Laserfiche WebLink
8/18/23, 10:54AM waenergycodes.com/print_project_summary_form.php?k=Y29tYm9fdGZ2X3BOPW11Y19odmFjX3N5c196b25pbmdfc2luZ2xlJTdDcGRfYWxOZXJhdGlvbiZOZnY9bWVjX2h2YWNfc31... <br /> MECHANICAL COMPLIANCE SUMMARYOhio" <br /> 2018 WSEC Compliance Forms for Commercial Buildings including Group R2,R3&R4 over 3 stories and all RI Administered by:©2023 NEEA,All rights reserved <br /> Project Title P5775 NW Plus CU-RTU Replacement-2018 WSEC For Building Department Use: I Date: Aug 18,2023 <br /> 2821 Hewitt Ave <br /> Project Address NW Plus CU <br /> Project&Applicant Everett,WA 98201 <br /> Information Applicant Name Chris Stone <br /> Applicant Phone 206-573-6130 <br /> Applicant Email chris.stone@psrmechanical.com <br /> For questions about this report,contact WSEC Commercial Technical Support at 360-539-5300 or via email at com.techsupport@waenergycodes.com <br /> General Occupancy All Commercial General Building Use Type Office,Bank/Financial Building Cond.Floor Area 8,200 <br /> New Building Project Cond.Floor Area 8,200 <br /> General Project Types Alteration or Addition Alteration MechanicalScoe Single Zone Systems&Equipment Floors Above Grade 2 <br /> p <br /> Mechanical Scope Compliance Method Compliance Method 1-General <br /> Mechanical Project Description <br /> Equipment Efficiency <br /> Project Economizer DOAS Ventilation Higher Equipment <br /> Mechanical Scope Exception(s) Compliance <br /> Mechanical Compliance Type Mechanical <br /> Provided? Efficiency Option Applied? Verification <br /> Scope and Method <br /> Alteration Single Zone Systems&Equipment Yes No NA COMPLIES <br /> Additional Efficiency <br /> Credits Included(AEC) Higher equipment efficiency and fan FEG <br /> Does building include occupancy classifications requiring No Does project include DOAS equipment? No <br /> DOAS? p <br /> Based on project scope do TSPR requirements apply? Yes Do all systems comply with Appendix D standard reference design or qualify for an exception to Yes <br /> TSPR. <br /> Scope&Space Conditioning ALTERATION-SINGLE ZONE SYSTEMS&EQUIPMENT ir Compliance Verification COMPLIES <br /> Single Zone Air Systems Category-Heat pump,packaged(PTHP,SPVHP,room) <br /> Air Systems Summary Information <br /> Quantity Supply Airflow Ventilation CFM Ventilation Energy Recovery <br /> System/Equip ID of Items Control Ventilation Standard (Total if Multiple Items) Air Source Paired with DOAS Ventilation energy recovery Efficiency(%) <br /> RTU-1,RTU-2,RTU-3 3 Variable air volume ASHRAE Standard 62.1 Integral <br /> RTU-4,RTU-5,RTU-6 3 Variable air volume ASHRAE Standard 62.1 1,200 Integral <br /> Air Systems&Equipment-Cooling <br /> Cooling System/ Capacity CE PL AEC Econo Exception Combined Efficiency Proposed Proposed Part Efficiency <br /> Equip ID Cooling System/Equip Type Specific Type per item Efficiency Multiplier(FL& Multiplier(AEC& Cooling Units Load Units Compliance <br /> (Btu/h) Multiplier PL) Econo) Efficiency Efficiency Verification <br /> RTU-4,RTU-5, Room air conditioner,heat Without louvered sides 36,980 1 0 1 14.3 CEER COMPLIES <br /> RTU-6 pump <br /> RTU-1,RTU-2,RTU Heat pump,terminal(PTHP) Packaged terminal HPri-3 replacement 61,350 1 0 1 EER COMPLIES <br /> Air Systems&Equipment Details <br /> System/Equip ID Area(s)Served Location In Project Documents-Plan/Detail# <br /> RTU-1,RTU-2,RTU floor M2.0 <br /> https://waenergycodes.com/print_project_Summary_form.php?k=Y29tYm9fd GZ2X3 BO P W 1 IY 1 9odmFjX3N5c1 96b25pbmdfc2luZ2xlJTdDcGRfYWxOZXJhdGlvbiZOZnY9bWVjX2h2YWNfc3lzX3pvbmluZ1... 1/2 <br />