Laserfiche WebLink
Intake &Approval Sheet (FOR PERMIT STAFF ONLY) PERMIT# .4t�;")' —O 57 <br /> BUILDING ANNING <br /> Intake OK by: Date: Intake OK by: if" Assign To: .3e,SS Date:5/2./Z <br /> Intake Comments: Intake Comments: <br /> Zone R.2 <br /> Overlay/Agreement A%A <br /> ❑ Route to Commercial Building Nonresidential Use N/A <br /> ❑ Route to Residential Building Residential Use SF R <br /> ❑ Make this a"W" Permit Proposed No. of Dwelling Units: I <br /> Bldg/TI/Addn/Rem Size ..‘ -5'1 Total No. of Dwelling Units: I <br /> Garage/Accessory Struct.Size 1 !3 PlanninglLandscape Inspe Lion Required before Final? DYes EINo <br /> Number of Stories 3 "In Lieu"Fee:Type: Amount$-D <br /> Basement EINo ❑Yes , Fin/Unfin School Impact Fee: To I $ to,ZS42 <br /> Type of Construction 3.4 _ Calculated: (o ZCo Credit: r' <br /> Occupancy Group i Q.L ElEverett School Dist ❑M litho School Dist <br /> Occupancy Load .14--'-' Park Impact Fees for permits a plied for after 11112022: <br /> Fire Sprinklers: DUpdate Existing ❑New System 2.J'Iot.Req'd Park Impact Fee Total L 3 L O v___.(net due after credit for existing uses) <br /> Reason Sprinklers Required: Fee Schedule Used For Calculation(Year): 'L 3 <br /> Fire Alarm: DUpdate Existing ONew System 1Wiot Req'd Permit Technician Use Only:Apply Phase-In Credit Per EMC19.53.200 <br /> Reason Fire Alarm Required: 1 0 100%Credit-Issued 1/1/2022-9/2/2022 <br /> rz <br /> RCW 64.55 MF Worksheet req'd for permit? ❑Yes l l-No ❑ 50%Credit-Issued d/3/2022-6/2/2023 <br /> Addl RCW 64.55 docs required prior to final? ❑Yes [-No 0 0%Credit-Issued 6/3/2023 or later <br /> VALUATION CALCULATION: Total$ i,l L 3 it9L4 Additional Notes: <br /> l Approved By: .rur Date: 2./ge <br /> (0( 60,d ' ?' / '11° , . , <br /> 8Lic WORKS <br /> Additional Notes: Intake OK by: Date: <br /> Intake Comments: PW Worksheet Needed if <br /> ❑Sys Dev Eval(0til/SW) DTraffic Mit Eval <br /> Approved By: C r ' 9 Date: �'9.'' 3 ❑Site Work/Drainage Address Letter <br /> `}� ❑Backflow Prevention for high hazard: <br /> (dental,medical,animals,mortuary,hospital, <br /> FIRE DEPARTMENT supportive housing) <br /> Separate/Deferred Submittals Required: DRoute this folder for PW Review at end --PW Review Worksheet <br /> ❑Fire Sprinklers ❑Fire Alarm ❑Other: ❑This project also has a separate concurrent PW Review(Green Folder) <br /> Additional Notes: AND ❑Create Green Folder ❑Submitted Previously ❑Deferred <br /> l.-^9�This Permit is Approved by Public Works <br /> Fire Dept. Fees: Jee PW Review Worksheet and associated attached items <br /> ❑ Review of As-Built Plans-NO FIRE FEE l-A Separate PW Permit is Required(Permit#: PW 2308 eLZ) <br /> Minimal or No Fire Scope-NO FIRE FEE AND Is located in this folder <br /> ❑ Review/Inspection Scope-ADD FIRE FEE ❑ Is in a Separate Green Folder(join with this folder for permit issuance) <br /> Approved By: i:;'C->'.cJl'1 Date: Gf= _23 ❑Will be issued separately(Separate Green Folder,PW issued ahead of Bldg) <br /> 0 Public Works has no scope--PW Not Required <br /> ELECTRICAL/PLUMBING Additional Notes: <br /> Additional Notes: <br /> Approved By: Date: Completed y; "—" Date: 8/ i ci b ,z.:3 <br />