.8 f <br />12 ADS N IE=556.84' -`---------- ------_--_----- - --- - -_ - 1= � 4- � - - - - - - - -I� <br />3 I RIM=559.98 560.71f ME - - - - - + - �- - - S r f '�(2� SD 0 a <br />12" ADS E IE=556.84' 0 12" ADS W IE=557.08' f ME �� i 560.19f ME f i st 5 cS` 6 ° 8 /1--� / ' <br />12" ADS S IE=556.79' • 1 1 � 6 � ' 560.05 � 0.• f ME � i A9 � `` 60 -..N�� � � 1 5 � f ME �\ ' �� � 9 I I <br />; M _ i _ ___ _ �' - UTILITY EASEMENT_ -�� 3 ' <br />D - SD - SDI- ��- SD - SD - SD - SD UTILITY EASEMENT so - s sD sD - aE------ - __ __ SD - - SD - SD - SD SD - SD ;� , <br />II I o I 0 �' 56��.1� ME " 8 AFN 201712070203 <br />3 N 3 SEE WALKWAY/ADA EX CB-34 �560.13f \ a w W W- W- w w- w- w w- w III <br />AFN 201712070203 - <br />DETAIL #3 ON SHEETD -�g� 560.34f ME`- 23.0 i9•99t ME �S _' _ 37✓ LF 12 PIPF� - w - w w -�' - I <br />� - - - - - - - - - - - - - -- w = w - 9� �+- �= °s^' - w w - " W - - w - i LFw 6" CPEPw PIPE - w �3f "{ulE wX C 29�� ®w�. 8" IP PUC WATERMAI 50' PRIVATE ACCESS EASEMENT <br />II w 9* W w -W-: - i- w ---- w - W - W=---------- w W------------------------- --� f CB STD GRT EX CB-32 c� E I 2-8°/ E �EMNN � HYDRANT 6 AFN 2013 35295004 f <br />I'ff•'� a��sa aoLsin WMIA A A RIM=559.70' SD ®. 3 66 r y ° <br />a 1, \ HYDRANT I 1 \ g �! I 12" ADS E IE=556.50' S0 4.1% <br />\ I ' _ 9, y_ 0 0 3 E ° 12" ADS W IE=556.55' - y y a ) ff <br />WATER <br />^iI ; I J \ I o �, 1 cn FLAG POLE - I TANK / o <br />�5 0.60 JBOX N / ; , <br />N 3 WATER--I--L- -- - - 1�_= <br />CB STD GRT II PNO)-_ I o-� °a WETERPOWER �3`,"m' b� I VAULTI II <br />RIM=562.95' a olI \ SD w 560.8 d . o . a' d a �'. h JBOX- _ / o f <br />12" ADS N IE=557.80 I I y \ II � 50 � � � 1562------ - 1 I I . i ° � I � � ° �0 � II �I II zl ' <br />12" ADS SE IE=557.80 -> 0 I <br />\ _ <br />12" ADS S IE=557.65' I I \ II s so 5 - \�� POWER <br />\� -- - - -- - - - - - _-__-_-�-- -- �c -- CONDUIT ---- -�� -------------� II ;I iI <br />II II, I I \ II - SD SD SD D - SD SD SD - 5D - S - SD SD SD S D <br />III \ \ \ II II 10 ELECTRIC JBOX II 3 <br />I I B I CAR CHARGER a CABER N CB STD GRT <br />"11 ° a RIM=563.73' I ' <br />w i \ \ I II �: I I CONTRACTOR SHALL LOWER EXISTING J II 1 IIQ FLAG POLE / I 12" ADS N IE=559.38' / II II I II m W I III <br />le 0I-� UNDERGROUND POWER AS NEEDED ll N y 2" PVC N IE=562.23' �fl 51m ,;II <br />I\ I I TO PROVIDE 18" COVER (TYP.) o I I I I `� I 12" ADS S IE=559.35' ll ��� II o 3I o_ to ;III <br />IN Jr - <br />I \ II��-_ -- E o N-CB STD GRT a / / / II 0 II <br />"N II 1 1 ! CB STD GRT I o RIM=562.15 �p <br />III I 3 y _ o N 12 ADS W IE=558.90' I N II <br />\ 1 I RIM=561.88' 1 0 12" ADS S IE=558.90' <br />r Ix 1 1 1 I I I 12" ADS E IE=558.18' o I <br />12" ADS S IE 558.16' <br />£ 1 1 1 12" ADS NW IE 558.03' <br />o <br />oIl <br />------------------------ ----_ - I I� N -`/ / <br />P(U) P Uv�(UG) -E <br />Il_ I I II \ 1 I I III II �CB STD GRT T---------- I --- �r- _- <br />IC ; 1 I I II II IIB I I CB STD GRT II <br />IH I I RIM =565.09' <br />I I I 12" ADS'N IE=561.84' 3 III RIM=565.57' <br />a I I I I ( I y 6" PVC S IE=562.09' I 12" ADS N IE=562.77' <br />4" PVC S IE=562.95' <br />-I - I - <br />3 <br />a I I UTILITY EASEMENT <br />3 , AFN 201712070203 1 o <br />a <br />I I i I <br />I I I <br />a � <br />AEI WATER <br />Drl WI METER I <br />GRADING NOTES <br />THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING THE LOCATION, DIMENSION, AND DEPTH OF ALL <br />EXISTING UTILITIES WHETHER SHOWN ON THESE PLANS OR NOT BY POTHOLING THE UTILITIES AND SURVEYING <br />THE HORIZONTAL AND VERTICAL LOCATION PRIOR TO CONSTRUCTION. THIS SHALL INCLUDE CALLING UTILITY <br />LOCATE 0 811 AND THEN POTHOLING ALL OF THE EXISTING UTILITIES AT LOCATIONS OF NEW UTILITY <br />CROSSINGS TO PHYSICALLY VERIFY WHETHER OR NOT CONFLICTS EXIST. LOCATIONS OF SAID UTILMES AS <br />SHOWN ON THESE PLANS ARE BASED UPON THE UNVERIFIED PUBLIC INFORMATION AND ARE SUBJECT TO <br />VARIATION. IF CONFLICTS SHOULD OCCUR, THE CONTRACTOR SHALL CONSULT BARGHAUSEN CONSULTING <br />ENGINEERS, INC. TO RESOLVE ALL PROBLEMS PRIOR TO PROCEEDING WITH CONSTRUCTION. <br />1. ALL SPOT ELEVATIONS SHOWN ARE TO FINISH SURFACE (TOP OF ASPHALT <br />OR TOP OF CONCRETE PAVEMENT, NOT TOP OF CURB/SIDEWALK) UNLESS <br />OTHERWISE NOTED. <br />FF = FINISHED FLOOR <br />ME = MATCH EXISTING ELEVATIONS <br />TA = TOP OF PAVEMENT <br />TC = TOP OF CONCRETE SIDEWALK/CURB <br />FL = FLOWLINE <br />2. CONTRACTOR SHALL MATCH EXISTING ELEVATIONS AT ALL SAWCUT LOCATIONS. <br />3. PERMANENT SLOPES SHOULD BE INCLINED NO STEEPER THAN 2H:1V AND BE <br />PLANTED WrrH A DEEP-ROOTED, RAPID -GROWTH VEGETATIVE COVER AS <br />SOON AS POSSIBLE AFTER COMPLETION OF SLOPE CONSTRUCTION. <br />ALTERNATIVELY, THE SLOPE SHOULD BE COVERED IN PLASTIC, STRAW, ETC. <br />UNTIL IT CAN BE LANDSCAPED. <br />4. IMPORTED STRUCTURAL FILL SHALL CONFORM TO THE GEOTECHNICAL <br />REPORTS STANDARD SPECIFICATIONS. <br />5. NATIVE SOILS ARE MOISTURE SENSITIVE AND WILL REQUIRE CAREFUL <br />CONTROL OF MOISTURE TO FACILITATE PROPER COMPACTION PER THE <br />GEOTECHNICAL REPORT. <br />6. GROUNDWATER SEEPAGE WAS ENCOUNTERED IN 2016 BORINGS AT A DEPTH <br />BETWEEN 1 AND 5 FEET BELOW GROUND SURFACE. PERCHED GROUNDWATER <br />LEVELS AND FLOW RATES WILL FLUCTUATE SEASONALLY WITH THE HIGHEST <br />LEVELS OCCURRING DURING AND SHORTLY FOLLOWING THE WET WINTER <br />MONTHS (OCTOBER THROUGH MAY). DEWATERING MEANS AND METHODS <br />SHOULD BE DEVELOPED IN CASE SEEPAGE IS ENCOUNTERED. <br />7. THE BUILDING EXPANSION FOUNDATION SHALL BE SUPPORTED BY <br />CONVENTIONAL SPREAD FOOTING FOUNDATIONS, SIMILAR TO THE EXISTING <br />BUILDING. <br />a <br />'`P(U <br />•- I <br />8 <br />P(UG) p <br />JBOX 8 <br />QG� I II / LIL2I39III <br />- P(UG) (U II ICI <br />I o ; <br />-� - - - - - - - - - --- �, I I �I <br />IIo I i`II <br />CB STD GRT °• II 3 I 11 <br />RIM=568.00' � <br />I� <br />12" ADS N IE=563.80' I r I� II I III I III <br />6" PVC S IE=564.12' II I I <br />LIMIT OF BARGHAUSEN CONSULTING ENGINEER I ; <br />TOPOGRAPHIC SURVEY DATED 3/2/2023 ; <br />RECORD DRAWING <br />AS -BUILT RECORD DRAWING PREPARED <br />BY HARMSEN LLC., <br />EVERETT, WASHINGTON ON 4/25/24 <br />FIELD WORK COMPLETED 4/25/24 <br />AND RECORDED INFIELD BOOK # 1303 <br />ITEMS NOT MARKED ARE UNCHANGED OR <br />COULD NOT BE VERIFIED IN THE <br />AS -BUILT SURVEY. <br />UTILITY EASEMENT <br />AFN 201712070203 <br />, S A-W \ <br />r7ti- Goo <br />4: <br />220T9143 <br />4. 10 �` <br />�AL LA'S <br />® CALLOUT By: Project Engineer/Surveyor�j Date 3/21/24 <br />1. ASPHALT PAVEMENT (PER DETAIL ON SHEET C7). <br />2. CEMENT CONCRETE CURB AND GUTTER TYPE A-1(PER DETAIL ON SHEET C7). <br />3. CEMENT CONCRETE CURB TYPE E-2 (PER DETAIL ON SHEET C8). <br />4. EXTRUDED CEMENT CONCRETE CURB (PER DETAIL ON SHEET CB). <br />5. CEMENT CONCRETE SIDEWALK (PER DETAIL ON SHEET CB). <br />6. CURB RAMP TYPE C (PER DETAIL ON SHEET C8). <br />7. MODIFIED CURB RAMP TYPE D (PER DETAIL ON SHEET CB). <br />8. CEMENT CONCRETE CURB AND GUTTER PAN (PER DETAIL ON SHEET C8). <br />9. CATCH BASIN TYPE 2 (PER DETAIL ON SHEET C8). <br />10. MODIFIED VARIABLE HEIGHT CEMENT CONCRETE CURB TYPE E-2 (PER DETAIL ON SHEET C8). <br />LEGEND <br />BARGHAUSEN CONSULTING <br />'HIC SURVEY DATED 3/2/ <br />CB STD GRT <br />RIM=561.16' <br />12 ADS N IE=553.26' <br />12" ADS W IE=553.36' <br />12" ADS S IE=553.36' <br />vi <br />0 <br />6 0 <br />N <br />o CB STD GRT <br />RIM=576.17' <br />24" PVC N IE=564.99' <br />18" PVC S IE=564.87' <br />N <br />I <br />NEW ASPHALT PAVEMENT SPOT ELEVATION <br />01" MATCH EXISTING ELEVATION <br />d <br />0 <br />0 <br />0 <br />00 <br />;%o <br />n <br />N <br />a� <br />�o <br />O <br />wo <br />J <br />ww <br />Z U <br />09 <br />92.25 <br />� 92.47f ME <br />R <br />T <br />I6 <br />Z <br />Z <br />J <br />IL <br />W <br />Q <br />Z <br />_ <br />ILL <br />U) <br />O0 <br />O <br />Z <br />Q <br />Z <br />0 <br />Q� <br />o� <br />LU 0 <br />Z 00 <br />W Q <br />LL Q <br />� H J <br />0 � J <br />r <br />Z <br />O N <br />V/ O <br />r <br />- 4/5/23 <br />C <br />N U <br />N <br />II :E <br />M <br />N <br />3 <br />3 <br />m <br />0 <br />N <br />d <br />y <br />M <br />c' <br />3 <br />3 <br />o <br />p <br />0 <br />� <br />U <br />Q <br />0 <br />t� <br />E <br />c <br />0 <br />V) <br />� <br />C <br />� t <br />"Tl1 <br />O IT <br />() L <br />All <br />0 <br />m <br />W <br />N M <br />m <br />}'Co <br />0 0') N <br />>a <br />in <br />P <br />N <br />i <br />��+' <br />/m <br />W <br />0 <br />U <br />r4 N <br />00 Ct <br />e° d. CONCRETE PAVEMENT G M <br />® STORM DRAINAGE CATCH BASIN, N <br />PROPOSED CONTOUR ------- �5------- TYPE 2 W/ VANED GRATE Z <br />EXISTING CONTOUR 15 c N N <br />1.50% N <br />PROPOSED GRADING SLOPE <br />0� <br />J <br />a- <br />N <br />M <br />N <br />0 <br />0 <br />01 <br />r7 <br />3 <br />cID <br />I <br />M <br />N <br />r` <br />N <br />N <br />i <br />rn <br />N <br />r_ <br />Cn <br />M <br />N <br />r` <br />N <br />i <br />U) <br />0 <br />0 <br />0 <br />CV <br />N <br />o_ <br />