Laserfiche WebLink
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: M2409-058 Description: EXISTING HOUSE-Gas furnace,A/C,Gas W/H,gas piping- <br /> 2 <br /> Applied:9/17/2024 Approved: 10/8/2024 Site Address: 5502 OCEAN AVE <br /> Issued: 10/10/2024 Finaled: 10/23/2024 City,State Zip Code: EVERETT,WA 98203-1309 <br /> Status: FINALED Applicant: PM Heating LLC <br /> Parent Permit: Owner: LANTEYEIDERU DAWIT AMARE/JIRU ADDIS DEBE <br /> Parent Project: Contractor: PM HEATING(CONST) LLC <br /> Details: <br /> *SUBJECT TO FIELD INSPECTION.OUTDOOR UNITS NOT TO BE INSTALLED IN ANY FRONT OR SIDE YARD SETBACK"EQUIPMENT MAY <br /> NOT EXCEED THE MAXIMUM PERMISSIBLE NOISE LEVELS SET FORTH IN CHAPTER 20.08 EMC,NOISE CONTROL* **SUBJECT TO FIELD <br /> INSPECTION** *FURTHER PERMITS MAY BE REQUIRED* <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> 10/15/2024 10/15/2024 71N <br /> 04-ROUGH IEFF M RHODE CORRECTION see notes <br /> REQUIRED <br /> Notes: <br /> 10/10/2024 2:20 PM Dawit Lanteyeideru <br /> Contact Name:Dawit Lanteyeideru <br /> Site Address:5502 OCEAN AVE <br /> Phone:2066949568 <br /> e-Mail:topcare9@gmail.com <br /> -have gas test pressurized to 15psi on gauge at time of inspection <br /> -paint exterior gas pipe verify at final <br /> -must terminate and p of water heater to approved location <br /> -must have metal connections with in 18 inches of water heater <br /> -emergency condensate overflow required for install of ac coil <br /> -emergency locking caps required on outdoor refrigeration test ports <br /> -pad unit is on must be secured to ground or secure unit to structure <br /> -have manufactures instructions onsite to verify combustion air from attic space <br /> 10/21/2024 10/21/2024 MECH 04-ROUGH JEFF M RHODE APPROVAL see notes <br /> IN <br /> Notes: <br /> 10/16/2024 7:45 AM Dawit Lanteyeideru <br /> Contact Name:Dawit Lanteyeideru <br /> Site Address:5502 OCEAN AVE <br /> Phone:2066949568 <br /> e-Mail:topcare9@gmail.com <br /> -gas roughin ok-call in for final when units operational-locking refrigeration caps required at outdoor unit-properly secure unit pad <br /> I <br /> Printed: Friday, 13 December, 2024 1 of 2 rk <br /> SUPERION <br />