Laserfiche WebLink
PUBLIC WORKS PERMIT Date Applied: 9/27/2022 <br /> City of Everett Permit Services <br /> Public Works Permit#: PW2209-016 <br /> 3200 Cedar Street, 2"d Floor Associated Bldg Permit#: <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON everettwa.gov/permits Public Works Fee: $3,581.27 <br /> Perm itSeryices@ eve rettwa.goy Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EVERETT PORT OF BRANDON WHITAKER <br /> PO BOX 538 <br /> EVERETT,WA 98206 <br /> PHONE: PHONE:4255086627 <br /> SITE ADDRESS:40414TH ST TAX PARCEL ID#:29051800303300 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION:CLEARING AND GRADING FOR PORT FUEL TANK PROJECT <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and Specifications for <br /> Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at all times. <br /> 5. Inspections are required for all stages of construction.Visit the City's Online Permitting Portal at pw.everettwa.gov to formally request all required <br /> inspections.A handout is provided at permit issuance with instructions on how to request an inspection online. <br /> 6. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved SWPPP/TESC <br /> Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 7. Keep City streets clean at all times.No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 8. Protect all existing underground utilities during construction. <br /> 9. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW Inspector. <br /> 10. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on-site in a <br /> manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the improvements located therein. <br /> 11. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained from the City's <br /> Traffic Engineering Division.This permit can be applied for online at pw.everettwa.gov and requires a traffic control plan to be submitted for the area of <br /> requested closure.Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 12.This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy.Request a final inspection online by selecting PW 25- <br /> Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been completed. <br /> 13.A sewer discharge authorization permit approval is required before any discharge to the sewer system.Please contact Fred Rapelyea at 425-257- <br /> 8828 or FRapelyea@everettwa.gov for additional information. <br /> Public Works Permit Fee Breakdown: <br /> Erosion Control .............................................$200.00 <br /> Grade/Fill/Excavate(4,500CY)......................$290.00 <br /> Paving(11,185SF)............................................$55.93 <br /> PW Plan Review..............................................$20.00 <br /> PW Site Inspection..........................................$20.00 <br /> Stormwater System Development Fee......$2,995.34 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all <br /> claims for damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other right- <br /> of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion.This <br /> permit may be canceled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration date <br /> 180 days to keep the permit open while work is active. <br /> Page 1 of 1 <br /> APPLICANT/JOB SITE COPY ADDRESS FILE TREASURER <br />