Laserfiche WebLink
R-702 Restaurant Fire Suppression Manual SECTION 4-SYSTEM DESIGN SECTION 4-SYSTEM DESIGN R-102 Restaurant Fire Suppression Manual <br /> UL EX3470 ULC EX3470 UL EX3470 ULC EX3470 <br /> 2014-SEP-01 REV.11 PAGE 4-63 PAGE 4-64 REV.11 2014SEP-01 <br /> ACTUATION AND EXPELLENT GAS LINE REQUIREMENTS 3. If two tanks are connected to the regulated release DISTRIBUTION PIPING REQUIREMENTS(Continued) <br /> (Continued► assembly,in a multlple-tank system arrangement,the total <br /> Expellant Gas L'me combined length of the actuation and expellant gas lines Supply and Branch Llne identification SUPPLY LINE <br /> must not exceed 30 R(9.1 m)when using a'double-lank" The R-102 disidbullon piping network Is broken down into The Supply line is defined as the length of pipe which runs from <br /> i. The expelanl gas line is installed from the regulated release nitrogen cartridge,an LT-A-101-30 nitrogen cartridge,or a four specific pipe runs:the Supply Line.the Duct Branch Line, the agent lank outlet to the last branch line(whether a duct, <br /> mechanism In double, three, and multlple-lank systems, 101-30 carbon dioxide cartridge.See Figure 4-122. the Plenum Branch Ling,and the Appliance Branch line.See appliance,or plenum branch line).This Includes all supply line <br /> and from the regulated actuator assembly in multiple-lank 4. If three 3.0 gallon tanks are connected to the regulator In Figure 4-127. -- - � - fittings except for the leas or elbows leading to the branch lines. <br /> systems.The expellant gas kne is the piping andior hose either a re ulated release or regulated actuator assembly, See Figures 4.127 and 4-128. <br /> g g y' WCT BRANCH <br /> between the regulator and the lank-endosureAank-lxackel only factory suppked expellant gas hose assemblies will LINE <br /> assembly.The totsl length at the expellant gas line from be utilized.Refer to Distribution Piping Requirements-9.0 <br /> the regulated release mechanism or each regulated actu- I. Gallon System,page 4-70 for additional design requirements. <br /> star assembly must not exceed 30 it(9.1 m)when using <br /> a'double-tank'cartridge,an t-T-A-101-30 Cartridge,or a DISTRIBUTION PIPING REQUIREMENTS <br /> 101-30 Cartridge.See Figures 4-124 and 4-125. Once the nozzle placement and quantity of tanks has been SUPPLY <br /> determined,it Is then necessary to determine the piping mnrig- LINE - <br /> E%PELLANT GAS LINE <br /> MAXIMUM LENGrIl-30FF(al 11. uragons between the tank adaptor and each discharge nozzle, i <br /> 3 MAXIMwe No.of Fmmvs-s This section contains the guidelines and firnitations nor designing <br /> I Ilse distribution piping so that the liquid agent will discharge from - <br /> I the nozzles at a proper flow rate.These limitations should also <br /> be referred to when selecting the mounting location for the regu- PLeuuM errunNCE <br /> fated release mechanism and agent tank. PHANCH LINE BRANCH LINE <br /> General Piping Requirements <br /> 1.Alt R-102 system piping Is straight line.Therefore,the need NOTE:THIS Is A CONCEPTUAL DRAWING My. <br /> for critical lengths and balancing is minimized. THIS Is NOT AN ACTUAL INSTALLATION, FIGURE 4-127 <br /> END or <br /> 2.Two 45'elbows count as one 90'elbow. °°'"° SNFFIN LINE <br /> HtG'.L—D 3.Each branch line includes the tee or elbow leading to It,and NNTE�THESE ARE EXAMPLES ONLY OTHEn cCNJFIGURATIOMa CAN PE DESIGNED <br /> ItLtASt A��;; Y <br />� all fillings w{lhtn the branch line Itself. 'p ¢ <br /> t <br /> 4.The minimum piping length of Schedule 40,3l3 in.pipe from p�'f <br /> the tank outlet to any nozzle protecting a range,fryer,or wok <br /> FIGURE 4-1124 must be 6 If(1.9 rn. <br /> rx^c I nrr rns I Inn 5. Pipe lengths are measured from center of fitting to center of <br /> anxrurn:N;n�_,in rT M I gyp; fitting.See Figure 4-126. <br /> !41XA\'tr'.i Y.D CK FI`rYJ65.-0 END OF <br /> SUPPLY LINE ENO OF <br /> \y Cf31Tpt TOCENfEa SUPPLY LINE <br /> � OF SUPPLY <br /> UPr4.V LINE ¢ <br /> I ¢ ? p <br /> p ¢ �.• I i' <br /> FIGURE4-126 ,1 SUPPLY iPNLENUESFOR <br /> — LINE TEE PROTECTION) <br /> 6.All distribution piping must be 3/8In,Schedule 40 black iron, <br /> chrome-plated,or stainless steel.Do not use hot dipped <br /> galvanized pipe on the distribution piping. <br /> 7. All threaded connections located in and above the protected -� <br /> area must be sealed with pipe tape.Tape should be applied <br /> to male threads only.Make certain tape does not extend over ESkiND OFYLiNE <br /> REarA.gTEB ACTwTaI the end of the thread.as this could cruse possible blockage P� ¢ <br /> ASSENSLY of the agent distribution. <br /> FIGURE 4.126 8. Before installing blow-off caps on nozzles,apply a small 1 f <br /> I amount of Dow Coming No.111 silicone grease across the / (NOZzUESFOR <br /> 2.A Combined total of nine fillings may be used fin these lines. opening in the nozzle tip and also a small amount mating the SUPPLY PLENUM <br /> eight 90°elbows and one tee.Two 45"elbows equal one exterior or the blow-off cap,This will help keep cooking grease LFEc PRmEcrIONI <br /> BRANCH LINE CANNOT BRANCH LINE CANNOT <br /> 90"elbow. from building up on the cap. STAST AHEAD CA <br /> SUPPLY LINE TEE STAm AHEAD OF <br /> 9.Tees used in the distribution piping can be used as thm lees., SUPPLYUNETEE <br /> side outlet lees,or bull lees. FIGURE 4A28 <br /> i <br /> t <br />