POST-INSTALLED ANCHORS REPORT Terracon <br /> Report Number: M7241579.0001 <br /> Service Date: 08/23/24 20225 Cedar Valley Rd Ste 110 <br /> Report Date: 08/27/24 Lynnwood, WA 98036-6365 <br /> 425-742-9360 <br /> Client Project <br /> Tuff Shed, Inc. Everett Tuff Shed Steel Racks <br /> Attn: Joy Flores 6501 Rainier Dr. #B <br /> 17500 W Valley Hwy Everett, WA <br /> Tukwila, WA 98188 <br /> Project Number: M7241579 <br /> General Information <br /> Josh Cahoon requested Terracon to be on site to observe the installation of mechanical anchor(s) being installed by Tuff Shed. Results of <br /> observation(s) performed today were reported to Josh Cahoon. The Terracon representative arrived at the site at 0930 and departed at 1130. <br /> The construction documents referenced for this observation include: Structural plans dated 6/13/2024. Permit No: B2405-075. <br /> Anchor System Information <br /> The following anchor types were used during today's observation: <br /> Anchor No. Anchor Type ICC Report Anchor Dia. Anchor Length Required Referenced <br /> (in.) (in.) Torque (ft-lb) <br /> 1 Simpson Titen HD 2713 1/2" 6" 65 3/24-1320-B <br /> 2 Simpson Titen HD 2713 5/8" 6" 100 3/24-1320-B <br /> Testing Equipment <br /> Test Equipment Description Calibration Date <br /> Toque wrench # 1147 2023-09-06 <br /> Anchor Installation <br /> The above anchors were installed as follows: <br /> Anchor Locations Quantity Hole Depth & Embedment Spacing &Edge Status* <br /> No. (tested/total) Diameter(in.) (in.) Distance (in.) <br /> 1 (1) Cross dock helves to slab on 16/16 6 3/4" &1/2" 5 3/4" N/A&N/A Complies <br /> grade. <br /> 2 (2) Cross dock racks 48/48 6 3/4" &5/8" 5 3/4" N/A&N/A Complies <br /> *See below for more information <br /> Holes were cleaned prior to installation by: not required. Ambient Temperature during observation was 601 F. <br /> Additional Comments <br /> Anchors were previously installed did not witness installation researched Simpson website to verify top stamp on anchors. <br /> Compliance <br /> Based on our observations and testing,the post-installed anchors referenced above appear to be in general accordance with the project <br /> documents. <br /> Services: Special Inspections/ Materials Testing <br /> Terracon Rep.: Randal Dohrman <br /> Reported To: Josh Cahoon <br /> Contractor: Tuff Shed <br /> Report Distribution: <br /> (1)Tuff Shed,Inc.,Joy Flores (1)City of Everett WA,Tony Lee ��••'' - '/ <br /> (1)Terracon Consultants,Inc.,Gale (1)Terracon Consultants,Inc.,Todd Reviewed By: < <br /> (1)Tuff Shed,Inc.,Jeff Beagley <br /> Todd Wirtz <br /> Senior Project Field Manager <br /> The tests were performed in general accordance with applicable ASTM,AASHTO,or DOT test methods. This report is exclusively for the use of the client indicated above <br /> and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at <br /> the location(s)referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. <br /> D11018,04-29-22,Rev.5 Page 1 of 1 <br />