My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10633 EVERGREEN WAY 2025-01-10
>
Address Records
>
EVERGREEN WAY
>
10633
>
10633 EVERGREEN WAY 2025-01-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/10/2025 9:49:30 AM
Creation date
12/10/2024 2:08:44 PM
Metadata
Fields
Template:
Address Document
Street Name
EVERGREEN WAY
Street Number
10633
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DAILY FIELD REPORT Inspection <br /> Date <br /> r AAR TESTING AND INSPECTION, INC. 08/21/2024 <br /> Report <br /> 7126 180th Ave NE, Suite C101, Redmond, WA 98052 1 425-881-5812 Number <br /> SAA082124B <br /> CLIENT INFORMATION PROJECT INFORMATION <br /> Contact Brian Fisher Project No. 24-376B <br /> Company VWOFE, Inc dba Rairdon VW of Everett Project Name Rairdon VW of Everett Vehicle Lifts Hunter <br /> Address 22102 17th Ave SE Suite 100 Address 10633 Evergreen Way <br /> City Everett City Everett <br /> Contractor Permit No. B2405-020 <br /> INSPECTION TYPE(S) STRUCTURE(S) / LOCATION(S) <br /> O Proprietary Anchors - Mechanical Hunter lift anchors <br /> Weather Temperature (OF) Start Time End Time <br /> Overcast 62 07:30 AM <br /> DRAWINGS/ DOCUMENTS REFERENCED <br /> Approved project SSK-1 <br /> INSPECTION OBSERVATION / REMARKS <br /> As requested, I was on site to inspect the installation of 1/2"Hilti Kwik bolt anchors into existing concrete at the Hunter car lift. When on site, I <br /> reviewed the project SSK-1 and ESR Report 4266. <br /> I verified that the approved anchors were installed to the required embedment depth of 4 1/2 inches with spacing/ quantities as per SSK-1. <br /> I used a calibrated torque wrench to verify tightening torque on the anchor nuts and found that the nuts were tightened to at least 40 foot <br /> pounds. <br /> Today, I inspected the installation of a total of 8 anchors. Work was performed per ESR Report 4266, manufacturer's directions, and the project <br /> plans. <br /> Items inspected are in conformance with approved plans, specifications,and jurisdictional requirements <br /> Inspectors Signature Inspectors Name Report Date Reviewers Reviewed By Reviewed Date <br /> Savid Acuna 08/22/2024 Signature Teajalam (T3) <br /> Gounden <br /> c2dOd6419d6c5d4a-1724285045522 <br />
The URL can be used to link to this page
Your browser does not support the video tag.