Laserfiche WebLink
A. CONTRACTOR SHSHEET NOTESALL NOTIFY IENGINEER OF PLUDISCREPMBING EXISTINGANCIES IN CONDITIONS. <br />B. ALL FIRE PROTECTION WORK SHALL BE DONE IN ACCORDANCE WITH NFPA 13 AND LOCAL <br />CODES. <br />C. EXISTING FIRE SPRINKLER HEADS ARE TO BE RELCOATED INTO NEW CEILING. FIRE <br />PROTECTION CONTRACTOR TO PROVIDE PIPING, FITTINGS, AND SPRINKLER HEADS AS <br />NECESSARY. EQUIPMENT TO MATCH EXISTING BUILDING STANDARD. FIRE PROTECTION <br />CONTRACTOR TO VERIFY FIRE SPRINKLER HEAD LOCATION WITH ARCHITECT, FURNITURE, <br />LIGHTING, AND HVAC EQUIPMENT. <br />D. ALL SPRINKLER HEADS SHALL MATCH EXISTING BUILDING STANDARD. <br />KEYNOTES <br />1 CONNECT NEW 3/4" CW PIPING TO EXISTING CW PIPING OF EQUAL OR LARGER SIZE. PROVIDE <br />ISOLATION VALVE AT POINT OF CONNECTION. CONTRACTOR SHALL FIELD VERIFY EXACT POINT OF <br />CONNECTION. <br />2 PROVIDE 1/2" CW PIPING DOWN IN WALL TO NEW OUTLET BOX, OB-#, FOR CONNECTION TO <br />REFRIGERATOR. COORDINATE OUTLET BOX ELEVATION AND FINAL PIPING FROM OUTLET BOX TO <br />APPLIANCE WITH ARCHITECT. REFER TO PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FOR <br />MORE INFORMATION. <br />3 PROVIDE NEW SUSPENDED ELECTRIC WATER HEATER, EWH-#. REFER TO WATER HEATER DETAIL <br />AND SCHEDULE FOR MORE INFORMATION. <br />4 PROVIDE 1/2" HW PIPING DOWN IN WALL TO OUTLET BOX, OB-#, FOR CONNECTION TO DISHWASHER. <br />ROUTE DRAIN FROM DISHWASHER TO DISHWASHER DRAIN CONNECTION AT GARBAGE DISPOSAL. <br />COORDINATE OUTLET BOX ELEVATION WITH ARCHITECT. REFER TO DISHWASHER/GARBAGE <br />DISPOSAL CONNECTION DETAIL AND PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FOR MORE <br />INFORMATION. <br />5 PROVIDE OUTLET BOX, OB-#, FOR WATER HEATER DRAIN AND CONDENSATE DRAINS FROM FAN <br />COIL UNITS. REFER TO PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FOR MORE INFORMATION. <br />6 ROUTE 1/2" CW AND HW PIPING DOWN IN WALL TO SERVE SINK, SK-#. INSTALL GARBAGE DISPOSAL, <br />GD-#, IN CONJUNCTION WITH SINK. REFER TO MIXING VALVE DETAIL AND PLUMBING FIXTURE AND <br />EQUIPMENT SCHEDULE FOR MORE INFORMATION. <br />7 PROVIDE 3/4" CONDENSATE DRAIN PIPING FROM FAN COIL UNIT IN ACCORDANCE WITH <br />MANUFACTURER'S INSTRUCTIONS. TYPICAL. <br />8 ROUTE COMBINED 1" CONDENSATE DRAIN PIPING TO OUTLET BOX OB-2 IN BREAK ROOM. <br />TERMINATE WITH MINIMUM 1" AIR GAP FITTING. <br />A�)PLUMBING PLAN <br />ll�1 1 /4" - 1 '-0,. <br />tiO RIT <br />�I,blc LAWRENCE <br />GROUP <br />St. Louis <br />319 North 4th Street <br />Suite 1000 <br />St. Louis, Missouri 63102 <br />(314)231-5700 <br />Pmjed Team <br />GENERAL CONTRACTOR: <br />To Be Determined <br />PROFESSIONAL ENGINEER: <br /><>IMEG <br />IMEG <br />7600 E Orchard Road, Suite 250-S <br />Greenwood Village, CO 80111 <br />Phone: 303.796.6000 <br />IMEG Project No: 24000280.07 <br />W <br />N <br />N <br />U <br />Q <br />0 - <br />L <br />I I I <br />00 <br />N <br />m W <br />(� <br />The Professional Architect's seal of had to this sheet <br />applies only to the material and items shmn on this <br />sheet. All drewings, trotherdocumenta <br />rot <br />exhibrgilithis seal shallnot be considered prepared by <br />airy <br />thin all -pC and this architect an., <br />d—disclaims <br />and all rta nat b,hi for such plans, drawings or <br />dowments not exhibiting this seal. <br />This lowing and details on it are the sole property of the <br />architect and may be used for this specific project only. <br />It shall not be loaned, copied or reproduced, in whole or <br />part or for any other purpose or project with- the <br />written consent of the erchXect. <br />No. Description Dale <br />Sheet Title <br />PLUMBING PLAN <br />Prged Number Sbeet Number. <br />2024906.011 <br />D.- It, <br />MSK <br />lase¢ Dace: <br />MARCH 07, 2024 <br />