Laserfiche WebLink
• • <br /> Code Official Use Only <br /> EIApproved Approved with Amendment Denied <br /> Reasons: Signature: <br /> Description of Alternate/Modification (include reason for request): <br /> Waive requirements of C402.5.1.2- Building Test for the small portion of the project where it is <br /> required. <br /> This project is governed by Chapter 5 of the WSEC for existing buildings. Per the exception listed in <br /> C503.3, C402.5 does not apply to basic alteration scope, only where there is a change in space <br /> conditioning. It also applies to the addition scope governed by C502.1. <br /> Description of Code Requirement(include section): <br /> C402.5.1.2 Building test.The completed building shall be tested and the air leakage rate of the building envelope shall <br /> not exceed 0.25 cfm/ft2 at a pressure differential of 0.3 inches water gauge(2.0 Us x m2 at 75 Pa)at the upper 95 <br /> percent confidence interval in accordance with ASTM E 779 or an equivalent method approved by the code official. A <br /> report that includes the tested surface area,floor area, air by volume, stories above grade, and leakage rates shall be <br /> submitted to the building owner and the code official. If the tested rate exceeds that defined here by up to 0.15 cfm/ft2, a <br /> visual inspection of the air barrier shall be conducted and any leaks noted shall be sealed to the extent practicable.An <br /> additional report identifying the corrective actions taken to seal air leaks shall be submitted to the building owner and the <br /> Code Official and <br /> any further requirement to meet the leakage air rate will be waived. If the tested rate exceeds 0.40 cfm/ft2, corrective <br /> actions must be made and the test completed again.A test above 0.40 cfm/ft2 will not be accepted. <br /> Justification (attach copies of any reference, test reports, expert opinions, etc.): <br /> For a project that is more than 20,000 SF of conditioned area, C402.5.1.2 applies to less than 800 SF <br /> of space. Much of this 800 SF contains "open air" connection (no walls or partitions) to portions of <br /> the project that have no air leakage testing or air barrier requirements per Chapter 5. It is impractical <br /> to perform air leakage testing on this part of the project and even testing the few remaining <br /> "enclosed" areas where C402.5 applies would not provide any meaningful benefit, as we would be <br /> demonstrating that a tiny fraction of the overall envelope meets the air leakage maximum targets for <br /> new construction. There is real-world air-leakage reduction that will be achieved as the alteration <br /> scope walls are upgraded per the scope of this project, but again, there is no requirement to actually <br /> conduct an air leakage test for—96% of the project square footage. <br /> Form originally created by: <br /> Seattle Construction Review & Inspection Quality <br /> Ardel Jala, Building Official <br /> Modified for City of Everett <br /> 212 <br />