My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
404 14TH ST BASE FILE 2024-12-09
>
Address Records
>
14TH ST
>
404
>
BASE FILE
>
404 14TH ST BASE FILE 2024-12-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2024 2:18:41 PM
Creation date
12/9/2024 11:26:43 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
404
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PUBLIC WORKS PERMIT Date Applied: 6/10/2022 <br /> City of Everett Permit Services Public Works Permit#: PW2206-007 <br /> 3200 Cedar Street, 211 Floor Associated Bldg Permit#: <br /> EVERETT <br /> Everett, WA 98201 Planning Reference#: <br /> WASHINGTON everettwa.gov/permits Public Works Fee: $2,143.04 <br /> Perm itSeryices@ eve rettwa.goy Schedule Inspections at:onlinepermits.everettwa.gov <br /> OWNER NAME AND ADDRESS: APPLICANT NAME AND ADDRESS: <br /> EVERETT PORT OF BRANDON WHITAKER <br /> PO BOX 538 <br /> EVERETT,WA 98206 <br /> PHONE: PHONE:4255086627 <br /> SITE ADDRESS:404 14TH ST TAX PARCEL ID#:29051800303300 <br /> THIS PERMIT TO BE POSTED ON JOB SITE AT ALL TIMES <br /> DESCRIPTION: RELOCATE(2) NEW FUEL TANKS TO WATERFRONT PLACE <br /> PERMIT CONDITIONS: <br /> 1. All inspections shall be scheduled online at https://onlinepermits.everettwa.gov.Available inspection dates are shown in the dropdown <br /> menu. <br /> 2. All work shall be performed in accordance with the permit and current City of Everett'Design and Construction Standards and <br /> Specifications for Development'. <br /> 3. Call Location Underground Service 48 hours before you dig.The day you call does not count.TOLL FREE NUMBER 811. <br /> 4. Site Civil Work to be done per plans approved by the City of Everett Public Works Department.Approved plans must remain on job-site at <br /> all times. <br /> 5. Install and maintain erosion control measures per City of Everett Standards and per the direction of the PW Inspector and the approved <br /> SWPPP/TESC Plan. Remove upon completion of the project prior to final approval of the permit. <br /> 6. Keep City streets clean at all times. No dirt,mud,rocks,or debris to be tracked onto roadway. <br /> 7. Protect all existing underground utilities during construction. <br /> 8. Any damage to City improvements(sidewalk,curb,roadway,etc.)shall be replaced per City Standards and/or as directed by the City PW <br /> Inspector. <br /> 9. It is the applicant/owner's responsibility to ensure that stormwater runoff from new/replaced impervious surfaces will be managed on-site <br /> in a manner that does not adversely affect neighboring properties,including the City's right-of-way and/or easements and the <br /> improvements located therein. <br /> 10. Prior to any interruption to the public right-of-way(roadways,parking lanes,or sidewalks)a Traffic Street Use permit shall be obtained <br /> from the City's Traffic Engineering Division.This permit can be applied for online at onlinepermits.everettwa.gov and requires a traffic <br /> control plan to be submitted for the area of requested closure. Please allow 1-2 weeks for TSU permit issuance from the date of application. <br /> 11. This permit must be finaled in order to close out this permit/grant a Certificate of Occupancy. Request a final inspection online by selecting <br /> PW 25-Site Final/Permit Close Out within the Online Permitting Portal Inspection Requests for this permit when all items have been <br /> completed. <br /> 12. All work constructed within the public right-of-way must be removed or relocated at the owner's expense if the City ever requires use of <br /> the right-of-way for municipal purposes. <br /> PUBLIC WORKS PERMIT FEE BREAKDOWN: <br /> Paving(7,685SF) ..............................................$45.00 <br /> PW Plan Review...............................................$20.00 <br /> PW Site Inspection...........................................$20.00 <br /> Stormwater System Development Fee.......$2,058.04 <br /> ACKNOWLEDGEMENT OF CONDITIONS <br /> By purchasing this permit and commencing work,the owner/applicant hereby agrees to hold and save harmless the City of Everett from any and all <br /> claims for damages,costs,expenses,or causes of action that may arise because of installation and maintenance of the improvement or other right- <br /> of-way use here to applied for and further agrees to remove same upon notice from the City and to replace public property damaged thereby. <br /> VALIDITY/EXPIRATION: <br /> Work authorized by this permit must be started within 180 days of date permit is issued and thereafter is to be diligently pursued to completion.This <br /> permit may be canceled by the city upon any stoppage of work on this project over 180-day duration.Each inspection extends the expiration date <br /> 180 days to keep the permit open while work is active. <br /> Page 1 of 1 <br /> _APPLICANT/JOB SITE COPY _ADDRESS FILE _TREASURER <br />
The URL can be used to link to this page
Your browser does not support the video tag.