VIEW KEY
<br />NAME LEVEL NAME
<br />�� INDICATES NOTE USED TO DESCRIBE
<br />V 10'-0" �HEIGHTABOVE
<br />ADDITIONAL INFORMATION ABOUT
<br />PROJECT 0'-0"
<br />WORK REQUIRED, SPECIFIC TO THE
<br />SHEET AND/OR DETAIL
<br />INDICATES DIRECTION OF TRUE NORTH
<br />PLAN OR DETAIL NUMBER
<br />PLAN OR DETAIL NAME
<br />/� VIEW NAME
<br />PLAN OR DETAIL SCALE
<br />ORT
<br />INDICATES SIMILAR DETAIL REFERENCED
<br />Sltit� IN MULTIPLE LOCATIONS SIM
<br />DETAIL REFERRED TO BY SECTION CUT 1
<br />1 4 2
<br />M101 SHEET DETAIL IS LOCATED ON T101 3
<br />LINE TYPE AND TAG KEY:
<br />NEW WORK BY THIS CONTRACTOR (WIDE LINE)
<br />NEW
<br />--------- EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
<br />- - - NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
<br />EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
<br />EXISTING
<br />EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
<br />- - - EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
<br />HALFTONING DOES NOT MODIFY SCOPE.
<br />'TAG'-E TAGS WITH DASH'E' INDICATES THE REFERENCED OBJECT IS EXISTING
<br />TAGA UNDERLINED TAG INDICATES OBJECT IS IN -SCOPE. IF NEW, ADDITIONAL
<br />INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
<br />INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
<br />CONTRACTOR ABBREVIATION KEY
<br />ABBR:
<br />DESCRIPTION:
<br />A.T.C.
<br />ASBESTOS ABATEMENT CONTRACTOR
<br />C.M.
<br />CONSTRUCTION MANAGER
<br />E.C.
<br />ELECTRICAL CONTRACTOR
<br />F.P.C.
<br />FIRE PROTECTION CONTRACTOR
<br />G.C.
<br />GENERAL CONTRACTOR
<br />M.C.
<br />MECHANICAL CONTRACTOR
<br />P.C.
<br />PLUMBING CONTRACTOR
<br />T.C.C.
<br />TEMPERATURE CONTROLS CONTRACTOR
<br />MECHANICAL ABBREVIATION KEY
<br />ABBR:
<br />DESCRIPTION:
<br />AD
<br />ACCESS DOOR
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />C
<br />COMMON
<br />CO
<br />CLEANOUT
<br />CD-E
<br />CEILING DIFFUSER - EXISTING
<br />CFSD
<br />CONTROL/FIRE/SMOKE DAMPER
<br />DPG (0-2")
<br />DIFFERENTIAL PRESSURE GAUGE (RANGE)
<br />DPS
<br />DIFFERENTIAL PRESSURE SWITCH
<br />EA
<br />EXHAUST/RELIEF AIR
<br />ECFSD
<br />EXISTING CONTROL FIRE SMOKE DAMPER
<br />EFD
<br />EXISTING FIRE DAMPER
<br />EFSD
<br />EXISTING FIRE SMOKE DAMPER
<br />EP
<br />ELECTRICAL TO PNEUMATIC VALVE
<br />ESD
<br />EXISTING SMOKE DAMPER
<br />FD
<br />FIRE DAMPER
<br />FOB
<br />FLAT ON BOTTOM
<br />FOT
<br />FLAT ON TOP
<br />FSD
<br />FIRE/SMOKE DAMPER
<br />MA
<br />MIXEDAIR
<br />MV
<br />MIXING VALVE
<br />NC
<br />NEW CONNECTION
<br />N.C.
<br />NORMALLY CLOSED
<br />NIC
<br />NOT IN CONTRACT
<br />N.O.
<br />NORMALLYOPEN
<br />CA
<br />OUTSIDEAIR
<br />PS
<br />PRESSURE SWITCH
<br />RA
<br />RETURN AIR
<br />SA
<br />SUPPLYAIR
<br />SD
<br />SMOKE DAMPER
<br />TAB
<br />TERMINALAIRBOX
<br />TO
<br />TRANSFER DUCT
<br />TYP
<br />TYPICAL
<br />UC-1
<br />DOOR UNDERCUT BY OTHERS (1" TYPICAL)
<br />UNO
<br />UNLESS NOTED OTHERWISE
<br />MECHANICAL SYMBOL LIST
<br />NOT ALL SYMBOLS MAY APPLY.
<br />SYMBOL:
<br />DESCRIPTION:
<br />-CR-
<br />CONDENSER WATER RETURN
<br />-CS-
<br />CONDENSER WATER SUPPLY
<br />-CWR-
<br />CHILLED WATER RETURN
<br />-CWS-
<br />CHILLED WATER SUPPLY
<br />DRAIN
<br />-D-
<br />-G-
<br />NATURAL GAS
<br />-HWR-
<br />HEATING WATER RETURN
<br />-HWS-
<br />HEATING WATER SUPPLY
<br />7
<br />PIPE CAP
<br />O
<br />PIPE DOWN
<br />-----0
<br />PIPE UP OR UP/DOWN
<br />r_
<br />PITCH PIPE IN DIRECTION
<br />111i
<br />DIRECTION OF FLOW IN PIPE
<br />NEW CONNECTION
<br />11-
<br />DIELECTRIC CONNECTION
<br />UNION/FLANGE
<br />DG
<br />SHUTOFF VALVE NORMALLY OPEN
<br />SHUTOFF VALVE NORMALLY CLOSED
<br />Cq
<br />THROTTLING VALVE
<br />BALANCING VALVE (NUMBER INDICATES GPM)
<br />AUTOMATIC BALANCING VALVE
<br />MIXING VALVE
<br />CONTROL VALVE(THREE-WAY)
<br />�j
<br />CONTROL VALVE (TWO-WAY)
<br />SOLENOID VALVE
<br />CHECKVALVE
<br />-- Mo--
<br />METER
<br />DIRECTION OF AIR FLOW
<br />L�
<br />FLEXIBLE DUCT
<br />MANUAL VOLUME DAMPER
<br />RISE IN DIRECTION OF AIR FLOW
<br />DROP IN DIRECTION OF AIR FLOW
<br />DUCT CAP
<br />DUCT DOWN
<br />DUCT UP
<br />SUPPLY/OUTSIDE AIR DUCT SECTION
<br />.L
<br />®
<br />RETURN AIR DUCT SECTION
<br />®
<br />EXHAUST/RELIEF AIR DUCT SECTION
<br />®
<br />4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION
<br />CD-1
<br />AIR TERMINAL PROPERTIES SYMBOL
<br />6/115
<br />NECK SIZE/CFM
<br />r�
<br />4 I ®
<br />TERMINAL AIR BOX (REFER TO SCHEDULE)
<br />(� n
<br />TERMINAL AIR BOX /REHEAT COIL (REFER TO SCHEDULE)
<br />FAN POWERED TERMINAL AIR BOX w/REHEAT COIL
<br />En
<br />(REFER TO SCHEDULE)
<br />OPPOSED BLADE DAMPER (REFER TO SCHEDULE)
<br />®
<br />PARALLEL BLADE DAMPER (REFER TO SCHEDULE)
<br />®
<br />QH
<br />HUMIDISTAT SENSOR
<br />HHUMIDISTAT/SENSOR
<br />©
<br />CARBON MONOXIDE SENSOR
<br />©2
<br />CARBON DIOXIDE SENSOR
<br />Q
<br />OCCUPANCYSENSOR
<br />(P)
<br />PRESSURE SENSOR/MONITOR
<br />©
<br />PRESSURE SENSOR (DUCT MOUNTED)
<br />(T)
<br />THERMOSTAT/SENSOR
<br />Q
<br />TEMPERATURE SENSOR
<br />CONTACT PERSONS:
<br />DESCRIPTION:
<br />PERSON:
<br />PROJECT MANAGER
<br />ASHLEE DOWNHAM
<br />MECHANICAL
<br />ANDY NACHTRAB
<br />ELECTRICAL
<br />ASHLEE DOWNHAM
<br />MECHANICAL GENERAL NOTES:
<br />THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
<br />TO, VENTILATION AND TEMPERATURE CONTROL.
<br />1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
<br />DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
<br />DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
<br />AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
<br />INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
<br />CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
<br />2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
<br />ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
<br />PHYSICALLY AT SITE. REVIEW ALL DRAWINGS INCLUDING THOSE OF OTHER TRADES.
<br />3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
<br />CLEARANCES REQUIRED FOR OPERATION MAINTENANCE CODE COMPLIANCE AND TO
<br />VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
<br />VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
<br />OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
<br />WITH FABRICATION OR EQUIPMENT ORDERS.
<br />4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
<br />REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
<br />ACCESS.
<br />5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
<br />COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
<br />EXPENSE TO OTHERS.
<br />6. EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
<br />CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
<br />DESIGN.
<br />7. REFER TO ARCHITECTURAL REFLECTED CEILING PLAN, ELECTRICAL, TECHNOLOGY
<br />AUDIONISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
<br />MOUNTED DEVICES, OTHER THAN SPRINKLERS.
<br />8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
<br />FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
<br />RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
<br />FINISH.
<br />9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
<br />GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
<br />PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
<br />PANELS PRIOR TO BIDDING.
<br />10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
<br />AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
<br />SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
<br />FOR OUTDOOR USE.
<br />11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON -FIRE RATED WALL,
<br />PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
<br />TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
<br />WITHIN ROOMS.
<br />12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
<br />OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
<br />RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
<br />13. EQUIPMENT SIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
<br />MANUFACTURERS, CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
<br />REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
<br />PIPING, DUCTWORK, ETC.
<br />14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
<br />15. MAINTAIN MINIMUM 3'-6" CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR
<br />STARTERS, SWITCHES, AND DISCONNECTS.
<br />16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
<br />EXTEND MINIMUM 6" BEYOND ALL SIDES OF EQUIPMENT.
<br />17. DO NOT SUPPORT EQUIPMENT, PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
<br />NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
<br />CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
<br />18. ALL NEW DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSIONS.
<br />19. WITH SPECIFICATIONS.
<br />PLUMBING SYMBOL LIST
<br />NOT ALL SYMBOLS MAY APPLY.
<br />SYMBOL: DESCRIPTION:
<br />---CW-
<br />COLD WATER -POTABLE
<br />DRAIN
<br />HOT WATER - POTABLE
<br />HOT WATER CIRCULATING - POTABLE
<br />SANITARY DRAINAGE
<br />VENT
<br />-D-
<br />-HW-
<br />-HWC-
<br />-SAN-
<br />-V-
<br />-
<br />PIPE CONTINUATION
<br />PIPE CAP
<br />PIPE DOWN
<br />PIPE UP OR UP/DOWN
<br />DIRECTION OF FLOW IN PIPE
<br />NEW CONNECTION
<br />DIELECTRIC CONNECTION
<br />UNION/FLANGE
<br />SHUTOFF VALVE NORMALLY OPEN
<br />SHUTOFF VALVE NORMALLY CLOSED
<br />BALANCING VALVE (NUMBER INDICATES GPM)
<br />PUMP
<br />METER
<br />ALIGNMENTGUIDE
<br />PIPE ANCHOR
<br />EXPANSION JOINT
<br />D
<br />------ 0
<br />I-
<br />DG
<br />GPM
<br />-
<br />-K-
<br />MECHANICAL SHEET INDEX
<br />MO
<br />MECHANICAL COVERSHEET
<br />M7
<br />MECHANICAL DEMOLITION PLAN
<br />M2
<br />MECHANICAL PLAN
<br />M3
<br />MECHANICAL AND PLUMBING DETAILS
<br />M4
<br />MECHANICAL AND PLUMBING SCHEDULES
<br />M5
<br />MECHANICAL SCHEDULES
<br />M6
<br />VRF PIPING SCHEMATIC
<br />M7
<br />MECHANICAL AND PLUMBING SPECIFICATIONS
<br />M8
<br />MECHANICAL AND PLUMBING SPECIFICATIONS
<br />M9
<br />MECHANICAL AND PLUMBING SPECIFICATIONS
<br />M10
<br />MECHANICAL ENERGY COMPLIANCE FORMS
<br />M11
<br />MECHANICAL ENERGY COMPLIANCE FORMS
<br />M12
<br />MECHANICAL ENERGY COMPLIANCE FORMS
<br />P1
<br />PLUMBING PLAN
<br />GRAND TOTAL: 14
<br />VENTILATION GENERAL NOTES:
<br />1. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO
<br />EACH OTHER.
<br />2. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.
<br />3. EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING
<br />DRAWINGS, AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL USE PRE -BALANCE
<br />VALUES, AND NOT EXISTING CFM SHOWN ON DRAWINGS.
<br />4. CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE
<br />CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL
<br />TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED
<br />AS SPECIFIED FOR NEW DUCTWORK.
<br />TAB POST -CONSTRUCTION NOTES:
<br />1. AFTER CONSTRUCTION ACTIVITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) AND
<br />BALANCING CONTRACTOR SHALL REBALANCE AIR HANDLING UNITS AND EXHAUST FANS AS
<br />REQUIRED TO ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION
<br />DRAWINGS.
<br />2. AREAS SERVED BY THIS EQUIPMENT WHICH WERE NOT RENOVATED SHALL BE RE-
<br />BALANCED TO THE AIRFLOW RATES MEASURED BEFORE THE RENOVATION OCCURRED
<br />(REFER TO THE FINAL PRE- DEMOLITION REPORT).
<br />3. IF DUCT TRAVERSE LOCATION AS MARKED ON THE DRAWINGS IS INACCESSIBLE FOR
<br />MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN ALTERNATE
<br />LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR GRILLE READINGS AS
<br />REQUIRED TO DETERMINE THE FLOW RATE. IN THE EVENT TRAVERSES ARE TAKEN AT AN
<br />ALTERNATE LOCATION(S), TAB CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS THE
<br />LOCATIONS WHERE THE ACTUAL MEASUREMENTS WERE TAKEN.
<br />4. A DUCT STATIC PRESSURE READING SHALL BE TAKEN AT EACH LOCATION WHERE A DUCT
<br />TRAVERSE READING IS TAKEN AND SHALL BE INCLUDED IN THE FINAL POST -CONSTRUCTION
<br />TAB REPORT.
<br />5. TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST -
<br />CONSTRUCTION TAB REPORT AS REQUIRED BY SECTION 23 05 93.
<br />6. THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRED IN THE
<br />SPECIFICATIONS.
<br />MECHANICAL RENOVATION NOTES:
<br />THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
<br />TO, VENTILATION, PIPING AND TEMPERATURE CONTROL.
<br />1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
<br />SURVEYS COMPLETED BY OTHERS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY
<br />EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE PROCEEDING.
<br />2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
<br />BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
<br />3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
<br />FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
<br />CONDITIONS
<br />4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK
<br />AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE
<br />REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF
<br />WORK.
<br />5. EACH CONTRACTOR SHALL CUT AND PATCH ROOFS, WALLS, AND FLOORS ASSOCIATED
<br />WITH HIS WORK.
<br />6. EACH CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS,
<br />CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
<br />CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
<br />BIDDING.
<br />7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
<br />NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
<br />EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
<br />DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
<br />SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
<br />8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
<br />CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
<br />REMAIN ACTIVE.
<br />9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
<br />REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
<br />SYSTEMS ARE INSTALLED.
<br />10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
<br />TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
<br />CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
<br />DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
<br />11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
<br />THAT HAS BEEN REMOVED.
<br />PLUMBING GENERAL NOTES:
<br />1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.
<br />CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR
<br />FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
<br />2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO
<br />THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
<br />RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN
<br />THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES
<br />PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE
<br />BASIS OF DESIGN.
<br />3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL
<br />APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.
<br />4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874
<br />5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY
<br />ALL ELEVATIONS BEFORE BEGINNING WORK.
<br />6. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO
<br />BEGINNING ANY WORK.
<br />7. REFER TO THE PLUMBING ROUGH -IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO
<br />PLUMBING FIXTURES.
<br />8. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN
<br />DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT
<br />BE CONSIDERED SHUTOFF VALVES.
<br />9. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL
<br />SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 22 05 05 FOR
<br />ADDITIONAL DEMOLITION INFORMATION.
<br />10. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK
<br />UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 05 05 FOR ADDITIONAL
<br />INFORMATION.
<br />MECHANICAL DESIGN CONDITIONS:
<br />DESIGN CONDITIONS: BASED ON WEATHER DATA FOR: EVERETT,
<br />SUMMER: 80.9°F DRY BULB, 63.8°F WET BULB
<br />WINTER: 25.4°F DRY BULB
<br />WINTER: (AIR SYSTEM'S OUTSIDE AIR STREAM) 21°F DRY BULB
<br />TYPICAL ROOM SETPOINTS:
<br />SUMMER DESIGN: 75°F DRY BULB, NO HUMIDITY REQUIREMENT
<br />WINTER DESIGN: 70°F DRY BULB, NO HUMIDITY REQUIREMENT
<br />SUMMER SETBACK: 85°F DRY BULB, NO HUMIDITY REQUIREMENT
<br />WINTER SETBACK: 60°F DRY BULB, NO HUMIDITY REQUIREMENT
<br />�I,blc LAWRENCE
<br />GROUP
<br />St. Louis
<br />319 North 4th Street
<br />Suite 1000
<br />St. Louis, Missouri 63102
<br />(314)231-5700
<br />Pmjed Team
<br />GENERAL CONTRACTOR:
<br />To Be Determined
<br />PROFESSIONAL ENGINEER:
<br />.IMEG
<br />IMEG
<br />7600 E Orchard Road, Suite 250-S
<br />Greenwood Village, CO 80111
<br />Phone: 303.796.6000
<br />IMEG Project No: 24000280.07
<br />i
<br />T C
<br />�I
<br />W
<br />N
<br />�
<br />N
<br />ILL
<br />N
<br />U
<br />Q
<br />O _
<br />s
<br />rn o
<br />m LLIW
<br />C
<br />o �
<br />(2)
<br />The Professional Architect's seal affP d to this cheat
<br />applies or ly to the material and items shown on this
<br />sheet. All drawings, instmmenta or other documents rot
<br />eAibidrg this seal shall not be wnsitlered prepared by
<br />thin arohitect. and this amhRect eV neealy disclaims any
<br />and all resporelbility far such plans, dawings or
<br />documents not exhibiting this seal.
<br />This tlawiN and detail, on it are the sole property of the
<br />aroht,d and may be uwd for this specific project only.
<br />It net not be maned, copied or reproduced, in whole or
<br />pan or fher or any otpurpose or project with,W fhe
<br />written consent of the erchXect.
<br />No. Description Date
<br />Shannne:
<br />MECHANICAL
<br />COVERSHEET
<br />Prged Number
<br />Sheet Number:
<br />2024906.011
<br />D.- By.
<br />MSK
<br />I... Dace:
<br />0
<br />MARCH 07, 2024
<br />
|