Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 12/18/2023 12/18/2023 BLDG 08-FRAMING RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> APPROVAL <br /> Notes: <br /> 12/15/2023 1:09 PM Deano Ramirez <br /> P-1 parking garage in the canyon <br /> Contact Name:Deano Ramirez <br /> Site Address:2929 PINE ST <br /> Phone:3609264979 <br /> e-Mail:deano@alliancepartitions.com <br /> P-1 parking garage in the canyon.Grid C to EX-E and between Grid 11 and 14. <br /> 3/12/2024 3/12/2024 BLDG 16-FINAL RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 2/29/2024 9:15 AM Chris Peterson <br /> Garage Final for TCO <br /> Contact Name:Chris Peterson <br /> Site Address:2929 PINE ST <br /> Phone:4253506404 <br /> e-Mail:chris.peterson@mortenson.com <br /> Need all permit approvals including public works.Need fire approval on building and on site.Missing guardrails in areas as discussed.Guardrails <br /> required along open sided walking surface where adjacent grade is 30"or more.Note loading side of loading dock is an exception(IBC 1015.2).Missing <br /> exterior landings at exits. <br /> Parking garage must satisfy electric vehicle charging infrastructure per 2015 IBC code section 427.See parking counts on Sheet G006. <br /> Need landscaping inspection approval. <br /> 4/5/2024 4/5/2024 BLDG 16-FINAL RAKEEB KHAN CORRECTION <br /> REQUIRED <br /> Notes: <br /> Need public works final approval and planning landscape inspection. <br /> 4/5/2024 4/5/2024 70, <br /> P CERTIFICATE RAKEEB KHAN APPROVAL 120 day TCO as noted <br /> F OCCUPANCY <br /> Notes: <br /> 120 day TCO as noted. <br /> ***NOT FOR PUBLIC USEH NO PATIENTS ALLOWED!!*** <br /> OK for staff and vendors to use building. See final correction results for final CO requirements. <br /> 4/19/2024 4/19/2024 BLDG 01- RAKEEB KHAN OTHER eTRAKiT Inspection Request <br /> CONSULTATION <br /> Notes: <br /> 4/18/2024 1:07 PM Dean Vadset <br /> Contact Name:Dean Vadset <br /> Site Address:2929 pine st <br /> Phone:4255123907 <br /> e-Mail:dean.vadset@mortenson.com <br /> rfk changed Inspection Type from BLDG 16-FINAL to BLDG 01-CONSULTATION <br /> Discussed requirements for final with Dean who is taking over the project.Need public works final approval and landscaping. <br /> I <br /> Printed:Thursday,05 December,2024 5 of 6 rk <br /> SUPERION <br />