Laserfiche WebLink
Now NATIONAL <br /> IA DES GNcom <br /> National Design Company LLC 11010 SE Everett Mall Way, Suite 102, Everett, WA 98208 <br /> info@nationaldesigwa.com I nationaldesigncorp.com <br /> ,./New garage 1 eave extends into 5' setback line on west side. Per <br /> Table R302.1 (1), when fire separation distance is less than 5ft, <br /> projection shall be 1 hr fire resistance rated. Fire separation distance <br /> definition please refer to IRC 202. Please update drawing accordingly. <br /> Please see sheet A-3.1, A-3.2 <br /> 4,Per IRC Table 302.6, not less than 1/2-inch gypsum board or <br /> equivalent applied to the garage side when next to residence. Please <br /> add note in floor plan and update note in 2/A 4.0 <br /> Please see sheet A-4.0 <br /> 5.,Per IRC 408.4, access shall be provided to all under-floor spaces. <br /> ", Access openings through the floor shall be not smaller than 18 inches <br /> by 24 inches. Please show access on floor plan. <br /> Please see sheet A-2.0 <br /> • 6. Per IRC 806.2. Exception, the minimum net free ventilation area shall <br /> be 1 /300 of the vented space provided both conditions are met. City <br /> of Everett is located in Climate zone 4C, so this exception is not <br /> appliable with the project. Please update roof ventilation calculation <br /> and include a roof detail to show the vents, eave baffle and airflow <br /> path. <br /> Please see sheet A-3.2 <br /> 7.;Please show kitchen, bathroom and whole house ventilation on floor <br /> F i plan or RCP per IRC M1505.4.3 and M,1505.4.4(1). I saw the notes on <br /> sheet A-5.0, but for inspection purpose, kindly show them on plans <br /> with CFM as well. <br /> Please see sheet A-2.0 <br /> ,a/In 4/A-4.0 Baffled Foundation Vent detail, please show ground and <br /> framing clearance dimensions. Also please coordinate with structural <br /> detail C/S2.1 . <br /> Please see sheet A-4.0 <br /> 0? lease provide roof detail showing ventilation and eave baffle. <br />