My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
8717 7TH AVE SE 2024-12-31
>
Address Records
>
7TH AVE SE
>
8717
>
8717 7TH AVE SE 2024-12-31
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 1:17:49 PM
Creation date
12/17/2024 10:40:30 AM
Metadata
Fields
Template:
Address Document
Street Name
7TH AVE SE
Street Number
8717
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
109
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
NEUDORFER <br /> ENGINEERS N E rB B <br /> Cabinet Unit Heater - Electric <br /> PROJECT: St. Mary Magdalen Elementary HVAC Project DATE: 8/15/2024 <br /> LOCATION: Everett, WA CONTACT: Kami Valentine <br /> PROJECT#: 2024-0871 AUTHOR: <br /> SYSTEM/UNIT: ECH-01 Tested By: Kami Valentine <br /> Date: 8/8/2024 <br /> Documentation - Mechanical - ECH-01 <br /> Verification Response Notes By Date/Time <br /> 1 Installation and startup NA KV 8/8/24 8:38 <br /> documentation submitted <br /> 2 Manufacturer's cut sheets submitted NA KV 8/8/24 8:38 <br /> 3 Performance data(fan curves,coil <br /> data,etc.)submitted NA KV 8/8/24 8:38 <br /> Model Verification - Mechanical - ECH-01 <br /> Verification Response Notes By Date/Time <br /> 1 Manufacturer: NA KV 8/8/24 8:38 <br /> 2 Model: NA KV 1 8/8/24 8:38 <br /> General - Mechanical - ECH-01 <br /> Verification Response Notes By Date/Time <br /> 1 Maintenance access acceptable for Pass KV 8/8/24 8:38 <br /> unit and components <br /> 2 Unit in good condition Pass KV 8/8/24 8:38 <br /> 3 Unit is Labeled NA KV 8/8/24 8:38 <br /> Electrical &Controls - ECH-01 <br /> Verification Response Notes By Date/Time <br /> 1 All control devices and wiring Pass KV 8/8/24 8:38 <br /> complete <br /> Electrical - ECH-01 <br /> Verification Response Notes By Date/Time <br /> 1 Power disconnects labeled Pass KV 8/8/24 8:38 <br /> 2 Power disconnects located within site Pass KV 8/8/24 8:38 <br /> of the unit <br /> 3 Safeties installed Pass KV 8/8/24 8:38 <br /> Controls - ECH-01 <br /> Verification Response Notes By Date/Time <br /> 1 Point-to-point Testing&Sensor Pass KV 8/8/24 8:38 <br /> Calibration Completed <br /> 2 Specified sequences of operation <br /> and operating schedules Pass KV 8/8/24 8:38 <br /> implemented with all variations <br /> documented? <br /> OPT - Mechanical - ECH-01 <br /> Verification Response Notes By Date/Time <br /> 1 Unit has no unusual noise or vibration Pass KV 8/8/24 8:38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.