Laserfiche WebLink
CITY OF EVERETT <br /> EVERETT Public Works Department <br /> WASHINGTON <br /> Date: 12/18/2023 <br /> Owner: Stadium Properties, LLC <br /> Job Address: 3625 Broadway, Everett WA 98201 <br /> Plan Check No: M2311-065 <br /> Dear New Castle Mechanical LLC, <br /> Your application has been received and a permit set up. However, the submitted documents are not <br /> sufficiently developed for us to perform a comprehensive review at this time. <br /> Two complete sets of the revised drawings should be submitted to replace the previously submitted <br /> drawing sets. Preliminary comments are provided below to assist in preparing the drawings, but these <br /> are not intended to provide a comprehensive review. The resubmittal documents should include an <br /> itemized response letter clarifying how the review comments below have been addressed. <br /> General Review Comments: <br /> 1. Where the existing unit has been installed with a valid permit,the drawings should include the <br /> weights of the existing and new units, and demonstrate that the new unit does not increase the <br /> previously permitted lading condition on the roof by more than 5%. The weight of all accessory <br /> components (e.g., mounting curbs, operating weight with fluid, etc.) should be included. If the <br /> load increase exceeds 5%, a structural analysis of the supporting framing is required. See 2018 <br /> IEBC Section 706.2. <br /> 2. If installation of new units requires substantial structural modifications to the supporting <br /> framing, a building permit will be required. The application should include drawings and <br /> calculations for the proposed modifications. Minor modifications (e.g., blocking between <br /> existing framing, curbs, sheathing penetrations that do not cut framing members) may be <br /> performed within the scope of the mechanical permit application. <br /> 3. It appears that the new units are suspended from the existing structure, details and calculations <br /> for the gravity supports and lateral bracing of the unit is required if it exceeds 20 lbs. See IBC <br /> Section 1613.1 and ASCE 7-16 Chapter 13. <br /> 4. Details will be required when penetrating fire-rated assemblies;the applicant is responsible to <br /> evaluate the building and determine the Construction Type of the building per IBC Section 601, <br /> and the locations and ratings of assemblies. Penetration details should be provided for the <br /> rated assemblies per IBC Chapter 7. <br /> 3200 Cedar Street © 425.257.8810 O PermitServices@everettwa.gov <br /> Everett,WA 98201 everettwa.gov/permits <br />