KENT CRANE <br /> INSPECTION AND ENGINEERING <br /> Summary: <br /> Overall, the welds were in good condition and were absent of cracks,undercut, and <br /> porosity.All welds passed visual inspection. <br /> KIE was on site April 21, 2024, at the Burton Construction Everett Marina project to <br /> perform the welding inspection on the structural member connections for their two building <br /> canopies. The welds were inspected in accordance to AWS D1.1 (2020).All welds were in <br /> good induction and absent of welding defects such as porosity,undercut,and lack of fusion. <br /> All weld lengths were acceptable including the termination points. <br /> Best Regards, <br /> Benjamin Cross <br /> Mechanical Engineer(EIT), Inspector <br /> WA State Cert. #131606, CWI#24017013 <br /> 206-379-8992 <br /> Ben.cross&kenten in�g com <br /> ���HAR�FS <br /> wasyti l� <br /> Michael C. Leach, MS, PE, CWI, CWEng 0 i <br /> Director of Engineering and Inspection, Managing Engineer <br /> Michaelkkenten in�g com 0 <br /> � 20105309 �Q7 <br /> E �\ <br /> S/ONALEN <br /> Our inspection and report is advisory only and is exclusively limited to the matters stated herein. KCIE has <br /> not been requested to and does not warrant the merchantability or fitness of the equipment for its intended <br /> use, and we make no representations with regarding thereto. KCIE has not analyzed the materials used, <br /> procedures used or construction of the equipment other than as stated above and expresses no opinion thereon. <br /> KCIE does not accept responsibility for any damages whether personal injury,property damage or otherwise, <br /> arising from the ownership,rental,possession,or use of equipment. <br /> 4/26/2024 <br /> KCIE_BURTON CONSTRUCTION_EVERETT MARINA_BUILDING CANOPIES_WELD INSPECTION REPORT_2024.04.19 <br /> Page 4 of 5 <br />