My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3710 W MUKILTEO BLVD D HARBORS EDGE TOWNHOMES 2025-08-14
>
Address Records
>
W MUKILTEO BLVD
>
3710
>
HARBORS EDGE TOWNHOMES
>
3710 W MUKILTEO BLVD D HARBORS EDGE TOWNHOMES 2025-08-14
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/14/2025 9:52:17 AM
Creation date
12/24/2024 10:06:01 AM
Metadata
Fields
Template:
Address Document
Street Name
W MUKILTEO BLVD
Street Number
3710
Unit
D
Tenant Name
HARBORS EDGE TOWNHOMES
Imported From Microfiche
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
105
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i Permit Inspections <br /> V E R E T T City of Everett <br /> WASHINGTON <br /> Permit Number: P2312-015 Description: Plumbing FOR NEW TOWNHOME HARBOR'S EDGE UNIT D <br /> Applied: 12/11/2023 Approved: 12/12/2023 Site Address: 3710 W MUKILTEO BLVD UNIT D <br /> Issued: 1/18/2024 Finaled: 7/31/2024 City,State Zip Code: EVERETT,WA 98203-1248 <br /> Status: FINALED Applicant:MAR PLUMBING LLC <br /> Parent Permit: B2305-061 Owner:SAGE HARBORS EDGE LLC <br /> Parent Project: Contractor:JBAR PLUMBING LLC <br /> Details: <br /> New Plumbing <br /> SCHEDULED DATE COMPLETED DATE TYPE INSPECTOR RESULT REMARKS <br /> PLUMB 02 JASON <br /> 1/19/2024 1/19/2024 GROUND MORRISSEY APPROVAL see notes <br /> WORK/SLAB <br /> Notes: <br /> 1/18/2024 12:35 PM JBAR PLUMBING LLC <br /> Contact Name:JBAR PLUMBING LLC <br /> Site Address:3710 W MUKILTEO BLVD UNIT D <br /> Phone:4255011159 <br /> e-Mail:javier@jbarplumbing.com <br /> -Rough under slab DWV and water main ok. <br /> 4/24/2024 4/24/2024 PLUMB 03-ROUGH JASON APPROVAL see notes <br /> IN MORRISSEY <br /> Notes: <br /> -Rough DWV and water. <br /> 7/29/2024 7/29/2024 PLUMB 08-FINAL** JASON CORRECTION see notes <br /> MORRISSEY REQUIRED <br /> Notes: <br /> -Dishwasher water supply and drain are not connected.-Master bath left hand lav sink cold supply is leaking and hot supply is off. <br /> 7/31/2024 7/31/2024 PLUMB 08-FINAL** JASON APPRVD-PERMIT <br /> MORRISSEY FINAL <br /> Notes: <br /> I <br /> Printed:Thursday,22 May, 2025 1 of 1 rk <br /> SUPERION <br />
The URL can be used to link to this page
Your browser does not support the video tag.