Laserfiche WebLink
PROJECT: Cross Dock <br /> r 1 �MIC „ FOR: Tuff Shed_Jeffery Beag <br /> ADDRESS: 6501 Rainier Dr., <br /> Everett,WA <br /> SHEET#: 21 <br /> MATERIAL HANDLING ENGINEERING CALCULATED BY: tchang <br /> EST.1985 DATE: 6/11/2024 <br /> TEL:(909)869-0989 PN: 20240523 5 <br /> 1130 E.CYPRESS ST,COVINA,CA 91724 <br /> OVERTURNING ANALYSIS Configurationl Type 144" <br /> Per RMI Sec 2.6.9 and ASCE7-16.Sec 15.5.3.6.Weight of rack with all levels loaded to 67%capacity.&with only top level loaded <br /> FULLY LOADED <br /> w <br /> Wp,=7,200 lbs W„=200 lbs <br /> 11 Fr <br /> Wp,•67%=7,200.0.67=4,824 lbs *MI�F6 <br /> :ilk <br /> V,.,,,,=(1.0.22.1•((0.67.4,824)+200))=755 lbs �111111111111 F 5 <br /> M0,,,=VT..•Ht=755.105=79,275 in-lbs <br /> �i�F4 <br /> Elm <br /> Mg,=((Wp,•0.67)+Wd,)•d•Factor I� <br /> F3 <br /> =((7,200.0.67)+200)•48.0.5=120,576 in-lbs PAW <br /> P pie= 1•(M,,,-M5)/d=(79,275- 120,576)/48=-860 lbs ,i F2 <br /> pr F1 <br /> ��psa 0)=no uplift ;.,...:.. .`:-.... .::: : ::::� <br /> PUpllit T D <br /> P, w = 1•(Mop,+Ms,)/d=(79,275+ 120,576)/48=4,163 lbs CROSS AISLE ELEVATION <br /> TOP SHELF LOADED <br /> Shear=836 lbs <br /> =V,.OP•Ht=836•(98+((52- 10)/2))=99,484 in-lbs <br /> My =(1+Wd,)•d=(3,600+200)•(48.0.5)=91,200 in-lbs <br /> P.ph„=1•(Mop,-Mg,)/d=(99,484-91,200)/48=172 lbs <br /> ANCHORS <br /> No.of Anchors(#Anchors):2 <br /> Pull Out Capacity per Anchor(TA,10 ,): 1,543 lbs <br /> Shear Capacity per Anchor: 1,661 lbs <br /> COMBINED STRESS <br /> Fully Loaded =((0/2)/ 1,543)+((755/4)/1,661) =0.114 <br /> Top Shelf Loaded =((172/2)/1,543)+((836/4)/1,661) =0.182 <br /> Seismic UpLift =(0/2)/1,543 =0 <br /> Critical(LC#7B) <br />