Laserfiche WebLink
%a <br /> ROAD [LisOTHERS <br /> CONSTRUCTION <br /> AHEAD ti <br /> TRAFFIC CONTROL PLAN <br /> TRUCK WITH <br /> FLASHING PROJECT: SOUNDVIEW TECH <br /> BEACON CENTER <br /> ONE LANE <br /> ROAD LOCATION OF SCOPE OF WORK: POTHOLE <br /> AHEAD FOR EXISTING UTILITY <br /> WORK - LOCATIONS AND <br /> . .! ELEVATIONS <br /> . WORKING HOURS: 7AM-4PM <br /> o � <br /> • �' **DISTANCE BETWEEN SIGNS <br /> b,J SHALL BE 100' FOR <br /> RESIDENTIAL STREETS (25 <br /> MPH) <br /> **ROLL SPACING OF 50' TO <br /> 100' BETWEEN WORK ZONE <br /> r ONE LANE AND WORK TRUCK <br /> ROAD MAINTAINED <br /> n AHEAD <br /> NOTES: <br /> ` 1. SEE ATTACHED PLAN 701 FOR CONE <br /> AND SIGN SPACING,AS WELL AS OTHER <br /> �N r DETAILS. <br /> t 2.TIME RESTRICTIONS FOR THIS TRAFFIC <br /> .,�. CONTROL PLAN: NO RESTRICTIONS <br /> PARKING SIGNS(IF NEEDED)SHALL <br /> f R BE IN PLACE 72 HOURS PRIOR TO <br /> CLOSURE WITH TIME AND DATE CLEARLY <br /> LABELED. <br /> _ . Y ROAD <br /> CONSTRUCTION APPROVED <br /> w I R •. 7�- AHEAD By CHert at 1:42:17 PM,61312022 <br /> S. ` .J By <br /> MOBILE <br /> MAINTAIN 11' - = POTHOLING OPERATION. <br /> TRAVEL LANE DEAD END ON <br /> i RESDIENTIAL ROAD. USE <br /> ONE FLAGGER FOR SMALL <br /> TRAFFIC VOLUME. <br /> TABLE A <br /> 4 SPEED CONE SPACING BUFFER <br /> (MPH) (FT) SPACING <br /> TANGENT TAPER (FT) <br /> 25 25 55 <br /> 30 30 85 <br /> 35 35 20 120 <br /> 40 40 170 <br /> �3 <br /> 45 45 220 <br /> L <br />