My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10521 19TH AVE SE EDWARD JONES 2025-10-27
>
Address Records
>
19TH AVE SE
>
10521
>
EDWARD JONES
>
10521 19TH AVE SE EDWARD JONES 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:17:17 AM
Creation date
12/12/2024 10:10:31 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10521
Tenant Name
EDWARD JONES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
LAWRENCE <br />3 IMC 2021 ENTILATION RATE PROCEDURE CALCULATIONSc <br />''�ry`1'��` <br />GROUP <br />OCCUPANT <br />OCCUPANT <br />BREATHING <br />TABLE6-2ZONE <br />TOTALSUPPLY <br />SYSTEM <br />St. Louis <br />OUTDOOR <br />AREA <br />DENSITY <br />OVER -VENTILATION <br />ZONE <br />AIR <br />AIRTOZONEAT <br />ZONE <br />VENTILATION <br />MINIMUM <br />MINIMUM <br />319 North 4th Street <br />UNIT <br />FLOOR <br />ROOM <br />ROOM NAME <br />ZONE TYPE <br />AREA <br />AIRFLOW <br />OUTDOOR <br />PEOPLE <br />OCCUPANT <br />PERCENTAGE <br />OUTDOOR <br />DISTRIBUTION <br />CONDITION <br />VENTILATION <br />EFFICIENCY <br />PERCENTAGE OUTSIDEAIRFLOW <br />suite 1000 <br />NUMBER <br />SO FT <br />RATE <br />AIRFLOW RATE <br />PER 1000 <br />QUANTITY <br />AIRFLOW RATE <br />EFFECTIVENESS <br />ANALYZED <br />EFFICIENCY <br />NOTE 2 <br />AIRFLOW AT <br />AT UNIT <br />St. Louis, Missouri 63102 <br />(314)231-5700 <br />CFM/PER <br />CFM/SO FT <br />SO FT <br />CFM <br />(Ez) <br />CFM - NOTE 1 <br />(Evz) <br />(Ev) <br />UNIT <br />NOTE 3 <br />FCU - 1 <br />1st <br />107 <br />BREAK <br />Break rooms <br />155 <br />5.0 <br />0.06 <br />25 <br />4 <br />0% <br />29 <br />0.8 <br />640 <br />0.99 <br />0.83 <br />- <br />- <br />pmjauT¢am <br />1st <br />106C <br />SMALL CONFERENCE <br />Conference/meeting <br />84 <br />5.0 <br />0.06 <br />50 <br />4 <br />0% <br />26 <br />0.8 <br />180 <br />0.87 <br />0.83 <br />- <br />_ <br />GENERAL CONTRACTOR: <br />To Be Determined <br />let <br />106D <br />SMALL CONFERENCE <br />Conference/meeting <br />81 <br />5.0 <br />0.06 <br />50 <br />4 <br />0% <br />25 <br />0.8 <br />140 <br />0.83 <br />0.83 <br />- <br />- <br />1st <br />103 <br />PASSAGE <br />Corridors <br />166 <br />0.0 <br />0.06 <br />0 <br />0 <br />0% <br />10 <br />0.8 <br />840 <br />1.04 <br />0.83 <br />- <br />- <br />FCU - 1 TOTALS <br />1800 <br />0.83 5 % <br />109 <br />SPECIFIC NOTES: <br />PROFESSIONAL ENGINEER: <br />1. TOTAL SUPPLY AIR AT CONDITION ANALYZED USES THE MAXIMUM AIRFLOW PROVIDED TO THE ZONE DURING THE HEATING OR COOLING MODE, WHICHEVER IS BEING ANALYZED. <br />2. SYSTEM VENTILATION EFFICIENCY IS EQUAL TO THE LOWEST ZONE VENTILATION EFFICIENCY OF ALL ROOMS SERVED BY THE UNIT. <br />Unit Outside Airflow Balance Setpoint [tm] <br />110 <br />NMEG <br />3. SEE UNIT EQUIPMENT SCHEDULE FOR ACTUAL OUTSIDE AIR SETPOINT FOR BALANCING; WHICH WILL MEET OR EXCEED THE MINIMUM REQUIREMENT NOTED HEREIN. <br />Unit Meets IMC Requirements <br />Yes <br />IMEG <br />7600 E Orchard Road, Suite 250-S <br />Greenwood Village, CO 80111 <br />3 IMC 2021 ENTILATION RATE PROCEDURE CALCULATIONS <br />Pone 303.796.6000 <br />MhEG Project No: 24000280.07 <br />OCCUPANT <br />OCCUPANT <br />BREATHING <br />TABLE6-2 ZONE <br />TOTAL SUPPLY <br />SYSTEM <br />P-ssl°rol scar <br />OUTDOOR <br />AREA <br />DENSITY <br />OVER -VENTILATION <br />ZONE <br />AIR <br />AIRTOZONEAT <br />ZONE <br />VENTILATION <br />MINIMUM <br />MINIMUM <br />...E <br />OF I ... <br />UNIT <br />FLOOR <br />ROOM <br />ROOM NAME <br />ZONE TYPE <br />AREA <br />AIRFLOW <br />OUTDOOR <br />PEOPLE <br />OCCUPANT <br />PERCENTAGE <br />OUTDOOR <br />DISTRIBUTION <br />CONDITION <br />VENTILATION <br />EFFICIENCY <br />PERCENTAGE <br />OUTSIDEAIRFLOW <br />qh <br />w <br />NUMBER <br />SO FT <br />RATE <br />AIRFLOW RATE <br />PER 1000 <br />QUANTITY <br />AIRFLOW RATE <br />EFFECTIVENESS <br />ANALYZED <br />EFFICIENCY <br />NOTE 2 <br />AIRFLOW AT <br />AT UNIT <br />CFM/PER <br />CFM/SQ FT <br />SO FT <br />CFM <br />(Ez) <br />CFM - NOTE 1 <br />(Evz) <br />(Ev) <br />UNIT <br />NOTE 3 <br />c` <br />ss8 �taT r.E°G� <br />70NAL <br />F-� <br />FCU-2 <br />106A <br />BRANCH SUPPORT <br />Office space <br />224 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />19 <br />0.8 <br />175 <br />0.99 <br />0.89 <br />102A <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />0.93 <br />0.89 <br />- <br />- <br />ACV 97 1'9 a-od-6 <br />102B <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />0.93 <br />0.89 <br />- <br />- <br />102C <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />1 0.93 <br />0.89 <br />- <br />- <br />102D <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />0.93 <br />0.89 <br />- <br />- <br />102E <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />0.93 <br />0.89 <br />- <br />- <br />102F <br />OFFICE <br />Office space <br />64 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />9 <br />0.8 <br />55 <br />0.93 <br />0.89 <br />- <br />- <br />poi¢°iTm¢: <br />101E <br />BRANCH SUPPORT <br />Office space <br />190 <br />5.0 <br />0.06 <br />5 <br />1 <br />0% <br />16 <br />0.8 <br />155 <br />1.00 <br />0.89 <br />- <br />- <br />o0 <br />103 <br />PASSAGE <br />Corridors <br />434 <br />0.0 <br />0.06 <br />0 <br />0 <br />0% <br />26 <br />0.8 <br />235 <br />0.99 <br />0.89 <br />- <br />- <br />0 <br />cV <br />CO <br />104 <br />EQUIP/SUPPLY <br />Occupiable storage rooms for dry materials <br />85 <br />5.0 <br />0.06 <br />2 <br />0 <br />0% <br />6 <br />0.8 <br />70 <br />1.02 <br />0.89 <br />- <br />- <br />Q <br />108 <br />STORAGE <br />Storage rooms <br />78 <br />0.0 <br />0.12 <br />0 <br />0 <br />0% <br />9 <br />0.8 <br />50 <br />0.89 <br />0.89 <br />- <br />- <br />N <br />109 <br />LOUNGE <br />Office space <br />68 <br />5.0 <br />0.06 <br />5 <br />0 <br />0% <br />6 <br />0.8 <br />55 <br />1.00 <br />0.89 <br />- <br />- <br />W <br />FCU-2 <br />TOTALS <br />1010 <br />0.89 1 14% <br />152 <br />SPECIFIC <br />NOTES: <br />/r� <br />1. TOTAL SUPPLYAIR AT CONDITION ANALYZED USES THE MAXIMUM AIRFLOW PROVIDED TO THE ZONE DURING THE HEATING OR COOLING MODE, WHICHEVER IS BEING ANALYZED. <br />� / � <br />V/� <br />2. SYSTEM VENTILATION EFFICIENCY IS EQUAL TO THE LOWEST ZONE VENTILATION EFFICIENCY OF ALL ROOMS SERVED BY THE UNIT. <br />Unit Outside Airflow Balance Setpoint [cfm] <br />155 <br />\� <br />3. SEE UNIT EQUIPMENT SCHEDULE FOR ACTUAL OUTSIDE AIR SETPOINT FOR BALANCING; WHICH WILL MEET OR EXCEED THE MINIMUM REQUIREMENT NOTED HEREIN. <br />Unit Meets IMC Requirements <br />Yes <br />C:W <br />3 <br />T�I <br />O <br />IMC 2021 ENTILATION RATE PROCEDURE CALCULATIONS <br />V <br />OCCUPANT <br />OCCUPANT <br />BREATHING <br />TABLE6-2ZONE <br />TOTAL SUPPLY <br />SYSTEM <br />OUTDOOR <br />AREA <br />DENSITY <br />OVER -VENTILATION <br />ZONE <br />AIR <br />AIRTOZONEAT <br />ZONE <br />VENTILATION <br />MINIMUM <br />MINIMUM <br />UNIT <br />FLOOR <br />ROOM <br />ROOM NAME <br />ZONE TYPE <br />AREA <br />AIRFLOW <br />OUTDOOR <br />PEOPLE <br />OCCUPANT <br />PERCENTAGE <br />OUTDOOR <br />DISTRIBUTION <br />CONDITION <br />VENTILATION <br />EFFICIENCY <br />PERCENTAGE <br />OUTSIDEAIRFLOW <br />NUMBER <br />SO FT <br />RATE <br />AIRFLOW RATE <br />PER 1000 <br />QUANTITY <br />AIRFLOW RATE <br />EFFECTIVENESS <br />ANALYZED <br />EFFICIENCY <br />NOTE 2 <br />AIRFLOW AT <br />AT UNIT <br />W <br />CFM/PER <br />CFM/SQ FT <br />SO FT <br />CFM <br />(Ez) <br />CFM - NOTE 1 <br />(Evz) <br />(Ev) <br />UNIT <br />NOTE 3 <br />to <br />FCU - <br />3 <br />106A <br />MEDIUM CONFERENCE <br />Conference/meeting <br />151 <br />5.0 <br />0.06 <br />50 <br />8 <br />0% <br />47 <br />0.8 <br />350 <br />0.91 <br />0.91 <br />LL > <br />100 <br />WELCOME <br />Main entry lobbies <br />3" <br />5.0 <br />0.06 <br />10 <br />3 <br />0% <br />38 <br />0.8 <br />720 <br />1.01 <br />0.91 <br />- <br />- <br />Q <br />O <br />FCU-3 TOTALS <br />SPECIFIC NOTES: <br />1070 <br />_ 0.91 1 9% 1 <br />93 <br />N <br />ra � <br />W MM <br />m W � <br />1. TOTAL SUPPLYAIR AT CONDITION ANALYZED USES THE MAXIMUM AIRFLOW PROVIDED TO THE ZONE DURING THE HEATING OR COOLING MODE, WHICHEVER IS BEING ANALYZED. <br />2 <br />UI <br />2. SYSTEM VENTILATION EFFICIENCY IS EQUAL TO THE LOWEST ZONE VENTILATION EFFICIENCY OF ALL ROOMS SERVED BY THE UNIT. <br />Unit Outside Airflow Balance Setpoint [cfm] <br />95 <br />TN Professmnal An hheers seal eMd ro thls sheet <br />pp ies only to the material and it.... hown on this <br />Q <br />sheet All drawings,in-nn-torotherdocuments rot <br />3. SEE UNIT EQUIPMENT SCHEDULE FORACTUAL OUTSIDE AIR SETPOINT FOR BALANCING; WHICH WILL MEET OR EXCEEDTHE MINIMUM REQUIREMENT NOTED HEREIN. <br />Unit Meets IMC Requirements <br />q <br />Yes <br />eAlbitiNthissealshall notbeconsideredprepared by <br />mreaim miaarchitect any <br />pans <br />n., il.Ndisclaims <br />and all b hi for such plans, dawings or <br />W <br />dowments not exhibiting rhls seal. <br />nt, w <br />W <br />N <br />3 IMC 2021 ENTILATION RATE PROCEDURE CALCULATIONS <br />Thia dawmgandd¢tnilson rare the sole property of me <br />WI <br />architect and may be used for this specific protect only. <br />It shall not be loaned, copied or reproduced, in whole or <br />TOTAL SUPPLY <br />SYSTEM <br />pattnn rang o[herpurpose orprolect withoN the <br />me <br />OCCUPANT <br />OCCUPANT <br />BREATHING <br />TABLE6-2 ZONE <br />carmen consent of ercnnect. <br />g <br />OUTDOOR <br />AREA <br />DENSITY <br />OVER -VENTILATION <br />ZONE <br />AIR <br />AIRTOZONEAT <br />ZONE <br />VENTILATION <br />MINIMUM <br />MINIMUM <br />No. DescriptionDate <br />UNIT <br />FLOOR <br />ROOM <br />ROOM NAME <br />ZONE TYPE <br />AREA <br />AIRFLOW <br />OUTDOOR <br />PEOPLE <br />OCCUPANT <br />PERCENTAGE <br />OUTDOOR <br />DISTRIBUTION <br />CONDITION <br />VENTILATION <br />EFFICIENCY <br />PERCENTAGE OUTSIDEAIRFLOW <br />1 Revision 1 Dale 1 <br />2 <br />FOR CONSTRUCTION <br />07/11/2024 <br />w <br />NUMBER <br />SO FT <br />RATE <br />AIRFLOW RATE <br />PER 1000 <br />QUANTITY <br />AIRFLOW RATE EFFECTIVENESS <br />ANALYZED <br />EFFICIENCY <br />NOTE 2 <br />AIRFLOW AT <br />AT UNIT <br />3 <br />MECH PERMIT <br />07124/2024 <br />CFM/PER <br />CFM/SO FT <br />SO FT <br />CFM <br />(Ez) <br />CFM - NOTE 1 <br />(Evz) <br />(Ev) <br />UNIT <br />NOTE 3 <br />aSb-ue <br />FCU-4 <br />106B <br />LARGE CONFERENCE <br />Conference/meeting <br />241 <br />5.0 <br />0.06 <br />50 <br />12 <br />0% <br />75 <br />0.8 <br />430 <br />0.96 <br />0.96 <br />- <br />- <br />m <br />FCU-4 TOTALS 1 <br />7e <br />MECHANICAL <br />430 <br />0.96 18% 1 <br />SCHEDULES <br />SCHEDULE S <br />SPECIFIC NOTES: <br />3 <br />1. TOTAL SUPPLYAIR AT CONDITION ANALYZED USES THE MAXIMUM AIRFLOW PROVIDED TO THE ZONE DURING THE HEATING OR COOLING MODE, WHICHEVER IS BEING ANALYZED. <br />W <br />Prged Number'. Sheet Number'. <br />2. SYSTEM VENTILATION EFFICIENCY IS EQUAL TO THE LOWEST ZONE VENTILATION EFFICIENCY OF ALL ROOMS SERVED BY THE UNIT. <br />Unit Outside Airflow Balance Setpoint [cfm] <br />80 <br />2024906.011 <br />o <br />D.- sy <br />3. SEE UNIT EQUIPMENT SCHEDULE FOR ACTUAL OUTSIDE AIR SETPOINT FOR BALANCING; WHICH WILL MEET OR EXCEED THE MINIMUM REQUIREMENT NOTED HEREIN. <br />Unit Meets IMC Requirements <br />Yes <br />MSK <br />0T <br />lases D. <br />MARCH 27, 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.