Laserfiche WebLink
NOTE: FLASHING AND <br /> WATERPROOFING BY OTHERS. <br /> 20'-0" <br /> FIELD VERIFY <br /> CANOPY AND ITS CONNECTION <br /> TO HSS BY OTHERS, CENTER <br /> OVER DOOR UNO BY OWNER <br /> A I <br /> COORDINATE INSTALLED <br /> HEIGHTS OF HSS BEAMS W/ <br /> CANOPY DESIGN <br /> TYP 2 - CANOPY TIE ROD AND ITS <br /> PLACES 2 CONNECTION TO HSS BY OTHERS 1 TYP 2 <br /> I LACES <br /> THIS COL. S2.3 _ S2.3 '' THIS COL. <br /> 6 III <br /> II , <br /> FIELD DRILL HOLES IN <br /> - ' <br /> _II REINFORCING ANGLES <br /> HSS8x6x3/16 <br /> FOR (E)WEB BOLTING <br /> PAIR OF REINFORCING ANGLES, AND (E) GIRT BOLTING, <br /> TYP EA COLUMN -- REMOVE (E) BOLTS AND <br /> M III REINSTALL WITH ANGLE <br /> (E)ZEE GIRT, DEMO C PLACE, TYP EA <br /> COLUMN y <br /> HSS8x6x3/16 w <br /> >1 3 <br /> N O C� <br /> m w <br /> O O <br /> - (E) BUILDING CORNER <br /> COLUMN, TYP ~ <br /> I x <br /> A <br /> (E) DOOR TO TENANT:MARITIME INSTITUTE SECTION A-A <br /> n PARTIAL SOUTH FRAMING ELEVATION <br /> U 1/4" = 1'-0" <br /> Sow R �c <br /> r <br /> KI NGWORKS CANOPY OVER SOUTH DOOR <br /> POE Maritime Building Canopies <br /> 9,2 STRUCTURAL <br /> 7388 REV DATE ISSUED FOR Project number 23223 <br /> L � � MENGINEERS Date 5-MAR-2024 S 2.2 <br /> 1 29-APR-2024 Construction <br /> SSIONAL 600 Dupont St,Suite B 360.714.8260 Drawn by THeidersdorf <br /> Bellingham,WA 98225 www.king-works.com Checked b Wohnson Scale 1/4"=1'-01, <br /> HIS ELECTRONIC SEAL A D SIGNATURE IS <br /> ELECTRONIC DocuMENT. ©copyright Kingworks Structural Engineers PLLC:2024 4/29/2024 9:18:10 AM <br /> A DIGITAL SIGNATURE IS APPLIED AT ONE <br /> LOCATION IN THE DOCUMENT. <br />