My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
5900 36TH AVE W 2025-01-06
>
Address Records
>
36TH AVE W
>
5900
>
5900 36TH AVE W 2025-01-06
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/6/2025 3:28:40 PM
Creation date
12/18/2024 2:51:38 PM
Metadata
Fields
Template:
Address Document
Street Name
36TH AVE W
Street Number
5900
Imported From Microfiche
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1780
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DESIGN NOTES: Fence Post(By Others) <br /> Reference: AESI,Updated Geotechnical Report,Dated March 31,2000 O. Rubber tired equipment may pass over the geogrid reinforcement at slow speeds Embedded in Sleeve,Chain Link 1 Min.Clearance Each Side <br /> P P " <br /> Packland Site Plan,Sept.1,2015 less than 5 mph.Sudden braking and sharp turning shall be avoided. * Fence of Post <br /> NOTE:Strength of geogrid layers based <br /> The following design assumptions were used: on Geogrid schedule,per Total wall or Guardrail f/) <br /> Internal angle of friction for reinforced soil=32 degrees(design only-see Material P. At the end of each day of operation,the contractor shall slope the last lift of Height,Hi As Required <br /> Note"F") reinforced backfill away from the wall units to direct runoff away from the wall face. <br /> Unit weight of reinforced soil=125 pcf The contractor shall not allow surface runoff from adajcent areas to enter the wall O 0 <br /> Maximum wall height=53.33 feet(Single),44 feet(Tiered) constructjion site. - <br /> Batter of wall=1 H:10V III W <br /> Surcharge=250 psf Surcharge and 2H:1 V Slope. C <br /> Hz 2'-6" III (� Q <br /> TECHNICAL SPECIFICATIONS FOR MECHANICALLY STABILIZED LOCK&LOAD Wall Min. Geogrid LLaay'-r4 = Z <br /> aaa0aa0aa0aa0ag0a <br /> Height 1 <br /> RETAINING <br /> GENERAL: WALLS NOTE: Geotechnical Inspections Shall be <br /> Retained <br /> Geogrid Reinforcement* Soils <br /> A. The work involves the supply and installation of soil reinforced retaining walls.The Required per IBC Ta b I e 1705.6 Upper Tier Lenght:Lz=Li-S Q � W <br /> Concrete Panels and Counterforts will consist of Lock&Load Stone.Counterfort and <br /> Geogrid are the types of soil reinforcement.The work will include,but is not limited 16"(min.) ::;::a.. Geogrid Layer 3 - <br /> to: rrrr� ������������. III - Z <br /> A-1 excavation to the grades shown on the civil drawings Hi Setback:S=10'-0" - co <br /> A-2 supply and installation of geogrid reinforcement Wall Lower Tier(Typ.) <br /> PP Y 9 9 Varies III d <br /> A-3 supply and installation of drainage fill and piping III Height Setbacks(°e <br /> PP Y 9 P P 9 Plant Zone <br /> A-4 supply and installation of segmental Lock&Load Stones Ji o (See Landscape N <br /> A-5 supply and installation of retained and reinforced soil fill GEOGRID SCHEDULEnl Plans W <br /> ) �4"Perforated Drainpipe > <br /> B. The walls shall be installed on undisturbed Native Soils or Structural Fill,as Wall Geogrid -1 ` <br /> 0 U LU <br /> appropriate. Hei ht Len th Layers di Geogrid Layer 2 Retained J Q <br /> 9 9 * 0»:��v��v��v��������v�� Soils <br /> (H1 ft.) (L1 ft.) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 mRootBarrierRoduct a/ <br /> MATERIALS to Line Plant Zone M <br /> 5.33 5.00 A A 2.67 Geogrid Reinforcement* (BioBarrier or Equivalent Drainage Blanket LY <br /> 76'-0" 2'0" Lower Tier Length:Li(See Geogrid Product) As Necessa V <br /> A. Concrete Panels and Counterforts are locked together to form a"Stone".The r� (yv) ( Necessary per 0 <br /> retaining walls have been designed on the basis of Lock&Load Retaining Wall 6.67 6.00 A A * Schedule per Total Wall Height,H,) Geotechnical Engineer) <br /> "Stones".Stones are to be purchased from a licensed Lock&Load manufacturer. 24"mm) <br /> Finish Grade _ Geogrid Layer 1 _ <br /> The Lock&Load trademark on each pallet identifies Lock&Load products. 8.00 7.00 A A A at wan -11B min.)) aeaaeeeeeoeeoeeoeeoe oee ee ee ee...... e�ee�ee� <br /> -- in.) <br /> B. Information on the purchase of Lock&Load products can be obtained through: 9.33 8.00 A A A 2 18"of Well Reinforced <br /> Compacted J' <br /> Lock&Load RetainingWalls Ltd. 10.67 9.00 A A A A 3/a"dean Soil <br /> Crushed Rock <br /> Tel. 604 732-9990 <br /> ( ) <br /> B A A A <br /> 12.00 - <br /> IF <br /> Website:www.lock-load.com 10.00 <br /> -1II-III III _ <br /> 4"Perforated Drainpipe C. Geogrid-See Geogrid Schedule. 13.33 11.00 B A A A A 2"-4"crushed Rock III - NOT Geotechnical Engineer shall <br /> Leveling Course III- - evaluate the need for Supplement <br /> D. Face Gravel-3/4"clean crushed rock.Substitution with comparable material is 14.67 12.00 B A A A A Drainage behind the Reinforcement <br /> acceptable,upon approval of the Geotechnical Engineer. * zone during construction. <br /> 16.00 14.00 C B A A A A - - - - - - - - - - - - - - <br /> NOTE:Wall Toe cover shall be 24"(min.) <br /> E. Reinforced and Retained Backfill-Suitable granular native material approved by the for Sloping Condition in Front of Wall <br /> Geotechnical Engineer. 17.33 16.00 C B A A A A <br /> F. Leveling Pad-The Leveling Pad shall consist of angular,crushed aggregate of 18.67 17.00 C B A A A A A TIERED WALL SECTION • <br /> maximum size of 3/4 inch.The Leveling Pad Fill may be single size or may be well <br /> graded containing a maximum of 5%passing the #200 sieve. 20.00 18.00 C B B A A A A NOT-TO-SCALE <br /> EXECUTION 21.33 19.00 C C B B A A A A <br /> A. Contractor shall excavate to the lines and grades shown on the construction drawings. 22.67 20.00 C C B B A A A A „ <br /> The Geotechnical Engineer should observe the excavation prior to the placement of <br /> the leveling material or fill soils. 24.00 21.00 C C B B B A A A A <br /> B. Over-excavation of deleterious soils or rock shall be replaced with material meeting 25.33 22.00 C C C B B A A A A 2H:1 V Slope <br /> (or Flatter) <br /> the specifications described in the section"Material F"above,and compacted to 95 <br /> ofASTM D-1557-91(Modified Proctor)within 2%of the optimum moisture content 26.67 23.00 D C C B B B A A A A Fence Post(By others) <br /> Is <br /> Of the soil. Embedded in Sleeve, <br /> 1"Min.Clearance Each Side <br /> 28.00 24.00 D C C C B B A A A A 6'_0„ of Post <br /> C. The first course of concrete Lock&Load Stones shall be placed on the Leveling Pad I I I I Max. Chain Link <br /> and the alignment and level checked. 29.33 25.00 D C C C B B B A A A A Fence <br /> or Guardrail <br /> D. Stones shall be placed with the top of the panel level and parallel to the wall face. 30.67 27.00 D C C C C B B A A A A As Required <br /> The Counterfort Base installs horizontal and perpendicular to the face of the retaining <br /> wall. 32.00 28.00 D C C C C B B B A A A A <br /> E. Geogrid shall be oriented with the highest strength axis perpendicular to the wall 33.33 29.00 D C C C C C B B A A A A NOTE:Engineer may Require <br /> 9 9 9 P rP Additional Bury of Wall Toe Based <br /> alignment. 2-6 <br /> 34.67 30.00 D C C C C C B B B A A A A Min. sssssssss� ssigssiassri(st'. Actual Encountered Condition <br /> ) on During <br /> Keyway Construction. <br /> F. Geogrid reinforcement shall be placed at the levels and to the lengths shown on the <br /> drawings beginning at the back of the Lock&Load Panels. 36.00 32.00 D D C C C C C C B A A A A s ss s� Retained <br /> Geogrid Reinforcement soils <br /> G. The geogrid shall be laid horizontally in the direction perpendicular to the face of the 37.33 33.00 E D C C C C C C B A A A A A (See Geogrid Schedule) <br /> retaining wall.The geogrid shall be pulled taut,free of wrinkles and anchored prior to <br /> backfill placement on the geogrid. 38.67 34.00 E D D C C C C C B B A A A A 1 Geogrid Layer 3 <br /> Hi - <br /> H. The geogrid reinforcement shall be continuous throughout their embedment lengths. 40.00 35.00 E D D D C C C C B B A A A A A Wall Height <br /> Spliced connection between shorter pieces of geogrid is not permitted. Reinforced - <br /> 41.33 36.00 E D D D C C C C C B B A A A A o 18"of Well soil III NOTE:Lower Grids may be truncated to <br /> I. The drainage pipe discharge points shall be connected to approved discharge. Compacted - 10'(min.)lengths based on characteristics <br /> 42.67 37.00 E D D D C C C C C B B A A A A A - - - - Clean Crushed Rock and stability of cut per Geotechnical �1 <br /> Engineer approval at time of construction. <br /> J. Reinforced and Retained Backfill shall be placed,spread and compacted in such a rid,•:::. Geo� Laer e <br /> manner that minimizes the development of slack in the geogrid. 44.00 38.00 E D D D D C C C C C B B A A A A m :d%;e�ae�o���������G� �� Retained `o <br /> Soils K. Reinforced and Retained Backfill shall be placed and compacted in lifts not to 45.33 39.00 E D D D D C C C C C B B A A A A A u <br /> exceed 8 inches where hand compaction equipment is used and not more than 12 inches 2.67' Reinforced <br /> where heavy compaction equipment is used.FIRST-compact over tail of Counterfort 46.67 40.00 E D D D D D C C C C C B B A A A A ( ') Soil R <br /> then awayfrom the retaining wall structure.Hand operated compaction equipment * ;i�,.• Drainage Blanket \ <br /> 9 P PFinish Grade 24" min.) As Necessary er <br /> (700 lbs.to 1,000 lbs.)Vibratory Plate shall be used to compact face gravel at wall face. 48.00 41.00 E D D D D D D C C C C B B A A A A A at wall Face Geo rid Layer:#. - ( ry p <br /> L. Reinforced and Retained Backfill shall be compacted to 95%of the maximum density 49.33 42.00 E E D D D D D C C C C C B B A A A A - -fs min.) <br /> i' - Geotechnical Engineer) 0 0 <br /> as determined by ASTM D-1557-91(Modified Proctor)or equivalent.The moisture - NOTE:Geotechnical Engineer shall <br /> content of the backfill material prior to and during compaction shall be uniformly 50.67 43.00 E E D D D D D C C C C C B B A A A A A 2 evaluate the need for Supplement <br /> distributed throughout each layer and shall be within 2 percentage points of the 1�� _ Drainage behind the Reinforcement <br /> optimum moisture content. 52.00 44.00 E E E D D D D D C C C C C B B A A A A ::,"..:; ' zone during Construction. c <br /> M. Hand-operated equipment(700Ids.to 1,000Ids.Vibratory Plate)shall be used within 53.33 45.00 E E E D D D D D C C C C C B B A A A A A =•' a Perforated Drainpipe c <br /> III III III=III <br /> 26 inches of the front face of the concrete facing. 2"-a"crushed Rock *NOTE:Wall Toe cover shall be 24"(min.) � <br /> Leveling Course III- - for Sloping Condition in Front of Wall <br /> N. Tracked construction equipment shall not be operated directly upon the geogrid <br /> reinforcement.A minimum fill thickness of 6 inches is required prior to operation of GEOGRID: A= Miragrid5XT TYPICAL SINGLE WALL SECTION m <br /> tracked vehicles over the geogrid. B = Miragrid 7XT OtJO A. Co <br /> C = Miragrid 10XT pF WAS C <br /> D = Miragrid 20XT NOT-TO-SCALE Q 6 !9 d o tj <br /> E = Miragrid 22XT y 1P Sheet No. <br /> /rr 018 /� <br /> '�'CISTE0 ��� �/V <br /> Fss/ONAIENG <br /> 06/27/2022 <br />
The URL can be used to link to this page
Your browser does not support the video tag.