Laserfiche WebLink
SOUNDVIEW TECHNOLOGY CENTER EVERETT, WA <br /> = 2 x 7.97/0.00096 <br /> = 4,097 sf=AS <br /> This equation results in a surface area of 4,097 SF. The pond was designed with a surface area of 5,000 SF at <br /> the top of the sediment storage, which exceeds the minimum requirements for the 70-year flow. The required <br /> area of the orifice was calculated using the following equation: <br /> Ao =AS(2h)05/0.6 x 3600Tgo.5 <br /> =4097 x(2(3.5))0 5/[0.6 x 3600 x 24 x 32.215] <br /> = 0.0327 sf <br /> Converted to the required diameter using the following calculation: <br /> D = 73.54 x Ao0.5 <br /> = 73.54 x 0.032705 <br /> = 2.45" z 2-7/76" <br /> The sediment pond will have a 3.5'minimum depth from top of riser to bottom of live pond along with 7'of <br /> free board and 7.5'of sediment storage for a total depth of 6.0'. <br /> TESC Pond- Basin B <br /> Tributary Area: 11.98 acres (to vault#3 and #5) <br /> Flow Frequency Flow Frequency <br /> Flow(cfs) 0701 Flow(cfs) 0702 <br /> 2 Year = 2.8058 2 Year = 0.7787 <br /> 5 Year = 3.8348 5 Year = 1.0616 <br /> 10 Year = 4.5932 10 Year = 1.2697 <br /> 25 Year = 5. 6428 25 Year = 1.5573 <br /> 50 Year = 6.4935 50 Year = 1.7901 <br /> 100 Year = 7.4054 100 Year = 2.0394 <br /> 10-year flowrate: (4.59 + 1.27) = 5.86 CFS <br /> The required surface area was calculated using the following equation: <br /> SA = 2 x Q 7o/0.00096 <br /> = 2 x 5.86/0.00096 <br /> = 72,274 sf= AS <br /> This equation results in a surface area of 72,274 SF. The pond was designed with a surface area of 73,000 SF <br /> at the top of the sediment storage, which exceeds the minimum requirements for the 70-year flow. The <br /> required area of the orifice was calculated using the following equation: <br /> Ao =AS(2h)05/0.6 x 3600Tgo.5 <br /> =72,274x(2(3.5))05/[0.6x3600x24x32.2151 <br /> = 0.0974 sf <br /> Converted to the required diameter using the following calculation: <br /> D = 73.54 x Aoo.s <br /> = 73.54 x 0.09740.5 <br /> = 4.23" z 4-7/4" <br /> The sediment pond will have a 3.5'minimum depth from top of riser to bottom of live pond along with 7'of <br /> free board and 7.5'of sediment storage for a total depth of 6.0'. <br /> SEPTEMBER 23, 2022 STORMWATER DRAINAGE REPORT PAGE 40 <br />