My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11020 1ST DR SE 2025-01-28
>
Address Records
>
1ST DR SE
>
11020
>
11020 1ST DR SE 2025-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:16:54 PM
Creation date
12/10/2024 2:18:49 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST DR SE
Street Number
11020
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The comments below were generated from this project's City of Everett Civil Reviewers.All questions shall be routed through this project's Public Works <br /> Reviewer Thad Newport with City of Everett Permit Services (TNewport@everettwa.gov). <br /> # Document Sht/Pg Reviewer's Comment Designer's Response Initials <br /> 1 Civil — The building permit plans did not include the Site Plan,TESC Plan <br /> Plans/Small and Details that were previously submitted via email for pre- <br /> Project review.Also,the plans included in the stormwater site plan are <br /> Stormwater different from the pre-review plans emailed.The below <br /> Site Plan comments will be based on the submitted plans in the drainage <br /> report, but full-size plans will be needed for final approval. <br /> 2 Small - Page 3 of the report calls out 446 square feet of hard surface <br /> Project area on the ground, but the plans appear to mis label the <br /> Stormwater existing driveway vs.the new driveway. Please revise the plans <br /> Site Plan accordingly and dimension the new paved area for so the <br /> inspector will be able to verify the proposed paved area. <br /> 3 Small 5 MR#1 Task 2: Please complete the "How will stormwater be <br /> Project managed?" section. <br /> Stormwater <br /> Site Plan <br /> 4 Small 7 MR#2 Task 1: Please complete the "Downstream drainage <br /> Project leading from the stie to a receiving body of water:" section. <br /> Stormwater <br /> Site Plan <br /> 5 Small 17 Select if the project is flow control exempt. Complete the <br /> Project corresponding List#1 or List#3 MR#5 sections depending on the <br /> Stormwater flow control exempt selection.The plans indicate a perforated <br /> Site Plan stub-out connection is proposed, but there is no documentation <br /> provided (worksheet 2 starting on page 25)that shows the <br /> higher priority BMPs are infeasible. <br /> 6 Civil Plans C3 Update notes to include all 16 notes found in the City of Everett <br /> TESC Design and Construction Standards and Specifications Chapter 2- <br /> Notes 5. <br /> Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.