VIEW KEY
<br />NAME LEVEL NAME
<br />� INDICATES NOTE USED TO DESCRIBE
<br />�HEIGHTABOVE
<br />ADDITIONAL INFORMATIONABOUT
<br />PROJECT U-0"
<br />WORK REQUIRED, SPECIFIC TO THE
<br />SHEET AND/OR DETAIL
<br />INDICATES DIRECTION OF TRUE NORTH
<br />PLAN OR DETAIL NUMBER
<br />PLAN OR DETAIL NAME
<br />�\ VIEW NAME
<br />PLAN OR DETAIL SCALE
<br />FOR
<br />S�
<br />INDICATES SIMILAR DETAIL REFERENCED
<br />Sim 'I- IN MULTIPLE LOCATIONS SIM
<br />DETAIL REFERRED TO BY SECTION CUT 1
<br />1 4 2
<br />3
<br />M101 SHEET DETAIL IS LOCATED ON T101
<br />LINE TYPE AND TAG KEY:
<br />NEW WORK BY THIS CONTRACTOR (WIDE LINE)
<br />NEW
<br />EXISTING TO BE REMOVED (SHORT DASHED PATTERN)
<br />'-------NEW UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
<br />EXISTING TO REMAIN OR WORK BY OTHERS (NARROW LINE)
<br />EXISTING
<br />EXISTING TO BE REMOVED BY OTHERS (SHORT DASHED PATTERN)
<br />EXISTING UNDERFLOOR OR UNDERGROUND (LONG DASHED PATTERN)
<br />HALFTONING DOES NOT MODIFY SCOPE.
<br />TAG'-E TAGS WITH DASH 'EINDICATES THE REFERENCED OBJECT IS EXISTING
<br />TAG-1 UNDERLINED TAG INDICATES OBJECT IS IN -SCOPE. IF NEW, ADDITIONAL
<br />INFORMATION IS AVAILABLE IN A SCHEDULE, MATERIAL LIST, OR SYMBOL LIST
<br />INDICATES AN EXISTING SYSTEM'S POINT OF CONNECTION/REMOVAL
<br />A
<br />CONTRACTOR ABBREVIATION KEY
<br />ABBR:
<br />DESCRIPTION:
<br />A.T.C.
<br />ASBESTOS ABATEMENT CONTRACTOR
<br />C.M.
<br />CONSTRUCTION MANAGER
<br />E.C.
<br />ELECTRICAL CONTRACTOR
<br />F.P.C.
<br />FIRE PROTECTION CONTRACTOR
<br />G.C.
<br />GENERAL CONTRACTOR
<br />M.C.
<br />MECHANICAL CONTRACTOR
<br />P.C.
<br />PLUMBING CONTRACTOR
<br />T.C.C.
<br />TEMPERATURE CONTROLS CONTRACTOR
<br />MECHANICAL ABBREVIATION KEY
<br />ABBR:
<br />DESCRIPTION:
<br />ACCESS DOOR
<br />AD
<br />AFF
<br />ABOVE FINISHED FLOOR
<br />C
<br />COMMON
<br />CO
<br />CLEANOUT
<br />CD-E
<br />CEILING DIFFUSER - EXISTING
<br />CFSD
<br />CONTROLIFIREISMOKE DAMPER
<br />DPG (0-T)
<br />DIFFERENTIAL PRESSURE GAUGE (RANGE)
<br />DPS
<br />DIFFERENTIAL PRESSURE SWITCH
<br />EA
<br />EXHAUST/RELIEF AIR
<br />ECFSD
<br />EXISTING CONTROL FIRE SMOKE DAMPER
<br />EFD
<br />EXISTING FIRE DAMPER
<br />EFSD
<br />EXISTING FIRE SMOKE DAMPER
<br />EP
<br />ELECTRICAL TO PNEUMATIC VALVE
<br />ESD
<br />EXISTING SMOKE DAMPER
<br />FD
<br />FIRE DAMPER
<br />FOB
<br />FLATONBOTTOM
<br />FOT
<br />FLAT ON TOP
<br />FSD
<br />FIREISMOKE DAMPER
<br />MA
<br />MIXEDAIR
<br />MV
<br />MIXING VALVE
<br />NC
<br />NEW CONNECTION
<br />N.C.
<br />NORMALLY CLOSED
<br />NIC
<br />NOT IN CONTRACT
<br />N.O.
<br />NORMALLY OPEN
<br />CA
<br />OUTSIDE AIR
<br />PS
<br />PRESSURE SWITCH
<br />RA
<br />RETURN AIR
<br />SA
<br />SUPPLY AIR
<br />SO
<br />SMOKE DAMPER
<br />TAB
<br />TERMINAL AIR BOX
<br />TO
<br />TRANSFER DUCT
<br />TYP
<br />TYPICAL
<br />UC-1
<br />DOOR UNDERCUT BY OTHERS (V TYPICAL)
<br />UNO
<br />UNLESS NOTED OTHERWISE
<br />MECHANICAL SYMBOL LIST
<br />NOT ALL SYMBOLS MAY APPLY.
<br />SYMBOL:
<br />DESCRIPTION:
<br />-CR-
<br />CONDENSER WATER RETURN
<br />-CS-
<br />CONDENSER WATER SUPPLY
<br />-CWR-
<br />CHILLED WATER RETURN
<br />-CWS-
<br />CHILLED WATER SUPPLY
<br />D
<br />DRAIN
<br />-G-
<br />NATURAL GAS
<br />-HWR-
<br />HEATING WATER RETURN
<br />-HWS-
<br />HEATING WATER SUPPLY
<br />PIPE CAP
<br />--------- a
<br />O
<br />PIPE DOWN
<br />PIPE UP OR UP/DOWN
<br />r_
<br />PITCH PIPE IN DIRECTION
<br />DIRECTION OF FLOW IN PIPE
<br />NEW CONNECTION
<br />DIELECTRIC CONNECTION
<br />UNION/FLANGE
<br />SHUTOFF VALVE NORMALLY OPEN
<br />SHUTOFF VALVE NORMALLY CLOSED
<br />pp
<br />THROTTLING VALVE
<br />BALANCING VALVE (NUMBER INDICATES GPM)
<br />AUTOMATIC BALANCING VALVE
<br />1�
<br />MIXING VALVE
<br />CONTROL VALVE (THREE-WAY)
<br />CONTROL VALVE (TWO-WAY)
<br />I
<br />SOLENOID VALVE
<br />CHECK VALVE
<br />METER
<br />DIRECTION OF AIR FLOW
<br />FLEXIBLE DUCT
<br />MANUAL VOLUME DAMPER
<br />RISE IN DIRECTION OF AIR FLOW
<br />DROP IN DIRECTION OF AIR FLOW
<br />DUCTCAP
<br />DUCT DOWN
<br />DUCTUP
<br />SUPPLY/OUTSIDE AIR DUCT SECTION
<br />p �
<br />�}
<br />®
<br />ZRETURN
<br />AIR DUCT SECTION
<br />®
<br />EXHAUST/RELIEF AIR DUCT SECTION
<br />®
<br />4-WAY DIFFUSER WITH BLANKOFF IN ONE DIRECTION
<br />CDA
<br />AIR TERMINAL PROPERTIES SYMBOL
<br />NECK SIZEICFM
<br />�61115
<br />y I ®
<br />TERMINAL AIR BOX (REFER TO SCHEDULE)
<br />®
<br />TERMINAL AIR BOX WR2EHEAT COIL (REFER TO SCHEDULE)
<br />FAN AIR BOX wIREHEAT COIL
<br />TO SCHEDULE)
<br />(REFER TO SCHEDULE)
<br />(REFER
<br />OPPOSED BLADE DAMPER (REFER TO SCHEDULE)
<br />®
<br />PARALLEL BLADE DAMPER (REFER TO SCHEDULE)
<br />®
<br />HO
<br />HUMIDISTAT SENSOR
<br />HUMIDISTAT I SENSOR
<br />©
<br />CARBON MONOXIDE SENSOR
<br />©
<br />CARBON DIOXIDE SENSOR
<br />2
<br />OO
<br />OCCUPANCVSENSOR
<br />V
<br />PRESSURE SENSOR/MONITOR
<br />©
<br />PRESSURE SENSOR (DUCT MOUNTED)
<br />0
<br />THERMOSTAT/SENSOR
<br />O
<br />TEMPERATURE SENSOR
<br />CONTACT PERSONS:
<br />DESCRIPTION:
<br />PERSON:
<br />PROJECT MANAGER
<br />ASHLEE DOWNHAM
<br />MECHANICAL
<br />ANDY NACHTRAB
<br />ELECTRICAL
<br />ASHLEE DOWNHAM
<br />MECHANICAL GENERAL NOTES:
<br />THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
<br />TO, VENTILATION AND TEMPERATURE CONTROL.
<br />1. DRAWINGS SHOWING LOCATIONS OF EQUIPMENT, DUCTWORK, PIPING, ETC. ARE
<br />DIAGRAMMATIC AND MAY NOT ALWAYS REFLECT EXACT INSTALLATION CONDITIONS.
<br />DRAWINGS SHOW THE GENERAL ARRANGEMENT OF DUCTWORK, PIPING, EQUIPMENT, ETC.,
<br />AND MAY NOT INCLUDE ALL OFFSETS AND FITTINGS REQUIRED FOR COMPLETE
<br />INSTALLATION. THE DRAWINGS SHALL BE FOLLOWED AS CLOSELY AS ACTUAL BUILDING
<br />CONSTRUCTION AND THE WORK OF OTHERS WILL PERMIT.
<br />2. DO NOT SCALE DRAWINGS. VERIFY ALL DIMENSIONS AND CLEARANCES FROM
<br />ARCHITECTURAL, STRUCTURAL, SUBMITTALS, AND OTHER APPROPRIATE DRAWINGS OR
<br />PHYSICALLY AT SITE. REVIEW ALL DRAWINGS, INCLUDING THOSE OF OTHER TRADES.
<br />3. COORDINATE ALL WORK WITH ALL OTHER TRADES PRIOR TO INSTALLATION TO PROVIDE
<br />CLEARANCES REQUIRED FOR OPERATION, MAINTENANCE, CODE COMPLIANCE, AND TO
<br />VERIFY NON-INTERFERENCE WITH OTHER WORK. DO NOT FABRICATE PRIOR TO
<br />VERIFICATION OF NECESSARY CLEARANCES FOR ALL TRADES. BRING ANY INTERFERENCES
<br />OR CONFLICTS TO THE ATTENTION OF THE ARCHITECT/ENGINEER BEFORE PROCEEDING
<br />WITH FABRICATION OR EQUIPMENT ORDERS.
<br />4. REVIEW SPACE REQUIREMENTS OF EQUIPMENT SPECIFIED OR SUBSTITUTED AND MAKE
<br />REASONABLE ACCOMMODATIONS IN LAYOUT AND POSITIONING TO PROVIDE PROPER
<br />ACCESS.
<br />5. ANY CHANGES REQUIRED TO ELIMINATE CONFLICTS OR THAT RESULT FROM A FAILURE TO
<br />COORDINATE SHALL BE MADE BY THE CONTRACTOR WITHOUT ADDITIONAL COST OR
<br />EXPENSE TO OTHERS.
<br />6 EACH CONTRACTOR IS RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH ELECTRICAL
<br />CHANGES REQUIRED FOR EQUIPMENT PROPOSED THAT DIFFERS FROM THE BASIS OF
<br />DESIGN.
<br />7. REF ER TO ARCHITECTURAL REFLECTED CEILING PLAN ELECTRICAL TECHNOLOGY
<br />AUDIOIVISUAL, AND OTHER MECHANICAL PLANS FOR EXACT LOCATIONS OF ALL CEILING
<br />MOUNTED DEVICES, OTHER THAN SPRINKLERS.
<br />8. EACH CONTRACTOR IS RESPONSIBLE FOR DAMAGE CAUSED BY THEIR ACTIONS TO WALLS,
<br />FLOORS, CEILINGS, AND ROOFS. THE CONTRACTOR WHOSE WORK CAUSES DAMAGE IS
<br />RESPONSIBLE FOR PATCHING TO MATCH ORIGINAL CONSTRUCTION, FIRE RATING, AND
<br />FINISH.
<br />9. IN AREAS WITH DRYWALL CEILINGS COORDINATE LOCATIONS OF ACCESS PANELS WITH THE
<br />GC FOR ACCESS TO VALVES, DUCTWORK ACCESSORIES, DAMPERS, ETC. COORDINATE
<br />PANEL TYPE AND COLOR WITH ARCHITECT. NOTIFY THE GC OF THE REQUIRED ACCESS
<br />PANELS PRIOR TO BIDDING,
<br />10. SEAL ALL FLOOR, WALL, AND ROOF PENETRATIONS AIRTIGHT WHERE CONDUITS, PIPING,
<br />AND DUCTS PENETRATE. PENETRATIONS THROUGH EXTERIOR WALLS AND ROOF SHALL BE
<br />SEALED AIRTIGHT WITH WATERPROOFING MATERIALS RECOMMENDED BY MANUFACTURER
<br />FOR OUTDOOR USE.
<br />11. CAULK ALL PIPE AND DUCT PENETRATIONS OF FULL HEIGHT NON -FIRE RATED WALL,
<br />PARTITION, FLOOR, AND ROOF ASSEMBLIES. THIS IS ESSENTIAL TO PREVENT NOISE
<br />TRANSMISSION FROM ONE ROOM TO ANOTHER AND TO PROVIDE THE DESIRED NC LEVELS
<br />WITHIN ROOMS.
<br />12. WHERE PIPES AND DUCTS ARE SHOWN TO PENETRATE FLOORS, PROVIDE SLEEVED
<br />OPENINGS WITH THE TOP EDGE RAISED ABOVE FLOOR SURFACE IN ACCORDANCE WITH ALL
<br />RELEVANT SPEC SECTIONS. SEAL SLEEVE PERIMETER TO BE WATERTIGHT.
<br />13. EQUIPMENTSIZES AND SERVICE CLEARANCE REQUIREMENTS VARY AMONG DIFFERENT
<br />MANUFACTURERS. CONSULT APPROVED SHOP DRAWINGS FOR EQUIPMENT SIZES AND
<br />REQUIRED SERVICE CLEARANCES. COORDINATE WITH LAYOUT OF EQUIPMENT PADS,
<br />PIPING, DUCTWORK, ETC.
<br />14. DO NOT BLOCK TUBE PULL OR EQUIPMENT SERVICE CLEARANCES.
<br />15. MAINTAIN MINIMUM 3'-6' CLEARANCE IN FRONT OF ALL ELECTRICAL PANELS, MOTOR
<br />STARTERS, SWITCHES, AND DISCONNECTS.
<br />16. PROVIDE CONCRETE EQUIPMENT PAD FOR ALL FLOOR MOUNTED EQUIPMENT. PAD SHALL
<br />EMEND MINIMUM 6" BEYOND ALL SIDES OF EQUIPMENT.
<br />17. DO NOT SUPPORT EQUIPMENT,PIPING, OR DUCTWORK FROM METAL DECKING OR OTHER
<br />NON-STRUCTURAL BUILDING ELEMENTS. ANCHORS EMBEDDED IN CONCRETE SHALL BE
<br />CRACKED CONCRETE APPROVED IN ACCORDANCE WITH SPECIFICATIONS.
<br />18. ALL NEW DUCT DIMENSIONS SHOWN ARE INSIDE CLEAR DIMENSIONS.
<br />19. WITH SPECIFICATIONS.
<br />PLUMBING SYMBOL LIST
<br />NOT ALL SYMBOLS MAY APPLY.
<br />SYMBOL: DESCRIPTION:
<br />-CW-
<br />D
<br />COLD WATER -POTABLE
<br />DRAIN
<br />HOTWATER-POTABLE
<br />HOT WATER CIRCULATING - POTABLE
<br />SANITARY DRAINAGE
<br />VENT
<br />-HW-
<br />-HWC-
<br />-SAN-
<br />-V-
<br />-
<br />PIPE CONTINUATION
<br />PIPE CAP
<br />PIPE DOWN
<br />PIPE UP OR UP/DOWN
<br />DIRECTION OF FLOW IN PIPE
<br />NEW CONNECTION
<br />DIELECTRIC CONNECTION
<br />UNION/FLANGE
<br />SHUTOFF VALVE NORMALLY OPEN
<br />SHUTOFF VALVE NORMALLY CLOSED
<br />BALANCING VALVE (NUMBER INDICATES GPM)
<br />PUMP
<br />METER
<br />ALIGNMENTGUIDE
<br />PIPE ANCHOR
<br />EXPANSION JOINT
<br />O
<br />pd
<br />GPM
<br />-N-
<br />MECHANICAL SHEET INDEX
<br />M0
<br />MECHANICAL COVERSHEET
<br />M1
<br />MECHANICAL DEMOLITION PLAN
<br />M2
<br />MECHANICAL PLAN
<br />M3
<br />MECHANICAL AND PLUMBING DETAILS AND SCHEDULES
<br />M4
<br />MECHANICAL AND PLUMBING SCHEDULES
<br />M5
<br />MECHANICAL SCHEDULES
<br />M6
<br />VRF PIPING SCHEMATIC
<br />M7
<br />MECHANICAL AND PLUMBING SPECIFICATIONS
<br />MIS
<br />MECHANICAL AND PLUMBING SPECIFICATIONS
<br />M9
<br />MECHANICAL AND PLUMBING SPECIFICATIONS
<br />M10
<br />MECHANICAL AND PLUMBING SPECIFICATIONS
<br />M11
<br />MECHANICAL ENERGY COMPLIANCE FORMS
<br />M12
<br />MECHANICAL ENERGY COMPLIANCE FORMS
<br />M13
<br />MECHANICAL ENERGY COMPLIANCE FORMS
<br />M14
<br />MECHANICAL ENERGY COMPLIANCE FORMS
<br />P1
<br />PLUMBING PLAN
<br />GRAND TOTAL: 16
<br />VENTILATION GENERAL NOTES:
<br />1. ALIGN TEMPERATURE SENSORS WITH LIGHT SWITCHES AND WHEN IN CLOSE PROXIMITY TO
<br />EACH OTHER.
<br />2. PROVIDE ACCESS DOORS AT ALL DUCT MOUNTED EQUIPMENT.
<br />3. EXISTING AIR INLET AND OUTLET CFM SHOWN ON DRAWINGS ARE FROM EXISTING
<br />DRAWINGS, AND ARE FOR REFERENCE ONLY. CONTRACTOR SHALL USE PRE -BALANCE
<br />VALUES, AND NOT EXISTING CFM SHOWN ON DRAWINGS.
<br />4. CONTRACTOR MAY REUSE PORTIONS OF EXISTING DUCT PROVIDED SIZES AND PRESSURE
<br />CLASSES ARE CORRECT, DUCT IS THOROUGHLY CLEANED AND FREE OF DEFECTS, AND ALL
<br />TRANSVERSE JOINTS, LONGITUDINAL SEAMS, AND DUCT WALL PENETRATIONS ARE SEALED
<br />AS SPECIFIED FOR NEW DUCTWORK.
<br />TAB POST -CONSTRUCTION NOTES:
<br />1. AFTER CONSTRUCTION ACTIVITIES ARE COMPLETE, TESTING, ADJUSTING (TAB) AND
<br />BALANCING CONTRACTOR SHALL REBALANCE AIR HANDLING UNITS AND EXHAUST FANS AS
<br />REQUIRED TO ACHIEVE THE NEW AIRFLOW VALUES SHOWN ON THE CONSTRUCTION
<br />DRAWINGS.
<br />2. AREAS SERVED BY THIS EQUIPMENT WHICH WERE NOT RENOVATED SHALL BE RE-
<br />BALANCED TO THE AIRFLOW RATES MEASURED BEFORE THE RENOVATION OCCURRED
<br />(REFER TO THE FINAL PRE- DEMOLITION REPORT).
<br />3. IF DUCT TRAVERSE LOCATION AS MARKED ON THE DRAWINGS IS INACCESSIBLE FOR
<br />MEASUREMENT, THE TAB CONTRACTOR SHALL PERFORM THE TRAVERSE AT AN ALTERNATE
<br />LOCATION OR SHALL TAKE MULTIPLE DUCT TRAVERSES AND/OR GRILLE READINGS AS
<br />REQUIRED TO DETERMINE THE FLOW RATE. IN THE EVENT TRAVERSES ARE TAKEN AT AN
<br />ALTERNATE LOCATIONS TAB CONTRACTOR SHALL INCLUDE A DRAWING THAT SHOWS THE
<br />LOCATIONS TIHERE THE ACTUAL MEASUREMENTS WERE TAKEN.
<br />4. A DUCT STATIC PRESSURE READING SHALLTAKEN AT EACH LOCATION WHERE A DUCT
<br />TRAVERSE READING IS TAKEN AND SHALL BEE INCLUDED IN THE FINAL POST -CONSTRUCTION
<br />TAB REPORT.
<br />5. TAB CONTRACTOR SHALL COMPILE AND SUBMIT COPIES OF THE FINAL POST -
<br />CONSTRUCTION TAB REPORT AS REQUIRED SECTION 23 05 93.
<br />6. THE FINAL POST CONSTRUCTION REPORT SHALL INCLUDE ALL ITEMS REQUIRED IN THE
<br />SPECIFICATIONS.
<br />MECHANICAL RENOVATION NOTES:
<br />THESE NOTES APPLY TO ALL MECHANICAL SHEETS AND TRADES, INCLUDING BUT NOT LIMITED
<br />TO, VENTILATION, PIPING AND TEMPERATURE CONTROL.
<br />1. EXISTING CONDITIONS ARE SHOWN BASED ON INFORMATION OBTAINED FROM FIELD
<br />SURVEYS COMPLETED BY OTHERS, EXISTING BUILDING DOCUMENTS, AND STAFF. VERIFY
<br />EXISTING CONDITIONS AND REPORT ANY CONFLICTS BEFORE PROCEEDING.
<br />2. NOT ALL EXISTING DUCTWORK AND PIPING IS SHOWN. VERIFY EXISTING CONDITIONS
<br />BEFORE STARTING WORK. NOTIFY ENGINEER OF ANY CONFLICTS WITH NEW WORK.
<br />3. FIELD VERIFY THE AVAILABLE CLEARANCES FOR DUCTWORK AND PIPING BEFORE
<br />FABRICATION. RISES AND DROPS MAY BE NECESSARY BECAUSE OF EXISTING FIELD
<br />CONDITIONS
<br />4. EACH CONTRACTOR SHALL FIELD VERIFY ACCESSIBILITY TO THE AREA OF HIS/HER WORK
<br />AND SHALL NOTIFY THE GENERAL CONTRACTOR PRIOR TO BIDDING IF OTHER UTILITIES ARE
<br />REQUIRED TO BE REMOVED OR RELOCATED TO ALLOW ACCESS TO HIS/HER AREA OF
<br />WORK.
<br />5. EACH CONTRACTOR SHALL CUT AND PATCH ROOFS, WALLS, AND FLOORS ASSOCIATED
<br />WITH HIS WORK.
<br />6. EACH CONTRACTOR IS RESPONSIBLE FOR REMOVAL AND REPLACEMENT OF CEILINGS,
<br />CEILING TILES, AND CEILING GRIDS ASSOCIATED WITH AREAS OF WORK BY ALL
<br />CONTRACTORS. NOTIFY THE GENERAL CONTRACTOR OF AFFECTED AREAS PRIOR TO
<br />BIDDING.
<br />7. WHERE EXISTING MECHANICAL SYSTEMS ARE LOCATED IN AREAS THAT CONFLICT WITH
<br />NEW EQUIPMENT, PIPING, OR DUCTWORK TO BE INSTALLED, EACH CONTRACTOR SHALL
<br />EITHER ARRANGE NEW EQUIPMENT, PIPING, OR DUCTWORK IN SUCH A FASHION THAT IT
<br />DOES NOT CONFLICT WITH EXISTING SYSTEMS, OR REWORK EXISTING MECHANICAL
<br />SYSTEMS TO ALLOW FOR INSTALLATION OF NEW EQUIPMENT, PIPING, OR DUCTWORK.
<br />8. PROVIDE TEMPORARY CONNECTIONS TO MAINTAIN EXISTING SYSTEMS IN SERVICE DURING
<br />CONSTRUCTION. MAINTAIN ACCESS TO EXISTING MECHANICAL INSTALLATIONS THAT
<br />REMAIN ACTIVE.
<br />9. OBTAIN PERMISSION FROM OWNER BEFORE SHUTTING DOWN ANY SYSTEM FOR ANY
<br />REASON. MAINTAIN SERVICE TO ALL COMPONENTS THAT ARE TO REMAIN UNTIL NEW
<br />SYSTEMS ARE INSTALLED.
<br />10. MAINTAIN EXISTING SYSTEM IN SERVICE UNTIL NEW SYSTEM IS COMPLETE AND READY FOR
<br />TIE IN AND SWITCHOVER. DRAIN SYSTEM ONLY TO MAKE SWITCHOVERS AND
<br />CONNECTIONS. OBTAIN PERMISSION FROM OWNER BEFORE PARTIALLY OR COMPLETELY
<br />DRAINING SYSTEM. MAKE CHANGEOVER TO NEW SYSTEMS WITH MINIMUM OUTAGE.
<br />11. DISCONNECT AND REMOVE MECHANICAL DEVICES AND EQUIPMENT SERVING EQUIPMENT
<br />THAT HAS BEEN REMOVED.
<br />PLUMBING GENERAL NOTES:
<br />1. THE SYMBOLS AND THE MATERIAL LIST ARE FOR THE CONVENIENCE OF THE CONTRACTOR.
<br />CONTRACTOR SHALL VERIFY QUANTITIES AND FURNISH ALL MATERIALS REQUIRED FOR
<br />FULLY OPERATIONAL SYSTEMS, WHETHER SPECIFIED OR NOT.
<br />2. CATALOG NUMBERS SHALL NOT BE CONSIDERED COMPLETE, BUT ARE GIVEN AS AN AID TO
<br />THE CONTRACTOR AND TO INDICATE THE QUALITY REQUIRED. CONTRACTOR IS
<br />RESPONSIBLE FOR A COMPLETE DESCRIPTION OF MATERIAL ON THESE DRAWINGS AND IN
<br />THE SPECIFICATIONS BEFORE ORDERING. THE DESCRIPTION OF THE MATERIAL TAKES
<br />PRECEDENCE OVER THE CATALOG NUMBER. THE FIRST MANUFACTURER LISTED IS THE
<br />BASIS OF DESIGN.
<br />3. CONTRACTOR SHALL VERIFY THAT FIXTURES SUPPLIED ARE APPROVED PER ALL
<br />APPLICABLE STATE, LOCAL AND GOVERNING AUTHORITIES.
<br />4. ALL FIXTURES SHALL CONFORM TO FEDERAL ACT S.3874
<br />5. INVERT ELEVATIONS ARE FROM EXISTING DRAWINGS AND MAY NOT BE ACCURATE. VERIFY
<br />ALL ELEVATIONS BEFORE BEGINNING WORK.
<br />6. VERIFY UNDERGROUND PIPE SIZES, INVERT ELEVATIONS, AND LOCATIONS PRIOR TO
<br />BEGINNING ANY WORK.
<br />7. REFER TO THE PLUMBING ROUGH -IN SCHEDULE FOR THE SIZES OF BRANCH PIPES TO
<br />PLUMBING FIXTURES.
<br />8. FOR CLARITY, NOT ALL VALVES HAVE BEEN SHOWN. PROVIDE SHUTOFF VALVES IN
<br />DOMESTIC WATER PIPING SERVING EACH ROOM WITH FIXTURES. ANGLE STOPS SHALL NOT
<br />BE CONSIDERED SHUTOFF VALVES.
<br />9. EXISTING CONDITIONS ON DEMOLITION PLANS ARE PROVIDED TO INDICATE THE GENERAL
<br />SCOPE OF ITEMS TO BE REMOVED. REFER TO SPECIFICATION SECTION 2205 05 FOR
<br />ADDITIONAL DEMOLITION INFORMATION.
<br />10. P.C. SHALL CUT AND PATCH EXISTING AS REQUIRED FOR NEW OR DEMOLITION WORK
<br />UNLESS NOTED OTHERWISE. REFER TO SPECIFICATION SECTION 22 0505 FOR ADDITIONAL
<br />INFORMATION.
<br />MECHANICAL DESIGN CONDITIONS:
<br />DESIGN CONDITIONS: BASED ON WEATHER DATA FOR: EVERETT, WA
<br />SUMMER: 80.9°F DRY BULB, 633-F WET BULB
<br />WINTER: 254°F DRY BULB
<br />WINTER: (AIR SYSTEM'S OUTSIDE AIR STREAM) 21°F DRY BULB
<br />TYPICAL ROOM SETPOINTS:
<br />SUMMER DESIGN: 75°F DRY BULB, NO HUMIDITY REQUIREMENT
<br />WINTER DESIGN: 70°F DRY BULB, NO HUMIDITY REQUIREMENT
<br />SUMMER SETBACK: 85°F DRY BULB, NO HUMIDITY REQUIREMENT
<br />WINTER SETBACK: 55T DRY BULB, NO HUMIDITY REQUIREMENT
<br />�I,blc LAWRENCE
<br />GROUP
<br />St. Louis
<br />319 North 4th Street
<br />Suite 1000
<br />St. Louis, Missouri 63102
<br />(314)231-5700
<br />cErvTo Be Date-ined
<br />PRO-SIONAL ENGINEER.
<br />846,
<br />wIMEG
<br />7600 E Orchard Road Suite 250S
<br />Greenwood Village, CO 80111
<br />Phone: 303.796.6000
<br />IMEG Project No: 24000280.07
<br />P,Mmonal Seal
<br />W
<br />O
<br />l
<br />:epS GI}T FE�V?�
<br />ONAL-EN
<br />oe.al.a�ay
<br />EAo O l • t0 • i-07d
<br />LU
<br />wT
<br />V I
<br />O
<br />70
<br />U N
<br />do
<br />do
<br />>
<br />do
<br />� t
<br />O
<br />I I0
<br />CQ W
<br />O �
<br />co VJ
<br />aPgK.. o�ybre
<br />'iellM r°a soon pare aawirageop.a�rea y
<br />axing aM tletaib on it are iM1e sda pro aecayl only. e
<br />mpieE a�eproEuced InwMb or
<br />wdten c°nmM°� M1epzmma or WoladwilMd Ma
<br />No. D-iptbn Date
<br />1 1 Revision 1 Date 1
<br />2 IFOR CONSTRUCTION 07/11/2024
<br />3 MECH PERMIT 07/24/2024
<br />MECHANICAL
<br />COVERSHEET
<br />Pqadxunea. sl.xxaae..
<br />2024906.011
<br />Dawn ar
<br />MSK � 0
<br />Isar. ona:
<br />MARCH 27. 2024