SOUNDVIEW TECHNOLOGY CENTER EVERETT, WA <br /> Response: On-site stormwater runoff will be collected and transported via a system of catch basins and <br /> underground storm pipes to one of five detention systems. All of the stormwater is being collected, detained, <br /> treated, and released. The detained stormwater will be control-released from the vaults at the historical <br /> discharge rate. See below for the Flow Chart for Determining LID MR#5 Requirements. <br /> Flow Chart for Determining LID MR#5 Requirements <br /> Does the project discharge to Flow Control Exempt Waters <br /> (pet Minimum Requirement(MR)0)j <br /> yes <br /> REQUIRED:Implement the following AMPS No <br /> where feasible: No the project <br /> Does the project trigger-only MRs <br /> AMP TS.13:Post-Construction Sal 41 051(Per Figure 3.2 or Figure triggered only <br /> Quality and Depth 3 3 in Appendix 1 of the 2013 2018 MR 02 No additional <br /> AMP TS 10A,B,or C:Downspout Full WWA Phase II Permit&Phase 1 requirements <br /> Infiltration,Downspout Dispersion Permit.) <br /> Systems,or Perforated Stub-out <br /> Conne tiores No,the project <br /> AMP TS.11 or T9.12:Concentrated Flow triggered MRs 91-09. <br /> Dispersion or Sheet Flow Dispersion Yes <br /> is the project inside the 11GA� <br /> NOT REQUIRE_D.Achieement of the LID <br /> Perform.rn<e Standard.Applying the other No,the project is <br /> AMPS m list#1 or list#2 outside the MA, <br /> Yes <br /> Did the project developer choose to meet the <br /> LID Performance Standard? Is the project on a parcel of <br /> S acres or larger? <br /> No,project developer No <br /> chose List 01. Yet <br /> YPS <br /> Did the project developer <br /> REQUIRED.For each surface, choose to meet the LID <br /> consider the 8MPs in the order REQUIRED:Meet the LID <br /> listed in List let for that type of Performance Standard? Performance Standard through the <br /> surface.Lkc lire first AMP that is use of Iny RMP(s)in the 2014 <br /> considered feasible. Yes SWMMWW except for Rain Gardens <br /> No,project (the use of Bioretention is <br /> NOT REQUIRED.Achievement of dcrcloper acceptable). <br /> the LID Performance Standard, chose List#2, <br /> If the project can't meet the LID <br /> REQUIRED Meet the LID Performance Performance Standard,it must seek <br /> REQUIRED:For each surface, and be granted an exception/ <br /> Standard through the use of 1ny BMP(s)in consider the AMPS in the variance. <br /> the 1014 SW MMWW except for Rain Gardens order listed in list 62 for <br /> (the use of Aloretention is acceptable), that type of surface.Use the REQUIRED:Apply AMP TS-13 Post <br /> first AMP that is conside.Ye•d Construction Soil Quality and Depth. <br /> REQUIRED for Projects Tnittterrna MR 91=96: feasible. <br /> Apply AMP T5.13 Post-Construction Sod PJOT REQUIRED:Applying the AMPS <br /> Quality and Depth. NOT REQUIRED: in List e1 or List 02 <br /> Achievement of the LID <br /> NOT REQUIRED'Applying the RMPs in List al <br /> Performance Standard. <br /> or Lrst R2. <br /> 'Recommended by Ecology for projects triggering MR PI-S. <br /> The BMPs in List#2 (below) was evaluated for feasibility for each type of surface. The first BMP that <br /> was determined feasible was selected for on-site use. <br /> List#2 BMPs: <br /> Lawn and Landscaped Areas: <br /> • Post-Construction Soil Quality and Depth:Determined feasible. <br /> Roofs: <br /> SEPTEMBER 23, 2022 STORMWATER DRAINAGE REPORT PAGE 5 <br />