Laserfiche WebLink
<br />EXHIBIT A <br /> Everett Municipal Building - Public Works Tenant Improvements 12/xx/2024 <br />Change Order No. Two - Exhibit A <br /> <br />No. Construction Change Directives Amount <br />1 CP 5010 CCD 007 Removal of (10) contractor-installed Sanitary Napkin Dispensers from BNB scope. Credit $ (1,402.00) <br />2 CP 5014 Main Entry Screening. Credit $ (4,475.42) <br />3 CP 5017 Window restoration and replacement. Includes replacement and repair of (90) existing exterior window units. <br />Opportunity to replaced failed windows and to Improve the building energy performance. <br />$ 219,777.00 <br />4 CP 5018 T-Mobile platform structure on roof modification. Required to enable reroofing under leased area and comply <br />with warranty agreements. <br />$ 32,468.00 <br />5 CP 5020 Labor and materials to replace and/or install (86) new heating elements into existing HVAC VAV's on all floors. Opportunity to improve quality and performance of existing heating systems throughout the building. <br />$ 410,214.00 <br />6 CP 5038 RFI 163 Credit for BNB F&I of microwave trim kits. Credit $ (2,282.00) <br />7 CP 5041 RFI 162 Level 1 restroom mirror change. $ 4,324.52 <br />8 CP 5043 RFI 216 Painting top of parapet wall in lieu of sealer. $ 1,296.52 <br />9 CP 5046 Added Automatic Door Bottom Sweeps Room 731 $ 489.60 <br /> No. BN Builders, Inc. Change Proposals Amount <br />1 CP 5012 Roof davit investigation. Removed existing sheet metal cap and roofing material around roof davit to review attachment method. Required to expose the ability to obtain hazardous material sampling. $ 1,022.60 <br />2 CP 5013 CCD008 Access Controls. Includes added access control, power/data, and door hardware revisions. Correct <br />oversight in the original plans. <br />$ 36,879.09 <br />3 CP 5015 - CCD 11 & 16 Roof changes and associated details to maintain manufacturer warranty. $ 214,290.63 <br />4 CP 5016 CCD012 Roof Anchors Removal. Furnish/install/certification of (80) new roof tieback anchors. To improve and provide safety measures. $ 71,450.00