FOREST DRIVE SP
<br />SECTION 36, TOWNSHIP 29N, RANGE 4E, W.M.
<br />WATER STANDARD NOTES:
<br />A. NO CONNECTION TO THE EXISTING MAINS WILL BE ALLOWED EXCEPT BY MEANS
<br />OF AN APPROVED BACKFLOW PREVENTION DEVICE PRIOR TO SATISFACTORY
<br />FLUSHING, TESTING, DISINFECTION, AND RECEIPT OF SATISFACTORY
<br />BACTERIOLOGICAL TEST RESULTS.
<br />B. CONNECTIONS TO AND TAPS ON EXISTING MAINS WILL BE MADE BY THE PUBLIC
<br />WORKS DEPARTMENT AT THE DEVELOPER'S EXPENSE. THE PUBLIC WORKS
<br />DEPARTMENT SHALL BE GIVEN AT LEAST 5 BUSINESS DAYS NOTICE FOR
<br />EACH CONNECTION. THE PUBLIC WORKS DEPARTMENT SHALL THEREAFTER DETERMINE
<br />THE DATE AND TIME AT WHICH THE CONNECTION SHALL BE MADE.
<br />>11r��i�Nl l:4 W-AlIIBM L•I_\IN:II116yl•1I1,KKole] ►10]:ll•Mlox$]rr'ti]aIM/II:1aa�9/_111/L1:I
<br />D. A PRE -CONSTRUCTION MEETING SHALL BE HELD WITH THE CITY PRIOR TO THE
<br />START OF CONSTRUCTION. THE CITY OF EVERETT PUBLIC WORKS CONSTRUCTION
<br />DIVISION MUST BE NOTIFIED AT LEAST 24 HORS PRIOR TO
<br />COMMENCEMENT OF CONSTRUCTION.
<br />E. THE DEVELOPER OR THE DEVELOPER'S AUTHORIZED AGENT SHALL NOTIFY THE
<br />PUBLIC WORKS DEPARTMENT OF A PERSON WHO CAN BE CONTACTED REGARDING
<br />PROBLEMS DURING CONSTRUCTION ON A 24 HOUR BASIS.
<br />F. MAINTAIN A MINIMUM OF 10 FEET HORIZONTAL AND 18 INCHES VERTICAL
<br />SEPARATION BETWEEN POTABLE AND NON -POTABLE CONVEYANCE SYSTEMS.
<br />G. ALL CITY OF EVERETT VALVES SHALL BE OPERATED BY PUBLIC WORKS
<br />DEPARTMENT PERSONNEL ONLY. ALL VALVES, NEW AND EXISTING, SHALL BE
<br />ACCESSIBLE AT ALL TIMES.
<br />SEWER STANDARD NOTES:
<br />A. ALL WORK AND MATERIALS SHALL CONFORM TO THE CITY OF EVERETT STANDARDS
<br />AND WSDOT/APWA STANDARD SPECIFICATIONS.
<br />B. NO PART OF THE SANITARY SEWER SYSTEM SHALL BE COVERED, CONCEALED OR
<br />PUT INTO USE UNTIL IT HAS BEEN
<br />TESTED, INSPECTED, AND APPROVED BY THE CITY INSPECTOR.
<br />C. APPROXIMATE LOCATIONS OF EXISTING UTILITIES HAVE BEEN OBTAINED FROM
<br />AVAILABLE RECORDS AND ARE SHOWN FOR CONVENIENCE. THE CONTRACTOR SHALL
<br />BE RESPONSIBLE FOR VERIFICATION OF LOCATIONS AND TO
<br />AVOID DAMAGE TO ANY ADDITIONAL UTILITIES NOT SHOWN. IF CONFLICTS WITH
<br />EXISTING UTILITIES ARISE DURING CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY
<br />THE PUBLIC WORKS INSPECTOR AND ANY CHANGES REQUIRED SHALL
<br />BE APPROVED BY THE CITY ENGINEER PRIOR TO COMMENCEMENT OF RELATED
<br />CONSTRUCTION ON THE PROJECT.
<br />D. ALL SEWER MAIN EXTENSIONS WITHIN THE PUBLIC RIGHT-OF-WAY OR IN EASEMENTS
<br />MUST BE STAKED BY SURVEY FOR LINE AND GRADE PRIOR TO STARTING
<br />CONSTRUCTION.
<br />e31121Mall'if,Ia&V,&312IMKILIs] 1:
<br />IINMI awe] IFATAI IFWAI 1aK r/; 1:Zeh911; I:i.9:nW111•ALI_11►11aII_1►to] INMI a
<br />PRESSURIZED SEWER MAIN PER THE DELINEATION PROVIDED IN THE "TYPICAL
<br />GRINDER SYSTEM SERVICE CONNECTION DETAIL" IF IT IS CONSTRUCTED
<br />ACCORDING TO CITY STANDARDS AND THIS PLAN SET. ALL OTHER ELEMENTS
<br />OF THE GRINDER PUMP SYSTEM, INCLUDING THE PRESSURIZED SERVICE LINE
<br />BETWEEN THE GRINDER PUMP AND THE CITY -OWNED PRESSURIZED MAIN,
<br />SHALL BE OWNED AND MAINTAINED BY THE CUSTOMER.
<br />ENVIRONMENTAL -ONE (E/ONE) GRINDER PUMP SYSTEM (MODEL: SPD PUMP),
<br />TO BE APPROVED BY THE CITY PRIOR TO CONNECTION TO 1.5" MAIN.
<br />ONLY SANITARY WASTEWATER, PER EMC 14.08.230, SHALL BE DISCHARGED
<br />INTO THE TANK: ROOF DRAINS AND OTHER STORMWATER SOURCES SHALL BE
<br />STRICTLY EXCLUDED.
<br />GRINDER SYSTEM TANKS SHALL HAVE A MINIMUM OF 24 HOURS OF
<br />EMERGENCY STORAGE VOLUME (70 GALLONS PER ERU SERVED). STORAGE
<br />VOLUME IS DEFINED AS THE VOLUME BETWEEN THE "OFF" SWITCH AND THE
<br />TOP OF THE TANK. IF A HIGH WATER TABLE IS ENCOUNTERED A FOOTING
<br />DRAIN SHALL BE INSTALLED AROUND THE TANK & DISCHARGE TO A ROCK PAD
<br />WEST OF THE EX. OR PROPOSED SFR'S.
<br />RECORD DRAWING
<br />This Record Drawing has been prepared, in part,
<br />based on "As -Built" information provided by
<br />others. Though the as -built information and this
<br />drawing are based on the best available
<br />information, no presumption should be made
<br />regarding the drawing's accuracy.
<br />Jim Knappert 11/13/2024
<br />Permit Inspector
<br />N
<br />GRINDER SYSTEM FORCE MAIN NOTES
<br />1. A 10OPSI PRESSURE TEST SHALL BE PERFORMED ON THE PROPOSED MAINLINE.
<br />2. MAINLINE. THE MINIMUM PIPE SIZE USED IS 1.5 INCHES NOMINAL DIAMETER.
<br />PIPE WILL BE HDPE.
<br />3. SERVICE LINE. SERVICE CONNECTION PIPE WILL BE MINIMUM 1-INCH DIAMETER,
<br />SCHEDULE 80 PVC WATER PIPE, SOLVENT WELD JOINT OR HDPE LOCATED AT ✓ /
<br />90 DEGREES
<br />TTHE
<br />M2 64NE WHEN POSSIBLE. PVC PIPE AND FITTINGS WILL
<br />COMP YWITH ASTMD
<br />/ N ///
<br />4. A BALL VALVE AND CHECK VALVE WILL BE INSTALLED AT THE END OF THE / // / ////'
<br />SERVICE STUB -OUT AT THE PROPERTY LINE OR AS APPROVED BY THE CITY / i / //// �// j%// ////�i✓/� 1��� FFF17 4.WLT
<br />INSPECTOR AND INSTALLED IN A VALVE BOX PURSUANT TO CITY STANDARDS. //i//1�1"x6j TEE (4JxFL) / I
<br />0)1-11HYD. ASSEMBLY /
<br />5. BUILDING SEWER. THE GRAVITY BUILDING SEWER BETWEEN THE BUILDING AND /r////j �j ,l ////// / / 1-e' CAP (MJ) I I
<br />THE TANK WILL BE DESIGNED AND INSTALLED IN ACCORDANCE WITH THE //// f / /�//// / //THRUI BLOCKING f;
<br />UNIFORM PLUMBING CODE AS ADOPTED BY THE CITY. THE OWNER WILL BE/��i� / //'3p76j/
<br />RESPONSIBLE FOR MAINTENANCE OF THE BUILDING SEWER. �/I / / // z/
<br />6. ALL PIPE WILL BE INSTALLED WITH CONTINUOUS TRACER TAPE INSTALLED 12
<br />TO 18 INCHES UNDER THE PROPOSED FINISHED GRADE. THE MARKER TAPE
<br />WILL BE MARKED "SEWER" AND BE PLASTIC, NON-BIODEGRADEABLE METAL"PVC \\(TYP;
<br />CORE OR BACKING THAT CAN BE DETECTED BY A STANDARD METAL J/� �� j // VEE SEKCE �\ F
<br />DETECTOR. TAPE WILL BE TERRA TAPE "D" OR APPROVED EQUAL. IN / j ' /� // �ONNECTI PAP
<br />ADDITION TO TRACER TAPE, INSTALL 14-GAUGE GREEN -COATED COPPER _/ / // // /DEETAI�)) GP
<br />WIRE WRAPPED AROUND THE PIPE, BROUGHT UP AND TIED OFF AT THE VALVE
<br />BOXES.
<br />'/2 /
<br />�� /�24 LF 8" D.I.
<br />ri I ST/I112+�1 46 2 44'LT
<br />N /I
<br />'
<br />I
<br />\
<br />.\\
<br />1 \
<br />l A
<br />I
<br />\
<br />4
<br />E—ONE GRINDS
<br />PUMP ASSEM4
<br />�TYP) \
<br />METER/ -BOX
<br />(SEE DEI. THIS SHT.)
<br />\
<br />XA0
<br />Ll /
<br />� \ S
<br />P
<br />\ 1
<br />24 LF
<br />6" DI
<br />\ AB)
<br />\
<br />STA 14+52.05, 5.70'R
<br />I /J//
<br />I
<br />'X—CAP & PLUG
<br />A
<br />11-22.5• BEND \ I ;'r ,'' ` ` ST/A 14/ 50.2� , 5.74'RT I I //
<br />THRUST BLOCKING
<br />/ 5\0 a• �� 1� AIR �AC. / / /J///J
<br />V/
<br />STA 1 �91.29, `5,54�LT
<br />P 1-8"IC6 TEE (FLxMJ
<br />EX. 8" / (AB)1-qYD. ASSEMBLYI
<br />WATERAIN THRUST BLOCKING
<br />) I '
<br />r /^ 1-SLOW OFF (AB) / 1 ./ ,•'� �
<br />I \\TA 12+00.03, 1.60'LT
<br />CONNECT TO EX. W I I {' 7
<br />STA 1b+24.92, 6.05'K'TV (AB1-AIF� VAC
<br />)
<br />8" WATER MAIN >� ' \
<br />1-BLOW-OFF VALVE✓/ (SET AT HIGH POINT) ,,! �
<br />1-G.V. (MJxFL) fI
<br />0 I (SEA\AT LOW POINT)\ I I Q. E
<br />1--CAP (MJ) \ STA 11+83.06, 2.94'LT \ \
<br />THRUST BL CK41�G F_ \7 1-22.kBEND I \ 7
<br />STA 10+10.26, 4.75'�T Uj
<br />W- / 410 LF 8" D h� THRUST BLOCK-11�G/ ,
<br />STA 15+10.351 6.16L1T ( FOUN REBARy/8aCAPHOUSE
<br />1—CAP PLUG, SSCP ILL /_LS 4473"-----� �f— ------ -- \
<br />INTERSECTION
<br />— 1 _
<br />FOREST DRIVE 15+@b.00
<br />PRIVATE ROAD �Qt0O.00
<br />I
<br />I
<br />STA 1 4+99.17, I �-- 3rL7-r
<br />—
<br />1 —90' TEE
<br />DOUBLE Y
<br />(I
<br />II FORD REBAR & CA
<br />CLEAENOUT
<br />A
<br />"LS'4473"
<br />/
<br />"NO AARKING
<br />EX. 1
<br />ANYTI ME"
<br />PVMI
<br />1
<br />�
<br />- \
<br />I
<br />175 LF HDPE
<br />I
<br />SEWER FORQE MAIN
<br />SITE BENCHMARK
<br />r
<br />\ 1 p
<br />I 11
<br />MAG NAIL & WASHER
<br />I
<br />"ASPI CONTROL"
<br />%
<br />EL=307.52
<br />/ /I
<br />I
<br />I
<br />(11
<br />J \
<br />\
<br />I ° UNKNOWN UTJL TY
<br />\
<br />CLEAN —OUT
<br />I
<br />I
<br />DOUBLE ���
<br />CLEANOUT
<br />UTILIT OLE
<br />WITH L MP,
<br />STA 13+38.11, 14.08'LT TRA
<br />CONTRACTOR TO REMOVE OH N,
<br />EX. FLUSHING VALVE & EXTEND —
<br />2" HDPE FORCE MAIN
<br />NO
<br />� I
<br />O
<br />+
<br />ro
<br />I=
<br />60 FOUND
<br />_ NAIL/TAG
<br />E K&A LS 11033
<br />[3-�0 0.2'N X 0.4'E
<br />iAINCINK/ ��, / FENCE COR'J
<br />/ o / ONLINE J
<br />\ z - FOUNA REBAR AcICAP
<br />I _1 "LS d4473"
<br />JAB)PROP. V'I
<br />WATER METER ((TYPI)1
<br />PE� STD. DWG 501)
<br />SEE SHT.
<br />/ I I
<br />\ I I
<br />462 IkF 2" HDP \� /
<br />SEWER- FORCE
<br />MAIN I \\ \2
<br />/ \ I
<br />I \ I
<br />i
<br />S
<br />l
<br />I e ,
<br />(RAGE
<br />=13l 7.5
<br />/ 9
<br />A
<br />PROP.(A$� ✓ / /
<br />HYDRANT
<br />- - J ✓ ij / /
<br />— — J i / i ii // // /j // /l/
<br />//////J// /
<br />_ PROP.
<br />HYDRANT I I / >A \ >
<br />AB I I I /\ \ / /
<br />r ,
<br />\ A �70
<br />\ 17 LF 8 I I
<br />�) II 1
<br />NOTE: CONTRACTOR TO INSTALL
<br />BACKWATER VALVES AT TIME OF
<br />MAIN CONSTRUCTION.
<br />R/W
<br />LINE
<br />PRIVATE I CITY
<br />LARGE METER BOX
<br />OR EQUIVALENT.
<br />IJ
<br />I I
<br />z USE E/ONE
<br />N g LATERAL KIT
<br />I I
<br />I I
<br />TONING WIRE W/
<br />3' EXTRA LEFT
<br />IN THE BOX FOR
<br />BOTH WIRES.
<br />ISOLATION VALVE
<br />W/ RISER.
<br />ROAD
<br />SURFACE
<br />14 GA. GREEN INSULATED
<br />COPPER TONING WIRE WRAPPED
<br />AROUND THE PIPE WITH 3'
<br />EXTENDING UP IN VALVE BOX.
<br />z
<br />CONNECT TONING WIRE FOR
<br />SERVICE TO MAINLINE TONING
<br />WIRE AND WRAP CONNECTION
<br />W/ HEAT SHRINK WRAP.
<br />_ _ HDPE SDR11 1Ya'0 X MAIN DIA. PVC
<br />WELDED TEE.
<br />1" SCHEDULE
<br />80 PVC PIPE
<br />TYPICAL GRINDER SYSTEM SERVICE CONNECTION DETAIL
<br />N.T.S.
<br />AS -BUILT NOTE:
<br />THE AS -BUILT INFORMATION SHOWN WAS
<br />PROVIDED BY HARMSEN. OMEGA ENGINEERING HAS
<br />PREPARED AND STAMPED THIS DRAWING BASED
<br />ON THAT INFORMATION.
<br />i G
<br />Know what's below.
<br />Call two business
<br />days before you dig.
<br />11111111
<br />M
<br />I:
<br />N 00
<br />Q 00 � I
<br />LU rn
<br />OrnN
<br />U7 U7
<br />j� V V
<br />LUUU12
<br />} ~
<br />LU
<br />NLJ L
<br />Qz
<br />Z
<br />ed
<br />Z
<br />WW
<br />2 W
<br />Z
<br />0 3
<br />LU
<br />L1J
<br />0
<br />0
<br />o
<br />z
<br />/_
<br />Z
<br />>
<br />>o
<br />>�
<br />Fz
<br />U)
<br />U)
<br />M
<br />LU
<br />u1
<br />U
<br />Z
<br />U)
<br />Of
<br />W
<br />/W
<br />W
<br />0
<br />of
<br />L.L
<br />LL
<br />0
<br />0
<br />O°��
<br />0
<br />N
<br />L.L
<br />o
<br />_
<br />U
<br />o_
<br />PROD. NO. aBN. BY:
<br />22-0327 EJT
<br />DAZE:
<br />11 /8/2024
<br />scuE:
<br />1 " = 30'
<br />DRAWING NO.
<br />12 OF 15
<br />
|