Laserfiche WebLink
z� o <br /> P PSO PSO PSO PSO PS PSO PSO PSO CONTRACTOR SHALL BAKER TANKS 1 PSO PSO PSO PSO PSO PSO PSO- <br /> �E J IN THIS LOCATION FOR DISCHARGE TO SANITARY SEWER. <br /> a d Q50 N PSS PSS PSS PSS PS' <br /> p PSS PSS PSS PSS PSS PSS P S PSS PSS SS :n <br /> EXISTING 150 INTERCEPTOR DIKE AND <br /> a SEWER- SWALE PER DOE BMP C200 I <br /> SO PSO P PSO PSO PS PSO BYPASS - -- - LOCATE CHECK DAMS PER DOE EXISTING 12"0 ' V <br /> __ -- - - - - BMPC207 L <br /> a SEWER, SEE - - - N HDPE WATER TEMPORARY SILT FENCE PER EXISTING 12"0 I <br /> o C1.02 o0E STANDARD PLAN 214. HDPE WATER <br /> �w w� w w w - w wo- VV w w w w w- <br /> 7, EXISTING 6"0 EXISTING 6"0 <br /> + 8 HOPE WATER HDPE WATER <br /> w w w SEWER VAULT � W w w w w w w w w w <br /> E INLET SEDIMENT TRAP <br /> RIM 14.94 3 <br /> Ss SS S SS SS S BYPASS EXISTING SDMH R <br /> a I P 3 STORM .05 <br /> , RIM IE (N)49.6 <br /> EXISTING FUEL MH IE (E) 9.6 EXISTING SDMH <br /> RIM 14.01 <br /> RIM 15.611 IE (S) 12.3 IE (W) 9.8 <br /> IE 10.59 <br /> NH CO CID so <br /> P'IL <br /> ¢ P P P P P <br /> s So ` <br /> P P EXISTING EXISTING STORM <br /> SDCBP P EXISTING 8"0 �% VAULT <br /> a RIM 14.98 q HDPE ^ �� P P� p RIM 14.1�8 P/ <br /> o IE (N, E) 11.6' INLET SEDIMENT TRAP EXISTING <br /> IE (W) 11.5' <br /> HDPE <br /> IE (S)11.8' <br /> c� +18 N <br /> o EXISTING SDMH v A <br /> o INLET SEDIMENT TRAP -0 -0 -0 <br /> RIM 15.82 <br /> r ' o <br /> IE (N) 10.8' a <br /> o IE (S) 10.6' o EXISTING 24"0 <br /> CMP STORM OUTFALL a A <br /> P P ,^P p P fi P P P P �-P P -�P P P P P P CAI <br /> Z P P P <br /> rn d P N Pp d P d <br /> w Q a X 7, 43 <br /> PP P E TR 2-TJ p I� T E P P�/ r w P I PI P J P P PP PP P^ <br /> TESC NOTES: <br /> PLAN 1. APPROVAL OF THIS EROSION/SEDIMENTATION CONTROL (ESC) PLAN DOES NOT CONSTITUTE AN APPROVAL OF PERMANENT ROAD OR DRAINAGE DESIGN (E.G. SIZE AND <br /> SCALE N FEETLOCATION OF ROADS, PIPES, RESTRICTORS, CHANNELS, RETENTION FACILITIES, UTILITIES) <br /> 2. THE IMPLEMENTATION OF THESE ESC PLANS AND THE CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF THESE ESC FACILITIES IS THE RESPONSIBILITY <br /> o 0 10 20 OF THE APPLICANT/CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED AND APPROVED AND VEGETATION/LANDSCAPING IS ESTABLISHED. <br /> z 3. THE BOUNDARIES OF THE CLEARING LIMITS SHOWN ON THIS PLAN SHALL BE CLEARLY FLAGGED IN THE FIELD PRIOR TO CONSTRUCTION. DURING CONSTRUCTION PERIOD, <br /> a NO DISTURBANCE BEYOND THE FLAGGED CLEARING LIMITS SHALL BE PERMITTED. THE FLAGGING SHALL BE MAINTAINED BY THE APPLICANT/CONTRACTOR FOR THE <br /> o DURATION OF CONSTRUCTION. <br /> 4. THE ESC FACILITIES SHOWN ON THIS PLAN MUST BE CONSTRUCTED IN CONJUNCTION WITH ALL CLEARING AND GRADING ACTIVITIES, AND IN SUCH A MANNER AS TO <br /> W ENSURE THAT SEDIMENT AND SEDIMENT LADEN WATER DO NOT ENTER THE DRAINAGE SYSTEM, ROADWAYS, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS. <br /> Z 5. THE ESC FACILITIES SHOWN ON THE PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE ESC <br /> Z FACILITIES SHALL BE UPGRADED AS NEEDED FOR UNEXPECTED STORM EVENTS AND TO ENSURE THAT SEDIMENT AND SEDIMENT-LADEN WATER DO NOT LEAVE THE SITE. <br /> w 6. THE ESC FACILITIES SHALL BE INSPECTED ROUTINELY AND MAINTAINED BY THE APPLICANT/CONTRACTOR TO ENSURE THEIR CONTINUED FUNCTIONING, ESPECIALLY AFTER <br /> STORM EVENTS. <br /> 0 7. THE ESC FACILITIES ON INACTIVE SITES SHALL BE INSPECTED AND MAINTAINED A MINIMUM OF ONCE A MONTH OR WITHIN THE 48 HOURS FOLLOWING A MAJOR STORM <br /> EVENT. <br /> AT ALL CATCH <br /> Discharge Authorization Permit approval required 8. SHALL BE CLEANED PR OR TIME SHALL MORETHAN TO PAVINGFONEO THE�LEANING OPERATION SHALL SEDIMENT BE ALLOWEDO NOT F USHTSEDIIMENTLADENPWATER INTO CATCHPED BTHENDOWNSTREAM SYSIMAND CONVEYANCE LINES <br /> Y before discharge to sewer. 9. STABILIZED CONSTRUCTION ENTRANCES SHALL BE INSTALLED AT THE BEGINNING OF CONSTRUCTION AND MAINTAINED FOR THE DURATION OF THE PROJECT. ADDITIONAL <br /> Z MEASURES MAY BE REQUIRED TO ENSURE THAT ALL PAVED AREAS ARE KEPT CLEAN FOR THE DURATION OF THE PROJECT. <br /> ~ 10. THE CONTRACTOR SHALL PROVIDE PERIODIC STREET CLEANING TO REMOVE DEBRIS AND SEDIMENT TRACKED OFF THE SITE. <br /> Contact Fred Ra el ea at FRa el ea everettwa. ov 11. APPROXIMATE MEASURE SHALL BE TAKEN TO STOP SEDIMENT FROM ENTERING SURFACE WATER BODIES IF THE PROPOSED BMP'S FAIL. <br /> p Y p Y g 12. BARE AND/OR DISTURBED SOILS SHALL REMAIN UNCOVERED AND/OR UNSTABILIZED FOR NO MORE THAN 2 DAYS FROM OCTOBER 1 THROUGH APRIL 30, AND FOR NO <br /> or 425-257-8828 for additional information. 1 13. NOTIFY THE CITY PUBLIC WORKS INSPECTOR AT LEAST 24 HOURS PRIOR TO DEWATERING ACTIVITIES. HANDLE HIGHLY TURBID OR OTHERWISE CONTAMINATED DEWATERING <br /> N WATER SEPARATELY FROM STORMWATER. <br /> 14. THE APPROVED PROJECT PUBLIC WORKS PERMIT AND SWPPP SHALL BE RETAINED ON SITE OR READILY AVAILABLE TO THE CONTRACTOR THROUGHOUT THE DURATION OF <br /> THE CONSTRUCTION PROJECT. <br /> 0 15. DESIGN, INSTALL, IMPLEMENT, AND MAINTAIN EFFECTIVE POLLUTION PREVENTION MEASURES TO MINIMIZE THE DISCHARGE OF POLLUTANTS. <br /> City of Everett 16. PROTECT ALL LID BMPs FROM SEDIMENTATION THROUGH INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENT CONTROL BMPs ON PORTIONS OF THE SITE THAT <br /> DRAIN INTO THE LID BMPs. <br /> EVERETT Reviewed for Permit 09/27/2022 <br /> N IF THIS DRAWING IS NOT 22"x34" SCALE ACCORDINGLY. <br /> PROJECT ENGINEER: SCALE PORT OF EVERETT DWG. N0. <br /> z O END ENGINEERS, INC. IS NOT RESPONSIBLE FOR SAFETY BRUCF J, KIESER D 1.04 <br /> PROGRAMS, METHODS OR PROCEDURES OF OPERATION, OR THE <br /> ¢�a ///� CONSTRUCTION OF THE DESIGN SHOWN ON THESE DRAWINGS. e �c is DESIGNED BY: DATE: <br /> or "� ® ® ®"' 1736 Foonh Avenue S.Suim A WHERE SPECIFICATIONS ARE GENERAL OR NOT CALLED OUT, ''�y OF WNSNi $ C. WIEST MAY 2022 WATERFRONT PLACE CENTRAL CIP NO. <br /> 0 2-0-069-01 <br /> U N EVERE T Sea e,Yxshnbrton9g134 THE SPECIFICATIONS SHALL CONFORM TO STANDARDS OF MARINA FUEL TANK REPLACEMENT <br /> 1� W DRAWN BY: CHECKED BV: <br /> P:206.624.13g7 INDUSTRY. DRAWINGS ARE FOR USE ON THIS PROJECT ONLY <br /> N ENGINEERS,INC. Vw paaevginee.. 8/4/22 JBK REV 1 - PERMIT REVISIONS AND ARE NOT INTENDED FOR REUSE WITHOUT WRITTEN o�, RF 32789 E� �`� G. DEAN C. CASTONA PROJECT <br /> �Z P.O.BOX 538 0 5/31/22 JBK ISSUED FOR BID NP ANY VMANNER THAT WOULDICONSTITUTESAODETRIMENTE USED Fss ONALPE��\ APPROVED BY <br /> NOT TO TEMPORARY EROSION No. MCR-CM-2022-01 <br /> �a EVERETT,WA 98206 DIRECTLY OR INDIRECTLY TO END. <br /> m (425)259-3164 0 y AND SEDIMENT CONTROL SHEET N0. 10 OF 31 <br /> NO. DATE BY REVISION <br />