My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
404 14TH ST BASE FILE 2024-12-09
>
Address Records
>
14TH ST
>
404
>
BASE FILE
>
404 14TH ST BASE FILE 2024-12-09
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/9/2024 2:18:41 PM
Creation date
12/9/2024 11:26:43 AM
Metadata
Fields
Template:
Address Document
Street Name
14TH ST
Street Number
404
Tenant Name
BASE FILE
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
726
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I. The City may require reporting by users that are not required to have an industrial <br /> wastewater discharge permit if information or data is needed to establish a sewer <br /> charge, determine the treatability of the effluent or determine any other factor that <br /> is related to the operation and maintenance of the sewer system. <br /> J. The City may require self-monitoring by the user or, if requested by the user, may <br /> agree to perform the periodic compliance monitoring needed to prepare the <br /> periodic compliance report required under this section. If the City agrees to <br /> perform such periodic compliance monitoring, it may charge the user for such <br /> monitoring, based upon the costs incurred by the City for the sampling and <br /> analyses. Any such charges shall be added to the normal sewer charge and shall <br /> be payable as part of the utility bills. The City is under no obligation to perform <br /> periodic compliance monitoring for a user. <br /> 4.4 Compliance schedules for meeting applicable pretreatment <br /> standards <br /> A. The schedule shall contain increments of progress in the form of dates for the <br /> commencement and completion of major events leading to the construction and <br /> operation of additional pretreatment required for the user to meet the applicable <br /> pretreatment standards (e.g., hiring an engineer, completing preliminary plans, <br /> completing final plans, executing contract for major components, commencing <br /> construction, completing construction, etc.). <br /> B. No increment referred to in paragraph (A) of this section shall exceed 9 months. <br /> C. Not later than 14 days following each date in the schedule and the final date for <br /> compliance, the user shall submit a progress report to the City including, at a <br /> minimum, whether or not it complied with the increment of progress to be met on <br /> such date and, if not, the date on which it expects to comply with this increment <br /> of progress, the reason for delay, and the steps being taken by the user to return <br /> the construction to the schedule established. In no event shall more than 9 <br /> months elapse between such progress reports. <br /> 4.5 Notification of Significant Production Changes <br /> Any user operating under a wastewater discharge permit incorporating mass or <br /> concentration limits based on production levels shall notify the City within two (2) <br /> business days after the user has a reasonable basis to know that the production level will <br /> significantly change within the next calendar month. Any user not providing a notice of <br /> such anticipated change will be required to comply with the existing limits contained in <br /> its wastewater discharge permit. <br /> 38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.