Laserfiche WebLink
LAWRENCE <br />3 IMC 2021 ENTILATION RATE PROCEDURE CALCULATIONSc <br />''�ry`1'��` <br />GROUP <br />OCCUPANT <br />OCCUPANT <br />BREATHING <br />TABLE6-2ZONE <br />TOTALSUPPLY <br />SYSTEM <br />St. Louis <br />OUTDOOR <br />AREA <br />DENSITY <br />OVER -VENTILATION <br />ZONE <br />AIR <br />AIRTOZONEAT <br />ZONE <br />VENTILATION <br />MINIMUM <br />MINIMUM <br />319 North 4th Street <br />UNIT <br />FLOOR <br />ROOM <br />ROOM NAME <br />ZONE TYPE <br />AREA <br />AIRFLOW <br />OUTDOOR <br />PEOPLE <br />OCCUPANT <br />PERCENTAGE <br />OUTDOOR <br />DISTRIBUTION <br />CONDITION <br />VENTILATION <br />EFFICIENCY <br />PERCENTAGE OUTSIDEAIRFLOW <br />suite 1000 <br />NUMBER <br />SO FT <br />RATE <br />AIRFLOW RATE <br />PER 1000 <br />QUANTITY <br />AIRFLOW RATE <br />EFFECTIVENESS <br />ANALYZED <br />EFFICIENCY <br />NOTE 2 <br />AIRFLOW AT <br />AT UNIT <br />St. Louis, Missouri 63102 <br />(314)231-5700 <br />CFM/PER <br />CFM/SO FT <br />SO FT <br />CFM <br />(Ez) <br />CFM - NOTE 1 <br />(Evz) <br />(Ev) <br />UNIT <br />NOTE 3 <br />FCU - 1 <br />1st <br />107 <br />BREAK <br />Break rooms <br />155 <br />5.0 <br />0.06 <br />25 <br />4 <br />0% <br />29 <br />0.8 <br />640 <br />0.99 <br />0.83 <br />- <br />- <br />pmjauT¢am <br />1st <br />106C <br />SMALL CONFERENCE <br />Conference/meeting <br />84 <br />5.0 <br />0.06 <br />50 <br />4 <br />0% <br />26 <br />0.8 <br />180 <br />0.87 <br />0.83 <br />- <br />_ <br />GENERAL CONTRACTOR: <br />To Be Determined <br />let <br />106D <br />SMALL CONFERENCE <br />Conference/meeting <br />81 <br />5.0 <br />0.06 <br />50 <br />4 <br />0% <br />25 <br />0.8 <br />140 <br />0.83 <br />0.83 <br />- <br />- <br />1st <br />103 <br />PASSAGE <br />Corridors <br />166 <br />0.0 <br />0.06 <br />0 <br />0 <br />0% <br />10 <br />0.8 <br />840 <br />1.04 <br />0.83 <br />- <br />- <br />FCU - 1 TOTALS <br />1800 <br />0.83 5 % <br />109 <br />SPECIFIC NOTES: <br />PROFESSIONAL ENGINEER: <br />1. TOTAL SUPPLY AIR AT CONDITION ANALYZED USES THE MAXIMUM AIRFLOW PROVIDED TO THE ZONE DURING THE HEATING OR COOLING MODE, WHICHEVER IS BEING ANALYZED. <br />2. SYSTEM VENTILATION EFFICIENCY IS EQUAL TO THE LOWEST ZONE VENTILATION EFFICIENCY OF ALL ROOMS SERVED BY THE UNIT. <br />Unit Outside Airflow Balance Setpoint [tm] <br />110 <br />NMEG <br />3. SEE UNIT EQUIPMENT SCHEDULE FOR ACTUAL OUTSIDE AIR SETPOINT FOR BALANCING; WHICH WILL MEET OR EXCEED THE MINIMUM REQUIREMENT NOTED HEREIN. <br />Unit Meets IMC Requirements <br />Yes <br />IMEG <br />7600 E Orchard Road, Suite 250-S <br />Greenwood Village, CO 80111 <br />3 IMC 2021 ENTILATION RATE PROCEDURE CALCULATIONS <br />Pone 303.796.6000 <br />MhEG Project No: 24000280.07 <br />OCCUPANT <br />OCCUPANT <br />BREATHING <br />TABLE6-2 ZONE <br />TOTAL SUPPLY <br />SYSTEM <br />P-ssl°rol scar <br />OUTDOOR <br />AREA <br />DENSITY <br />OVER -VENTILATION <br />ZONE <br />AIR <br />AIRTOZONEAT <br />ZONE <br />VENTILATION <br />MINIMUM <br />MINIMUM <br />...E <br />OF I ... <br />UNIT <br />FLOOR <br />ROOM <br />ROOM NAME <br />ZONE TYPE <br />AREA <br />AIRFLOW <br />OUTDOOR <br />PEOPLE <br />OCCUPANT <br />PERCENTAGE <br />OUTDOOR <br />DISTRIBUTION <br />CONDITION <br />VENTILATION <br />EFFICIENCY <br />PERCENTAGE <br />OUTSIDEAIRFLOW <br />qh <br />w <br />NUMBER <br />SO FT <br />RATE <br />AIRFLOW RATE <br />PER 1000 <br />QUANTITY <br />AIRFLOW RATE <br />EFFECTIVENESS <br />ANALYZED <br />EFFICIENCY <br />NOTE 2 <br />AIRFLOW AT <br />AT UNIT <br />CFM/PER <br />CFM/SQ FT <br />SO FT <br />CFM <br />(Ez) <br />CFM - NOTE 1 <br />(Evz) <br />(Ev) <br />UNIT <br />NOTE 3 <br />c` <br />ss8 �taT r.E°G� <br />70NAL <br />F-� <br />FCU-2 <br />106A <br />BRANCH SUPPORT <br />Office space <br />224 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />19 <br />0.8 <br />175 <br />0.99 <br />0.89 <br />102A <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />0.93 <br />0.89 <br />- <br />- <br />ACV 97 1'9 a-od-6 <br />102B <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />0.93 <br />0.89 <br />- <br />- <br />102C <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />1 0.93 <br />0.89 <br />- <br />- <br />102D <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />0.93 <br />0.89 <br />- <br />- <br />102E <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />0.93 <br />0.89 <br />- <br />- <br />102F <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />0.93 <br />0.89 <br />- <br />- <br />poi¢°iTm¢: <br />101E <br />BRANCH SUPPORT <br />Office space <br />190 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />16 <br />0.8 <br />155 <br />1.00 <br />0.89 <br />- <br />- <br />o0 <br />103 <br />PASSAGE <br />Corridors <br />434 <br />0.0 <br />0.06 <br />0 <br />0 <br />0% <br />26 <br />0.8 <br />235 <br />0.99 <br />0.89 <br />- <br />- <br />0 <br />cV <br />CO <br />104 <br />EQUIP/SUPPLY <br />Occupiable storage rooms for dry materials <br />85 <br />5.0 <br />0.06 <br />2 <br />0 <br />0% <br />6 <br />0.8 <br />70 <br />1.02 <br />0.89 <br />- <br />- <br />Q <br />108 <br />STORAGE <br />Storage rooms <br />78 <br />0.0 <br />0.12 <br />0 <br />0 <br />0% <br />9 <br />0.8 <br />50 <br />0.89 <br />0.89 <br />- <br />- <br />N <br />109 <br />LOUNGE <br />Office space <br />68 <br />5.0 <br />0.06 <br />5 <br />0 <br />0% <br />6 <br />0.8 <br />55 <br />1.00 <br />0.89 <br />- <br />- <br />W <br />FCU-2 <br />TOTALS <br />1010 <br />0.89 1 14% <br />152 <br />SPECIFIC <br />NOTES: <br />/r� <br />1. TOTAL SUPPLYAIR AT CONDITION ANALYZED USES THE MAXIMUM AIRFLOW PROVIDED TO THE ZONE DURING THE HEATING OR COOLING MODE, WHICHEVER IS BEING ANALYZED. <br />� / � <br />V/� <br />2. SYSTEM VENTILATION EFFICIENCY IS EQUAL TO THE LOWEST ZONE VENTILATION EFFICIENCY OF ALL ROOMS SERVED BY THE UNIT. <br />Unit Outside Airflow Balance Setpoint [cfm] <br />155 <br />\� <br />3. SEE UNIT EQUIPMENT SCHEDULE FOR ACTUAL OUTSIDE AIR SETPOINT FOR BALANCING; WHICH WILL MEET OR EXCEED THE MINIMUM REQUIREMENT NOTED HEREIN. <br />Unit Meets IMC Requirements <br />Yes <br />C:W <br />3 <br />T�I <br />O <br />IMC 2021 ENTILATION RATE PROCEDURE CALCULATIONS <br />V <br />OCCUPANT <br />OCCUPANT <br />BREATHING <br />TABLE6-2ZONE <br />TOTAL SUPPLY <br />SYSTEM <br />OUTDOOR <br />AREA <br />DENSITY <br />OVER -VENTILATION <br />ZONE <br />AIR <br />AIRTOZONEAT <br />ZONE <br />VENTILATION <br />MINIMUM <br />MINIMUM <br />UNIT <br />FLOOR <br />ROOM <br />ROOM NAME <br />ZONE TYPE <br />AREA <br />AIRFLOW <br />OUTDOOR <br />PEOPLE <br />OCCUPANT <br />PERCENTAGE <br />OUTDOOR <br />DISTRIBUTION <br />CONDITION <br />VENTILATION <br />EFFICIENCY <br />PERCENTAGE <br />OUTSIDEAIRFLOW <br />NUMBER <br />SO FT <br />RATE <br />AIRFLOW RATE <br />PER 1000 <br />QUANTITY <br />AIRFLOW RATE <br />EFFECTIVENESS <br />ANALYZED <br />EFFICIENCY <br />NOTE 2 <br />AIRFLOW AT <br />AT UNIT <br />W <br />CFM/PER <br />CFM/SQ FT <br />SO FT <br />CFM <br />(Ez) <br />CFM - NOTE 1 <br />(Evz) <br />(Ev) <br />UNIT <br />NOTE 3 <br />to <br />FCU - <br />3 <br />106A <br />MEDIUM CONFERENCE <br />Conference/meeting <br />151 <br />5.0 <br />0.06 <br />50 <br />8 <br />0% <br />47 <br />0.8 <br />350 <br />0.91 <br />0.91 <br />LL > <br />100 <br />WELCOME <br />Main entry lobbies <br />3" <br />5.0 <br />0.06 <br />10 <br />3 <br />0% <br />38 <br />0.8 <br />720 <br />1.01 <br />0.91 <br />- <br />- <br />Q <br />O <br />FCU-3 TOTALS <br />SPECIFIC NOTES: <br />1070 <br />_ 0.91 1 9% 1 <br />93 <br />N <br />ra � <br />W MM <br />m W � <br />1. TOTAL SUPPLYAIR AT CONDITION ANALYZED USES THE MAXIMUM AIRFLOW PROVIDED TO THE ZONE DURING THE HEATING OR COOLING MODE, WHICHEVER IS BEING ANALYZED. <br />2 <br />UI <br />2. SYSTEM VENTILATION EFFICIENCY IS EQUAL TO THE LOWEST ZONE VENTILATION EFFICIENCY OF ALL ROOMS SERVED BY THE UNIT. <br />Unit Outside Airflow Balance Setpoint [cfm] <br />95 <br />TN Professmnal An hheers seal eMd ro thls sheet <br />pp ies only to the material and it.... hown on this <br />Q <br />sheet All drawings,in-nn-torotherdocuments rot <br />3. SEE UNIT EQUIPMENT SCHEDULE FORACTUAL OUTSIDE AIR SETPOINT FOR BALANCING; WHICH WILL MEET OR EXCEEDTHE MINIMUM REQUIREMENT NOTED HEREIN. <br />Unit Meets IMC Requirements <br />q <br />Yes <br />eAlbitiNthissealshall notbeconsideredprepared by <br />mreaim miaarchitect any <br />pans <br />n., il.Ndisclaims <br />and all b hi for such plans, dawings or <br />W <br />dowments not exhibiting rhls seal. <br />nt, w <br />W <br />N <br />3 IMC 2021 ENTILATION RATE PROCEDURE CALCULATIONS <br />Thia dawmgandd¢tnilson rare the sole property of me <br />WI <br />architect and may be used for this specific protect only. <br />It shall not be loaned, copied or reproduced, in whole or <br />TOTAL SUPPLY <br />SYSTEM <br />pattnn rang o[herpurpose orprolect withoN the <br />me <br />OCCUPANT <br />OCCUPANT <br />BREATHING <br />TABLE6-2 ZONE <br />carmen consent of ercnnect. <br />g <br />OUTDOOR <br />AREA <br />DENSITY <br />OVER -VENTILATION <br />ZONE <br />AIR <br />AIRTOZONEAT <br />ZONE <br />VENTILATION <br />MINIMUM <br />MINIMUM <br />No. DescriptionDate <br />UNIT <br />FLOOR <br />ROOM <br />ROOM NAME <br />ZONE TYPE <br />AREA <br />AIRFLOW <br />OUTDOOR <br />PEOPLE <br />OCCUPANT <br />PERCENTAGE <br />OUTDOOR <br />DISTRIBUTION <br />CONDITION <br />VENTILATION <br />EFFICIENCY <br />PERCENTAGE OUTSIDEAIRFLOW <br />1 Revision 1 Dale 1 <br />2 <br />FOR CONSTRUCTION <br />07/11/2024 <br />w <br />NUMBER <br />SO FT <br />RATE <br />AIRFLOW RATE <br />PER 1000 <br />QUANTITY <br />AIRFLOW RATE EFFECTIVENESS <br />ANALYZED <br />EFFICIENCY <br />NOTE 2 <br />AIRFLOW AT <br />AT UNIT <br />3 <br />MECH PERMIT <br />07124/2024 <br />CFM/PER <br />CFM/SO FT <br />SO FT <br />CFM <br />(Ez) <br />CFM - NOTE 1 <br />(Evz) <br />(Ev) <br />UNIT <br />NOTE 3 <br />aSb-ue <br />FCU-4 <br />106B <br />LARGE CONFERENCE <br />Conference/meeting <br />241 <br />5.0 <br />0.06 <br />50 <br />12 <br />0% <br />75 <br />0.8 <br />430 <br />0.96 <br />0.96 <br />- <br />- <br />m <br />FCU-4 TOTALS 1 <br />7e <br />MECHANICAL <br />430 <br />0.96 18% 1 <br />SCHEDULES <br />SCHEDULE S <br />SPECIFIC NOTES: <br />3 <br />1. TOTAL SUPPLYAIR AT CONDITION ANALYZED USES THE MAXIMUM AIRFLOW PROVIDED TO THE ZONE DURING THE HEATING OR COOLING MODE, WHICHEVER IS BEING ANALYZED. <br />W <br />Prged Number'. Sheet Number'. <br />2. SYSTEM VENTILATION EFFICIENCY IS EQUAL TO THE LOWEST ZONE VENTILATION EFFICIENCY OF ALL ROOMS SERVED BY THE UNIT. <br />Unit Outside Airflow Balance Setpoint [cfm] <br />80 <br />2024906.011 <br />o <br />D.- sy <br />3. SEE UNIT EQUIPMENT SCHEDULE FOR ACTUAL OUTSIDE AIR SETPOINT FOR BALANCING; WHICH WILL MEET OR EXCEED THE MINIMUM REQUIREMENT NOTED HEREIN. <br />Unit Meets IMC Requirements <br />Yes <br />MSK <br />0T <br />lases D. <br />MARCH 27, 2024 <br />