Laserfiche WebLink
INSIGHT ENGINEERING CO. <br /> PRELIMINARY STORMWATER SITE PLAN <br /> For <br /> Seahurst Lane <br /> [-D? <br /> Prepared for DEC p 2023 <br /> City of Everett <br /> 2930 Wetmore Ave CI OF EVERETT <br /> Everett, WA-98201 Permit Services <br /> 425.257.8700 <br /> Applicant/Owner: Contact: <br /> Jerry Gaswint Brian R. Kalab, P.E. <br /> 3120 Glacier Pk. Ave. P.O. Box- 1478 <br /> Everett,WA 98208 Everett,WA-98206 <br /> Ph: (425)-353-0645 425.303.9363 <br /> Project Site Location: <br /> 600 54th Street SW <br /> Everett,WA 98275 <br /> IECO Project: 18-0915 <br /> Certified Erosion and Sedimentation Control Lead: <br /> Brian R. Kalab, P.E. <br /> Stormwater Site Plan Prepared By: <br /> Jacob D. Mealey, P. E. <br /> R R. ,�. <br /> Stormwater Site Plan Preparation Date: P ,A "1 si, -1 <br /> July 3, 2019 ��•:` �1'r <br /> 1.7i7: It IN] , <br /> Approximate Construction Date: - <br /> March 1, 2020 <br /> G/(,\ ‘I \� <br /> P.O Box 1478 • Everett, WA 98206 • P: 425.303.9363 07/10/2019 <br /> F: 425.303.9362 • info@insightengineering.net <br />