Laserfiche WebLink
Date: 12/10/2024 <br />Change Order No. 1 - Police Facilities Upgrades Project Exhibit A <br />No.Construction Change Directives Amount Change Order <br />1 Disassemble\Furniture Moving not included in original scope 19,668.22$ CP #1 <br />2 Casework modifications that were not correctly specified 4,178.84$ CP #2 <br />3 Additional painting and resized mirrors not correctly specified 1,128.41$ CP #3 <br />4 Wall demo on 2nd Floor PHQ to include adjacent office 7,845.90$ CP #6 <br />5 Remake of cabinet where measurements were not correctly specified 1,395.63$ CP #7 <br />No.Viking Construction Group Change Proposals Amount <br />1 Repairs to men's restroom rusted metal studs identified and required by City inspector.935.65$ CP #4 <br />2 Additional scope for floor preparation required after demo of original flooring removed.12,816.07$ CP #5 <br />3 Additional scope to provide increased FRP, shower drain kits and trim not called out on <br />drawing provided.4,811.45$ CP #8 <br />Total 52,780.17$ <br />Sales Tax 5,225.24$ <br />Total plus WSST 58,005.41$