My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8717 7TH AVE SE 2024-12-31
>
Address Records
>
7TH AVE SE
>
8717
>
8717 7TH AVE SE 2024-12-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 1:17:49 PM
Creation date
12/17/2024 10:40:30 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
8717
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
IVNEUDORFER •''"''� <br /> ENGINEERS E B� <br /> AN Cter-a COMDAN, <br /> Fan Coil Unit - DX <br /> PROJECT: St. Mary Magdalen Elementary HVAC Project DATE: 8/15/2024 <br /> LOCATION: Everett,WA CONTA Kami Valentine <br /> PROJECT#: 2024-0871 AUTHO <br /> 3.0 Stand By- FCU-03 Functional Performance Test <br /> Verification Response Notes By Date/Time <br /> 1 "TEST PROCEDURE,Set the <br /> heating and cooling setpoints to <br /> match the zone temperature <br /> 1. <br /> 2 Unit is OFF Pass KV 8/7/24 10:58 <br /> SYSTEM/UNIT: FCU-04 <br /> Documentation - Mechanical -FCU-04 <br /> Verification Response Notes By Date/Time <br /> 1 Installation and startup Pass KV 8/8/24 8:59 <br /> documentation submitted <br /> 2 Manufacturer's cut sheets submitted Pass KV 8/8/24 8:59 <br /> 3 Performance data(fan curves,coil Pass KV 8/8/24 8:59 <br /> data,etc.)submitted <br /> Model Verification -Mechanical - FCU-04 <br /> Verification Response Notes By Date/Time <br /> 1 Manufacturer: Mitsubishi KV 8/15/24 9:50 <br /> 2 Model Number: PKY-P18NLMU-ETH KV 8/15/24 9:50 <br /> 3 Serial Number: 36MO2726 KV 8/15/24 9:50 <br /> 4 Electrical:HP,Volts,Phase,Amps Pass KV 8/8/24 8:59 <br /> General -Mechanical - FCU-04 <br /> Verification Response Notes By Date/Time <br /> 1 Access doors close tightly-no leaks Pass KV 8/8/24 8:59 <br /> 2 Casing condition good:no dents, Pass KV 8/8/24 8:59 <br /> leaks,door gaskets installed <br /> 3 Clean up of equipment completed Pass KV 8/8/24 8:59 <br /> per contract documents <br /> 4 Fan area clean Pass KV 8/8/24 8:59 <br /> 5 Maintenance access acceptable for Pass KV 8/8/24 8:59 <br /> unit and components <br /> 6 Unit is labeled NA KV 8/8/24 8:59 <br /> Installation -Mechanical - FCU-04 <br /> Verification Response Notes By Date/Time <br /> 1 Fan and motor alignment appear Pass KV 8/8/24 8:59 <br /> correct <br /> 2 Fan protective shrouds for belts in NA KV 8/8/24 8:59 <br /> place and secure <br /> 3 Filters clean;construction filters Pass KV 8/8/24 8:59 <br /> replaced with final filters <br /> 4 Instrumentation installed according <br /> to specification(thermometers, Pass KV 8/8/24 8:59 <br /> pressure gages,flow meters etc <br /> 5 Vibration isolation equipment <br /> installed&released from shipping Pass KV 8/8/24 8:59 <br /> locks <br />
The URL can be used to link to this page
Your browser does not support the video tag.