Laserfiche WebLink
SOUNDVIEW TECHNOLOGY CENTER EVERETT, WA <br /> # Basin A - Photo Description <br /> ram- <br /> ;' Flows are conveyed underneath <br /> the railroad bed by a 24" <br /> reinforced concrete pipe <br /> l <br /> a, 54"x36" CMP culvert with a debris <br /> cage over the inlet. An 18" <br /> 2 emergency overflow pipe is <br /> shown to the right. <br /> • � 0 <br /> Y _ <br /> Concrete headwall area <br /> 'y Y <br /> View of railroad bed and culvert <br /> 3 crossing system with overflow <br /> r t .^ overview. <br /> 4A <br /> SEPTEMBER 23, 2022 STORMWATER DRAINAGE REPORT PAGE 10 <br />