Laserfiche WebLink
Marina Fuel Tank Replacement STORMWATER REPORT <br /> PORT OF EVERETT PND Project No.154016-027.01 <br /> TABLE OF CONTENTS <br /> 1. INTRODUCTION...................................................................................................................................................1 <br /> 2. PROJECT DESCRIPTION....................................................................................................................................2 <br /> 2.1. Existing Conditions..........................................................................................................................................2 <br /> 2.2. Proposed Conditions.......................................................................................................................................2 <br /> 3. CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN...........................................2 <br /> 4. HYDROLOGY.........................................................................................................................................................2 <br /> 5. PERMANENT STORMWATER CONTROL PLAN......................................................................................3 <br /> 6. OFFSITE ANALYSIS.............................................................................................................................................3 <br /> 7. MINIMUM REQUIREMENTS............................................................................................................................3 <br /> 7.1. MR#1 —Preparation of Stormwater Site Plan............................................................................................5 <br /> 7.2. MR#2—Construction stormwater Pollution Prevention Plan (SWPPP)..............................................5 <br /> 7.3. MR#3—Source Control of Pollution..........................................................................................................5 <br /> 7.4. MR#4—Preservation of Natural Drainage Systems and Outfalls..........................................................5 <br /> 7.5. MR#5—On-Site Stormwater Management................................................................................................6 <br /> 7.6. MR#6—Runoff Treatment...........................................................................................................................6 <br /> 7.7. MR#7—Flow Control....................................................................................................................................6 <br /> 7.8. MR#8—Wetlands Protection.......................................................................................................................6 <br /> 7.9. MR#9—Operation and Maintenance..........................................................................................................6 <br /> FIGURES <br /> Figure 1-1:Vicinity Map <br /> Figure 7-1:Minimum Requirements for Redevelopment Project <br /> Figure 7-3:Runoff Treatment BMP Selection <br /> APPENDICES <br /> Appendix A—Construction Plans <br /> Appendix B-SWPPP <br /> Appendix C—Drainage Basins <br /> Appendix D—Geotechnical Report <br /> © © 0 <br /> i <br />