My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
404 14TH ST BASE FILE 2024-12-09
>
Address Records
>
14TH ST
>
404
>
BASE FILE
>
404 14TH ST BASE FILE 2024-12-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2024 2:18:41 PM
Creation date
12/9/2024 11:26:43 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
404
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9. The wastewater must be sampled at least once for the following constituents prior to discharge and <br />subject to the associated limits listed below. Samples must be submitted prior to discharge, <br />to verify discharge limits. Should lab samples indicate higher than allowed discharge limits, a plan of how to <br />bring the discharge within the required limits will be required before issuance of the permit. <br />Analyte <br />Limit <br />As <br />0.5 mg/L <br />Cd <br />0.24 mg/L <br />Cr <br />5.0 mg/L <br />Cu <br />3.0 mg/L <br />Pb <br />1.9 mg/L <br />Hg <br />0.1 mg/L <br />Ni <br />2.83 mg/L <br />Ag <br />0.49 mg/L <br />Zn <br />4.0 mg/L <br />CN- <br />0.65 mg/L <br />Nonpolar FOG <br />200 mg/L <br />C. Additional Pertinent Information: (Attach additional information if necessary) <br />D. Discharge Authorization Conditions <br />1. You must comply with the general use and discharge requirements of the Industrial Pretreatment Ordinance <br />#3070-08 as amended (attached), as well as any applicable Federal and State regulations. <br />2. The City solely reserves the right to modify, suspend, or terminate the authorization at any time, once issued. <br />3. The City may modify the discharge location at any time to an alternate location that best suits the City. <br />Discharge operations shall comply with the City's Noise Ordinance. <br />4. Discharges during rainfall may be prohibited. <br />E. Discharge Authorization Permit Fee <br />1. The total fee for the Discharge Authorization Permit is $500. Payment must be received with application. Make <br />payments only by mail. Make check payable to "City of Everett Utilities". <br />F. Sewer Discharge Rates <br />1. Sewer collection and Industrial Pretreatment fees will be billed monthly, and will include the then current sewer <br />rate (2020 rate of $8.569 per 100 cubic feet) AND the industrial surcharge of $0.19 per thousand gallons of flow. <br />G. Certification of Information <br />I hereby certify that the information supplied in this request is correct and complete to the best of my knowledge. <br />Name (Print): <br />Signature <br />Email: <br />Title: <br />Date: <br />Phone: <br />Send or email completed request to address at the top of this form. For further questions regarding this request, <br />contact Fred Rapelyea at 425-257-8828 (or FRapelyea@)everettwa.govl. Fax: 425-257-8882. <br />Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.