My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2515 HOYT AVE 2025-01-06
>
Address Records
>
HOYT AVE
>
2515
>
2515 HOYT AVE 2025-01-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 9:56:53 AM
Creation date
12/17/2024 10:14:39 AM
Metadata
Fields
Template:
Address Document
Street Name
HOYT AVE
Street Number
2515
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GENERAL NOTES: T <br /> CAPACITY MAX WORKING MIN.FLOW MIN.FLOW ELECTRICAL OPERATING BASIS OF DESIGN 1.NEW BOILER IS CAT.I APPLIANCE.USE TYPE B DOUBLE WALL FLUE MATERIAL PER MANUFACTURER'S INSTALL INSTRUCTIONS. +"' O <br /> 2.ALL NEW HYDRONIC PIPING, FITTINGS,AND VALVES SHALL BE RATED FOR THE OPERATING PRESSURE AND TEMPERATURE OF THE <br /> PRESSURE(PSI)RATE�20F(GPM) RATE�30F(GPM) WEIGHT(LBS) SIZE(IN) Q <br /> MARK LOCATION INPUT(MBH OUTPUT(M BH)EFFICIENCY VOLTIPHASE MOCP/MCA MANUFACTURER MODEL SERVES REMARKS SYSTEM PER 2018 WSMC 1202.3.HYDRONIC MAX BOILER OPERATING PRESSURE IS 160 PSI AND MAX OPERATING TEMPERATURE Q c <br /> B-1 BOILER ROOM 1,260 1,068 84.0% 160 107 71 120/1 16/<12 1100 RAYPAK H9-1262C 69x33x41 HYD.LOOP ALL IS 160F. U O <br /> 3.REFER TO M2.1 BOILER SCEHMATIC FOR PIPE SIZING. <br /> 4. NG PIPING TO MATCH EXISTING PIPING MATERIAL AND SCHEDULE. <br /> REMARKS 5.INSTALL NEW 2"INSULATION WITH JACKETING ON NEW HYDRONIC PIPING,FITTINGS AND APPURTENANCES. DO NOT INSULATE DRAIN M U <br /> 1.PROVIDE WITH 60 PSIG ASME PRESSURE RELIEF VALVE LINES,BYPASS LINES,GAS LINES OR MAKE-UP WATER LINES. — CT <br /> 2.PROVIDE WITH OUTDOOR AIR TEMPERATURE SENSOR FOR SETBACK CONTROL 6.PRESSURE TEST AND LEAK TEST NEW PIPING SECTIONS. Lf) J <br /> 3.PROVIDE WITH 4 HEATING STAGES. <br /> 4.PROVIDE WITH HALO GAS PRESSURE SWITCHES ^� N aj <br /> !_ N <br /> Ua Q <br /> /7 U <br /> VJ C <br /> 5 � <br /> L <br /> LO <br /> cn .0 <br /> 70 <br /> am <br /> (E)HOT WATER HEATER MOUNT AIR DIRT SEPERATOR <br /> TO REMAIN ABOVE HWR RISER ELBOW (E)DRAIN <br /> INSTALL(N)EXPANSION TANK 3132 N.E.133 ST <br /> (E)REDUCED PRESSURE SEE SHEET M2.1 BOILER SCEHMATIC- Seattle,Washington 98125-4423 <br /> BACKFLOW PREVENTER HYDRONIC PIPING FOR APPURTENANCES INSTALL BYPASS FILTER FEEDER PO Box 27073 <br /> seanla,Washington 981s5-1473 <br /> (2")367-2500 <br /> 7_,, Fax(206)368-6856 <br /> Q Q— �^ PSRMEML809C6 <br /> t TI t—HWR <br /> I 1 1 i I I <br /> 1 -- <br /> — — -- -- l-- -- -- DOMESTIC HW SUPPLY---- 1 <br /> I <br /> I � Y <br /> I Q O <br /> l <br /> I � <br /> 1 I 1 I Z 3 EX 14"EX- I 14"EX I 14"EX cw <br /> O w C /W/�LL LLj <br /> Ili l Z U O <br /> I <br /> 1 = W N <br /> __—MAKE UP WATER __ __ __ __ i O a m <br /> -- -- -- -- -- -- -- -- DOMESTIC HW RETURN -- -t Lu <br /> WATER—__ __ __ __ __—�__ _ --I� (E)FLUE VENT TO J OZ <br /> LINED BRICK CHIMNEY a 0 r- w <br /> z <br /> CAP PIPE CAP OPEN END i SEE SHEEP M2.1 BOILER SCHEMATIC- J J J N W <br /> HYDRONIC PIPING FOR APPURTENANCES _ W <br /> I <br /> 1 <br /> - U m 0 <br /> (E)COLD WATER It <br /> PIPING TO REMAIN �1 Z <br /> 2 m CD <br /> � <br /> U <br /> W <br /> \ CAP OPEN END <br /> �\ COPYRIGHT NOTICE <br /> THIS <br /> ouTmESIGN Is AN UNPUBLISHED <br /> ..... <br /> UND <br /> om ocu NzioF HERuHEIE"snocooe TOTSE <br /> (N)OUTDOOR AIR SENSOR PREVENT ANY UNAUTHORIZED COWING. <br /> SETBACKFOR N L <br /> PUBLICATION OR USE OF THIS DESIGN, <br /> OSA LOUVER 6'X 3' rwo To oeTAlry ouaAcss THEREOF. <br /> AREA OF WORK <br /> M ECH AN CAE ROOM FLOOR PLAN NEW WORK <br /> SCALE: 3\4"=l'-O" <br /> No. Revision/Issue Date <br /> C.STONE <br /> 311„2024 <br /> N HALEY <br /> KEY PLAN d� 3/11/2024 <br /> SCALE: NITS P5835 <br /> N.w.H M2.O <br /> AS NOTED <br />
The URL can be used to link to this page
Your browser does not support the video tag.