Laserfiche WebLink
fAIAOTIA -Miller MacDonald <br /> FACILITY SOLUTIONS <br /> Terra Power <br /> Laser Lab <br /> Job # 72247025 <br /> I. General Notes: <br /> A. HVAC testing, adjusting and balancing(TAB)was completed on 6.20.2024. <br /> B. The balancing procedures,techniques, and instrumentation were those set forth by the <br /> National Environmental Balancing Bureau <br /> C. Additional requirements described in the Mechanical Specifications. Testing,Adjusting, and <br /> Balancing were incorporated into the balancing procedures. Any deviations were noted and <br /> approved by the consulting engineer. <br /> D. Outlet volumetric flow rates were measured using a calibrated flow hood. <br /> II. Scope of work <br /> A. Test,Adjust, and Balance of HVAC equipment. <br /> B. Documentation of any deficiencies and to provide certified balance report. <br /> III. Description of the Systems <br /> A. 1 CaptiveAire Energy Recovery Unit <br /> B. 3 Nailor VAV Units <br /> IV. TAB Procedures Summarized <br /> A. The rotating equipment was tested for proper rotation and operation. <br /> B. Primary airflow calibrated at the maximum setpoint. <br /> C. Outlet flow measurements were made and proportioned to design air quantities. <br /> D. Static pressures recorded on the ERV. <br /> Field Technician: Brian Grimsley and Mikhail Gadomskiy <br /> Page 6 of 14 <br />