Laserfiche WebLink
Page 16 <br /> MODELING <br /> Modeling—Combined model includes tube column supporting backflow prevention valve. <br /> 0 <br /> FA <br /> l - � <br /> I <br /> I <br /> F—B ] <br /> Figure 1—Exhaust Equipment Elevation (front view) <br /> [NOTE: Donaldson-Torit supplies their own unit baseplate and anchor loads analysis] <br /> 2'-9 3/8" 5'-6 3/8" <br /> 4'-61/4" 4'-61/4" <br /> -6'k30"VOTRANSITION[8 PLs] <br /> BY HVAC SUB- (DUCTOUTLEr[SIN METRIC) <br /> CONTRACTOR I <br /> i <br /> a• I 110":a"119 11":a":12• 114"s•16" i <br /> 1U I I M <br /> 5-6" I i �,-7" ,6• i <br /> t i 16" i <br /> PA �._—_ <br /> 16" <br /> C V 6" <br /> 8'- <br /> sp <br /> 11'-71/2" 4'-7112" N <br /> Figure 2—Exhaust Equipment General Arrangement <br /> Evaluation Report Donaldson-Torit Dust Collection System for Boeing Everett 40-53 DAPP Project <br />