Laserfiche WebLink
Page 13 <br /> 0 <br /> 4� <br /> SCOPE and GIVEN <br /> This equipment evaluation report develops the ASCE 7-16 Code, End-User Foundation Design <br /> Criteria with stipulated forces impacting a proposed Henderson Enterprises Dust Collection <br /> System at Boeing Everett Facility, Building 40-53; and establishes these forces as individual <br /> loading cases for facilitating anchor installation upon an existing reinforced level concrete slab. <br /> Situs Delivery: Boeing Everett Facility <br /> 3003 Casino Rd, Everett, WA 98204 <br /> Plant GPS: LAT 47.926979'LON-122.278078°, Elev. 550-ft NAVD 88 <br /> Reference Drawings: 40-53-1B18 Background and 40-53 DAPP Routers Permit Set [Boeing] <br /> VF_16in400mm BoP_V0006 [Henderson Enterprises] and <br /> Boeing Evt DAPP Approval IG17991426L001_A_SECT - Sheetl <br /> Environmental Loads: <br /> Seismic loads only, per ASCE7-16 and taken from ASCE Hazard Tools report: <br /> Seismic Details <br /> Risk Category II <br /> Ss 1.389 S, 0.494 F, 1.2 F N/A <br /> SMs 1.667 SM, N/A Sos 1.111 Sol N/A <br /> TL 6 PGA 0.6 PGAM 0.72 FPGA 1.2 <br /> le 1 C 1.378 <br /> Note Design and MCER spectrum data not available for this location. <br /> Note Ground motion hazard analysis may be required.See ASCE7SEI 7-16 Section 11.4.8. <br /> Evaluation Report Donaldson-Torit Dust Collection System for Boeing Everett 40-53 DAPP Project <br />