My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10521 19TH AVE SE EDWARD JONES 2025-10-27
>
Address Records
>
19TH AVE SE
>
10521
>
EDWARD JONES
>
10521 19TH AVE SE EDWARD JONES 2025-10-27
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/27/2025 9:17:17 AM
Creation date
12/12/2024 10:10:31 AM
Metadata
Fields
Template:
Address Document
Street Name
19TH AVE SE
Street Number
10521
Tenant Name
EDWARD JONES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
254
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SHEET NOTES - PLUMBING: <br />A. CONTRACTOR SHALL NOTIFY ENGINEER OF ANY DISCREPANCIES IN EXISTING CONDITIONS. <br />B. ALL FIRE PROTECTION WORK SHALL BE DONE IN ACCORDANCE WITH NFPA 13 AND LOCAL <br />CODES. <br />C. RELOCATE EXISTING FIRE SPRINKLER HEADS INTO CEILING GRID AS PERMITTED BY NFPA 13 <br />6.2.1.1. FIRE SPRINKLER HEADS ARE PERMITTED TO BE RELOCATED IF THEY ARE ATTACHED <br />TO THEIR ORIGINAL FITTING OR WELDED OUTLET; THIS INCLUDES FLEXIBLE HOSES. FIRE <br />PROTECTION CONTRACTOR TO PROVIDE PIPING, FITTINGS, AND NEW SPRINKLER HEADS AS <br />NECESSARY. EQUIPMENT TO MATCH EXISTING BUILDING STANDARD. FIRE PROTECTION <br />CONTRACTOR TO VERIFY FIRE SPRINKLER HEAD LOCATION WITH ARCHITECT, FURNITURE, <br />LIGHTING AND HVAC EQUIPMENT. FIRE SPRINKLER HEADS GENERALLY TO BE LOCATED IN <br />CENTER OF CEILING TILE. <br />D. ALL SPRINKLER HEADS SHALL MATCH EXISTING BUILDING STANDARD. <br />KEYNOTES <br />1 CONNECT NEW 3/4" CW PIPING TO EXISTING CW PIPING OF EQUAL OR LARGER SIZE. PROVIDE <br />ISOLATION VALVE AT POINT OF CONNECTION. CONTRACTOR SHALL FIELD VERIFY EXACT POINT OF <br />CONNECTION. <br />2 PROVIDE 1/2" CW PIPING DOWN IN WALL TO NEW OUTLET BOX, OB-#, FOR CONNECTION TO <br />REFRIGERATOR. COORDINATE OUTLET BOX ELEVATION AND FINAL PIPING FROM OUTLET BOX TO <br />APPLIANCE WITH ARCHITECT. REFER TO PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FOR <br />MORE INFORMATION. <br />3 PROVIDE NEW SUSPENDED ELECTRIC WATER HEATER, EWH-#. REFER TO WATER HEATER DETAIL <br />AND SCHEDULE FOR MORE INFORMATION. <br />4 PROVIDE 1/2" HW PIPING DOWN IN WALL TO OUTLET BOX, OB-#, FOR CONNECTION TO DISHWASHER. <br />ROUTE DRAIN FROM DISHWASHER TO DISHWASHER DRAIN CONNECTION AT GARBAGE DISPOSAL. <br />COORDINATE OUTLET BOX ELEVATION WITH ARCHITECT. REFER TO DISHWASHER/GARBAGE <br />DISPOSAL CONNECTION DETAIL AND PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FOR MORE <br />INFORMATION. <br />5 PROVIDE OUTLET BOX, OB-#, FOR WATER HEATER DRAIN AND CONDENSATE DRAINS FROM FAN <br />COIL UNITS. REFER TO PLUMBING FIXTURE AND EQUIPMENT SCHEDULE FOR MORE INFORMATION. <br />6 ROUTE 1/2" CW AND HW PIPING DOWN IN WALL TO SERVE SINK, SK-#. INSTALL GARBAGE DISPOSAL, <br />GD-#, IN CONJUNCTION WITH SINK. REFER TO MIXING VALVE DETAIL AND PLUMBING FIXTURE AND <br />EQUIPMENT SCHEDULE FOR MORE INFORMATION. <br />7 PROVIDE 3/4" CONDENSATE DRAIN PIPING FROM FAN COIL UNIT IN ACCORDANCE WITH <br />MANUFACTURER'S INSTRUCTIONS. TYPICAL. <br />8 ROUTE COMBINED 1" CONDENSATE DRAIN PIPING TO OUTLET BOX OB-21N BREAK ROOM. <br />TERMINATE WITH MINIMUM 1" AIR GAP FITTING. <br />9 ROUTE 3/4" CONDENSATE DRAIN PIPING FROM BRANCH CONTROLLER AS INDICATED. CONNECT TO <br />BRANCH CONTROLLER IN ACCORDANCE WITH MANUFACTURER'S INSTRUCTIONS. <br />10 CONTRACTOR SHALL PROVIDE SUBMETER FOR CW PIPING SERVING SUITE. COORDINATE WITH <br />LANDLORD REGARDING SPECIFICATION FOR SUBMETER. <br />A�)PLUMBING PLAN <br />T1 1 /4,. - l -0. <br />T <br />�I,blc LAWRENCE <br />GROUP <br />$t. LOui8 <br />319 North 4th Street <br />Suite 1000 <br />St. Louis, Missouri 63102 <br />(314)231-5700 <br />Pm—.m <br />GENERAL CONTRACTOR: <br />To Be Determined <br />PROFESSIONAL ENGINEER: <br /><>IMEG <br />IMEG <br />7600 E Orchard Road, Suite 250-S <br />Greenwood Village, CO 80111 <br />Phone: 303.796.6000 <br />IMEG Project No: 24000280.07 <br />E <br />Qw ' <br />6'hf �taT 1l <br />•t�G <br />�ONAt F� <br />Af. 97, 10. 2 od 6 <br />W <br />N <br />N <br />ILL <br />N <br />CD <br />Q <br />0 —0 <br />� <br />L <br />� �O <br />I I I <br />00 <br />N <br />m W <br />(� <br />The Professional Architect's seal of hed to this sheet <br />applies only to the material and items shmn on this <br />sheet. All drewings, trotherdocuments <br />rot <br />rg eAibilithis seal shallnot be considered prepared by <br />thin arobite end this architect expressy disclaims airy <br />o <br />and all rte not b,hi for such plans, drawings or <br />dowments not exhibiting this we. <br />This lowing and details on it are the sole property of the <br />architect end may be uwd for this specific project only. <br />It shall not be loaned, copied or reproduced, in whole or <br />part or for any other purpose or project withoN the <br />written consent of the enTf-. <br />No. Description Date <br />1 evision 1 RDale 1 <br />2 FOR CONSTRUCTION 07/11/2024 <br />3 MECH PERMIT 07124/2024 <br />Sheaf TitlE <br />PLUMBING PLAN <br />Projed Number Sbeet Number. <br />2024906.011 <br />D.- Sy <br />MSK <br />Issas D. <br />MARCH 27, 2024 <br />
The URL can be used to link to this page
Your browser does not support the video tag.