Laserfiche WebLink
Page 114 <br /> Ft=-2.54 kips, Fv= 1.75 kips with Q=2.0. The Dust Collectors are both oriented so that the <br /> baseplate edges are equal or farther than 6" from construction joints, so edge distance= 7.5". <br /> The Dust Collector baseplate spacing= 8.0". Select 3/4"D x 3-3/4" embedment. The spacing <br /> factor is 0.86 for tension and edge distance factor is 0.84. The spacing factor for shear is 0.63, <br /> edge distance for shear is 0.61 and the (8") concrete shear factor is 0.72. <br /> Fta=6,980 lbs *0.86 * 0.84= 5.04 kips and Fva= 15,035 lbs * 0.63 * 0.61 * 0.72 =4.16 kips <br /> F.S. = [(2.54/5.04)^2+ (1.75/4.16)n2]^0.5 =0.65 < 1.00 PASS <br /> ► USE 3/4"D Hilti KB-TZ2 x 6-1/2"to allow for 1" leveling grout, ±1/2" slab cross-slope. <br /> Evaluation Report Donaldson-Torit Dust Collection System for Boeing Everett 40-53 DAPP Project <br />