Laserfiche WebLink
M f <br /> art) <br /> INSIGHT ENGINEERING CO. <br /> PRELIMINARY STORMWATER SITE PLAN <br /> For <br /> Seahurst Lane <br /> Prepared for <br /> City of Everett <br /> 2930 Wetmore Ave <br /> Everett, WA-98201 <br /> 425.257.8700 <br /> Applicant/Owner: Contact: <br /> Jerry Gaswint Brian R. Kalab, P.E. <br /> 3120 Glacier Pk. Ave. P.O. Box- 1478 <br /> Everett, WA 98208 Everett, WA-98206 <br /> Ph: (425)-353-0645 425.303.9363 <br /> Project Site Location: <br /> 600 54th Street SW <br /> Everett, WA 98275 <br /> IECO Project: 18-0915 <br /> Certified Erosion and Sedimentation Control Lead: <br /> Brian R. Kalab, P.E. <br /> Stormwater Site Plan Prepared By: <br /> Jacob D. Mealey, P. E. <br /> R. k <br /> Stormwater Site Plan Preparation Date: <br /> July 3, 2019 <br /> Approximate Construction Date: <br /> March 1, 2020 'P 36499 <br /> ��`sC�NALYG� <br /> P.O Box 1478 • Everett, WA 98206 • P: 425.303.9363 0711012019 <br /> F: 425.303.9362 • info@insightengineering.net <br />