Laserfiche WebLink
_ • NIL <br /> - E BROTHERS <br /> •� TRAFFIC CONTROL PLAN <br /> i PROJECT: SOUNDVIEW TECH <br /> CENTER <br /> ROAD SCOPE OF WORK: POTHOLE <br /> CONSTRUCTION , FOR EXISTING UTILITY <br /> AHEAD LOCATIONS AND <br /> • . �, <br /> -. ELEVATIONS <br /> WORKING HOURS: 7AM-4PM <br /> ROAD **DISTANCE BETWEEN SIGNS <br /> CONSTRUCTION SHALL BE 100' <br /> AHEAD ' <br /> S - **ROLL SPACING OF 50' TO <br /> 100' BETWEEN WORK ZONE <br /> LOCATION OF AND WORK TRUCK <br /> . , WORK TRUCK WITH MAINTAINED <br /> FLASHING <br /> BEACON <br /> ROAD <br /> NARROWS <br /> r ' J air <br /> NOTES: <br /> 1. SEE ATTACHED PLAN 702 FOR CONE <br /> • AND SIGN SPACING,AS WELL AS OTHER <br /> DETAILS. <br /> 2.TIME RESTRICTIONS FOR THIS TRAFFIC <br /> CONTROL PLAN: NO RESTRICTIONS <br /> . 3.NO PARKING SIGNS(IF NEEDED)SHALL <br /> BE IN PLACE 72 HOURS PRIOR TO <br /> CLOSURE WITH TIME AND DATE CLEARLY <br /> LABELED. <br /> APPROVED <br /> By CHert at 1:42:07 PM,6/3/2022 <br /> 10 <br /> TABLE A <br /> MAINTAIN TWO t• SPEED CONE SPACING BUFFER <br /> �� 11' MIN TRAVEL (MPH) TANGENT(FT) <br /> TAPER SP`F I;G <br /> LANES 25 25 55 <br /> - ` - 30 30 85 <br /> _ 35 35 20 120 <br /> �� r. i _ • i _� ! ' r` • b ' -� _ 40 40 170 <br /> 45 45 220 <br />