My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11020 1ST DR SE 2025-01-28
>
Address Records
>
1ST DR SE
>
11020
>
11020 1ST DR SE 2025-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 1:16:54 PM
Creation date
12/10/2024 2:18:49 PM
Metadata
Fields
Template:
Address Document
Street Name
1ST DR SE
Street Number
11020
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
44
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> 5/7/2024 5/7/2024 BLDG 08-FRAMING RAKEEB KHAN CORRECTION eTRAKiT Inspection Request <br /> REQUIRED <br /> Notes: <br /> 5/3/2024 2:27 PM anatoliy zayats <br /> Contact Name:Anatoliy Zayats <br /> Site Address:116 119TH ST SE,A <br /> Phone:4253440624 <br /> e-Mail:TOLIK 86@YAHOO.COM <br /> Exterior slab eliminated now is framed as a deck. Deck framing is 2x10 at 16 inch on center per code. Beams are 4x10 with max spacing of 6'6".Footings <br /> at short span OK to be 16"sq footings by 18 inch deep.At longer span interior footing to be 24 in sq by 18 inches deep (2#4's e.w.)all other footings ok <br /> to be 16"sq. Missing a35 clips at porch rafters. <br /> BLDG 09-FIRE CORRECTION <br /> 5/7/2024 5/7/2024 STOPPING/BLOCKIN RAKEEB KHAN REQUIRED <br /> G <br /> Notes: <br /> Foam all penetrations and top plate and bottom plate. Fireproof every 10 feet vertical and horizontal. <br /> 5/10/2024 5/10/2024 BLDG 02- RAKEEB KHAN T <br /> APPROVAL <br /> FOOTING/SETBACK <br /> Notes: <br /> 5/10/2024 5/10/2024 BLDG 08-FRAMING I RAKEEB KHAN I APPROVAL as noted <br /> Notes: <br /> 5/7/2024 2:24 PM anatoliy zayats <br /> Contact Name:anatoliy zayats <br /> Site Address:11020 1ST DR SE <br /> Phone:4253440624 <br /> e-Mail:TOLIK_86@YAHOO.COM <br /> Contractor to install 410 interior beam and the post base brackets will attach directly to the beams. <br /> BLDG 09-FIRE <br /> 5/10/2024 E <br /> 10/2024 STOPPING/BLOCKIN RAKEEB KHAN APPROVAL <br /> G <br /> Notes: <br /> 5/14/2024 5/14/2024 BLDG 12- RAKEEB KHAN PARTIAL eTRAKiT Inspection Request <br /> INSULATION APPROVAL <br /> Notes: <br /> 5/10/2024 11:37 AM anatoliy zayats <br /> Contact Name:Anatoliy Zayats <br /> Site Address:116 119TH ST SE,A <br /> Phone:4253440624 <br /> e-Mail:TOLIK_86@YAHOO.COM <br /> Walls only.All new framed walls have R-21 insulation.Will verify floor and attic insulation at final.Ok to drywall. <br /> I <br /> Printed: Monday,09 December, 2024 3 of 4 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.