My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Viking Construction Group 12/16/2024 Amendment 1
>
Contracts
>
10 Years Then Transfer to State Archivist
>
2025
>
Viking Construction Group 12/16/2024 Amendment 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2024 3:46:19 PM
Creation date
12/18/2024 3:46:10 PM
Metadata
Fields
Template:
Contracts
Contractor's Name
Viking Construction Group
Approval Date
12/16/2024
End Date
2/28/2025
Department
Facilities
Department Project Manager
Joan Olsen
Subject / Project Title
Police Facilities Upgrades
Amendment/Change Order
Amendment
Amendment/Change Order Number
1
Tracking Number
0004458
Total Compensation
$63,747.95
Contract Type
Capital Contract
Contract Subtype
Capital Construction Contracts and Change Orders
Retention Period
10 Years Then Transfer to State Archivist
Imported from EPIC
No
Document Relationships
Viking Construction Group 8/2/2024
(Amendment)
Path:
\Documents\City Clerk\Contracts\Capital Contract\Capital Construction Contracts and Change Orders
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Download electronic document
View images
View plain text
Date: 12/10/2024 <br />Change Order No. 1 - Police Facilities Upgrades Project Exhibit A <br />No.Construction Change Directives Amount Change Order <br />1 Disassemble\Furniture Moving not included in original scope 19,668.22$ CP #1 <br />2 Casework modifications that were not correctly specified 4,178.84$ CP #2 <br />3 Additional painting and resized mirrors not correctly specified 1,128.41$ CP #3 <br />4 Wall demo on 2nd Floor PHQ to include adjacent office 7,845.90$ CP #6 <br />5 Remake of cabinet where measurements were not correctly specified 1,395.63$ CP #7 <br />No.Viking Construction Group Change Proposals Amount <br />1 Repairs to men's restroom rusted metal studs identified and required by City inspector.935.65$ CP #4 <br />2 Additional scope for floor preparation required after demo of original flooring removed.12,816.07$ CP #5 <br />3 Additional scope to provide increased FRP, shower drain kits and trim not called out on <br />drawing provided.4,811.45$ CP #8 <br />Total 52,780.17$ <br />Sales Tax 5,225.24$ <br />Total plus WSST 58,005.41$
The URL can be used to link to this page
Your browser does not support the video tag.