Laserfiche WebLink
The comments below were generated from this project's City of Everett Civil Reviewers.All questions shall be routed through this project's Public Works <br /> Reviewer Thad Newport with City of Everett Permit Services (TNewport@everettwa.gov). <br /> # Document Sht/Pg Reviewer's Comment Designer's Response Initials <br /> 1 Site Plan — Include a TESC Plan similar to City of Everett Standard Drawing <br /> 103 showing how the 13 elements of erosion control will be <br /> managed and where they will be located on the site. <br /> 2 Site Plan — • Update the Site Plan to include sewer stub location and <br /> drainage connection per approved subdivision civil plans. <br /> • Add note to plan that all roof drainage and driveway drainage <br /> to be directed to the combined detention/wetvault per <br /> approved subdivision civil plans. <br /> 3 Drainage — • Provide Drainage Narrative that explains what stormwater <br /> Narrative minimum requirements are triggered based on hard surface <br /> and quantities and how those were managed as part of Civil Plans <br /> Declaration for Subdivision. Include Note that all disturbed areas to be <br /> amended per BMP T5.13. <br /> of Covenant <br /> • Provide signed draft of Declaration of Covenant for <br /> Stormwater BMPs for review. This document must be <br /> recorded with the County prior to final inspection/Certificate of <br /> Occupancy. <br /> Page 2 of 2 <br />