My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
600 54TH ST SW D 2025-01-28
>
Address Records
>
54TH ST SW
>
600
>
600 54TH ST SW D 2025-01-28
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/28/2025 2:15:05 PM
Creation date
12/16/2024 12:00:53 PM
Metadata
Fields
Template:
Address Document
Street Name
54TH ST SW
Street Number
600
Unit
D
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
187
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N. <br /> Amoaclobos <br /> 5005 M AVOTH AVE HE <br /> ' , KFrklmd,INA. <br /> 4505ZII-45111 <br /> (425)020-4117 <br /> CI <br /> (/) J <br /> w CO r <br /> N <br /> M H co <br /> 5 rJ 12 v oz z,—rn <br /> X w eL-3 <br /> Z w <br /> // w <br /> O 0 J <br /> 0 CtgN> <br /> 2 X z `" r <br /> 4 1 cE o a <br /> 7 ! O o0 m <br /> 1 113 <br /> L <br /> LLL <br /> 5 0 <br /> Y <br /> STOCKPKE <br /> 5 <br /> 1 0 X <br /> K <br /> ELEMENT #1- PRESERVE VEGETATION/MARK CLEARING LIMITS _I E <br /> * HIGH VISIBILITY PLASTIC FENCE BEING USED TO MARK ELEMENT #6- PROTECT SOILS <br /> CLEARING LIMITS * NOT APPLICABLE TO THIS PROJECT I- p <br /> ELEMENT #2- ESTABLISH CONSTRUCTION ACCESS ELEMENT #7- PROTECT DRAIN INLETS ,n <br /> * 10'X10' STABILIZED ROCK CONSTRUCTION ENTERANCE AT DRIVEWAY * NEARBY STORM INLETS TO BE COVERED WITH ALTER FABRIC �1! <br /> ELEMENT #3- CONTROL FLOW RATES DURING CONSTRUCTION �/ ill <br /> * NOT APPLICABLE TO THIS PROJECT ELEMENT #8- STABILIZE CHANNELS AND OUTLETS <br /> ELEMENT #4- INSTALL SEDIMENT CONTROLS * NOT APPLICABLE TO THIS PROJECT* SILT FENCE LOCATED AT BOTTOM OF SITE DISTRUBANCE AREA ELEMENT #9- CONTROL POLLUTANTS I Ill <br /> ELEMENT #5- STABILIZE SOILS * NOT APPLICABLE TO THIS PROJECT 1( <br /> * ALL DISTURBED AREAS TO BE BUILT UPON OR COVERED ELEMENT #10- CONTROL DEWATERING '``I��' <br /> WITH TOPSOIL, MULCH AND LANDSCAPING * NOT APPLICABLE TO THIS PROJECT L1.1 <br /> * STOCKPILE ON SITE TO BE COVERED WITH ELEMENT #11- MAINTAIN BMPS 16 � 1 �I <br /> PLASTIC SHEETING *KEEP MATERIAL ON HAND U ++ <br /> ELEMENT #12- MANAGE THE PROJECT <br /> * SITE SUPER TO KEEP MATERIAL ON HAND AND MAINTAIN BMPS 0 <br /> ELEMENT #13- PROTECT LOW IMPAT DEVELOPMENT EL <br /> * HIGH VISIBILITY PLASTIC FENCE <br /> CONSTRUCTION X X X <br /> FENCE N <br /> SILT O 0 0 <br /> i m <br /> FENCE <br /> 0 � <br /> PROTECTION INLETLLL 0 12 5 10 15 20 30 40 50 < O V K <br /> r— — I Q DI <br /> CONSTRUCTION 7./6 <br /> LOT 4—TESG FLAN SHEET <br /> ENTRANCE Cp4 SGALE: I"=20' <br /> ELEMENT <br />
The URL can be used to link to this page
Your browser does not support the video tag.