Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers.All questions shall be routed through this project's Public Works <br /> Reviewer Thad Newport with City of Everett Permit Services (TNewport@everettwa.gov). <br /> # Document Sht/Pg Reviewer's Comment Designer's Response Initials <br /> 1 Civil — The building permit plans did not include the Site Plan,TESC Plan <br /> Plans/Small and Details that were previously submitted via email for pre- <br /> Project review.Also,the plans included in the stormwater site plan are <br /> Stormwater different from the pre-review plans emailed.The below <br /> Site Plan comments will be based on the submitted plans in the drainage <br /> report, but full-size plans will be needed for final approval. <br /> 2 Small - Page 3 of the report calls out 446 square feet of hard surface <br /> Project area on the ground, but the plans appear to mis label the <br /> Stormwater existing driveway vs.the new driveway. Please revise the plans <br /> Site Plan accordingly and dimension the new paved area for so the <br /> inspector will be able to verify the proposed paved area. <br /> 3 Small 5 MR#1 Task 2: Please complete the "How will stormwater be <br /> Project managed?" section. <br /> Stormwater <br /> Site Plan <br /> 4 Small 7 MR#2 Task 1: Please complete the "Downstream drainage <br /> Project leading from the stie to a receiving body of water:" section. <br /> Stormwater <br /> Site Plan <br /> 5 Small 17 Select if the project is flow control exempt. Complete the <br /> Project corresponding List#1 or List#3 MR#5 sections depending on the <br /> Stormwater flow control exempt selection.The plans indicate a perforated <br /> Site Plan stub-out connection is proposed, but there is no documentation <br /> provided (worksheet 2 starting on page 25)that shows the <br /> higher priority BMPs are infeasible. <br /> 6 Civil Plans C3 Update notes to include all 16 notes found in the City of Everett <br /> TESC Design and Construction Standards and Specifications Chapter 2- <br /> Notes 5. <br /> Page 2 of 3 <br />