Laserfiche WebLink
VERETT <br />0 <br />Permit Number: B2402-035 <br />Applied: 2/16/2024 <br />Issued: 4/15/2024 <br />Status: FINALED <br />Parent Permit: <br />Parent Project: <br />Details <br />Permit Inspections <br />City of Everett <br />Approved:4/13/2024 <br />Finaled: 9/11/2024 <br />Description: TI: NEW INTERIOR WALLS, FLOORS, CEILING & KITCHEN <br />Site Address: 2810 COLBY AVE <br />City, State Zip Code: EVERETT, WA 98201-3513 <br />Applicant: CLINT JOHNSON <br />Owner: 2810 COLBY LLC <br />Contractor: BLOX CONSTRUCTION INC <br />SCHEDULED DATE <br />COMPLETED DATE <br />TYPE <br />INSPECTOR <br />RESULT <br />REMARKS <br />7/18/2024 <br />7/18/2024 <br />BLDG 08-FRAMING <br />RAKEEB KHAN <br />APPROVAL <br />as noted <br />Notes: <br />7/17/2024 3:30 PM Colin O"Keefe <br />Contact Name: Colin 0"Keefe <br />Site Address: 3501 Rucker Ave <br />Phone:2067244158 <br />e-Mail: colino@bloxconstruction.com <br />New framing is all metal studs. Walls are ok. Hardlids in restrooms need mechanical approval prior to cover. Ok to cover after mechanical is approved. <br />7/24/2024 <br />7/24/2024 <br />BLDG 10-DRYWALL <br />I RAKEEB KHAN <br />APPROVAL <br />as noted <br />NAILING <br />Notes: <br />7/23/2024 10:06 AM Colin O"Keefe <br />Contact Name: Colin 0"Keefe <br />Site Address: 3501 Rucker Ave <br />Phone:2067244158 <br />e-Mail: colino@bloxconstruction.com <br />Contractor to finish installing drywall. OK to mud and tape. <br />9/10/2024 <br />9/10/2024 <br />FIRE 03-BLDG FINAL <br />GORDON <br />APPROVAL <br />eTRAKiT Inspection Request <br />FOR FIRE <br />MOSTELLER <br />Notes: <br />9/9/2024 1:19 PM Colin 0"Keefe <br />Contact Name: Colin 0"Keefe <br />Site Address: 2810 COLBY AVE <br />Phone:2067244158 <br />e-Mail: colino@bloxconstruction.com <br />I <br />Printed: Tuesday, 17 September, 2024 1 of 2 rk <br />SUPERION <br />