Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 8/24/2023 8/24/2023 BLDG 08-FRAMING RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 8/21/2023 10:34 AM Deano Ramirez <br /> Framing insp for shaft walls P-1 thru P-6 <br /> Contact Name:Juan Carlos Gutierrez <br /> Site Address:2929 PINE ST <br /> Phone:3606312542 <br /> e-Mail:deano@alliancepartitions.com <br /> Elevator shaft 3 sides only.Elevator door not ready. <br /> 8/24/2023 8/24/2023 BLDG 10-DRYWALL RAKEEB KHAN PARTIAL <br /> NAILING APPROVAL <br /> Notes: <br /> Elevator shaft liner 3 sides. Elevator door side not ready. <br /> 8/31/2023 8/31/2023 BLDG 10-DRYWALL RAKEEB KHAN PARTIAL <br /> NAILING APPROVAL <br /> Notes: <br /> Lvl 2-6 3 walls for outside layer.Front elevator doors not framed in yet. <br /> 9/5/2023 9/6/2023 BLDG 08-FRAMING RAKEEB KHAN PARTIAL as noted <br /> APPROVAL <br /> Notes: <br /> Rooftop penthouse and electrical room ok to one side. Do not cover any electrical work.Inspected on 9/6/2023. <br /> 9/12/2023 9/15/2023 BLDG 08-FRAMING RAKEEB KHAN PARTIAL <br /> APPROVAL <br /> Notes: <br /> Lvl 1 mechanical room and enclosed room adjacent to elevator.Inspected on 9/12/2023. <br /> 9/22/2023 F9/25/2023 BLDG 12- RAKEEB KHAN PARTIAL <br /> INSULATION APPROVAL <br /> Notes: <br /> insulation in mechanical room Ivl 1. Inspected on 9/22/2023 <br /> 9/25/2023 9/25/2023 BLDG 10-DRYWALL RAKEEB KHAN PARTIAL <br /> NAILING APPROVAL <br /> Notes: <br /> Lvl 1 mechanical room. <br /> 9/29/2023 9/29/2023 BLDG 10-DRYWALL RAKEEB KHAN CANCELLED eTRAKiT Inspection Request <br /> NAILING <br /> Notes: <br /> 9/15/2023 3:07 PM Deano Ramirez <br /> Nailing Insp <br /> Contact Name:Juan Gutierrez <br /> Site Address:2929 PINE ST <br /> Phone:3606312542 <br /> e-Mail:deano@alliancepartitions.com <br /> Called contractor and they cancelled.Not ready. <br /> I <br /> Printed:Thursday,05 December,2024 3 of 6 rk <br /> SUPERION <br />